REGIE C. SOLTIS
601 Ibrahim Building
Al Rigga, Deira
Dubai, United Arab Emirates
Mobile: +971562550858
[email protected]
Work Experiences Summary
· 15 years of experience in Oil and Gas and Construction
· Multidiscipline Estimator/Quantity Surveyor – Civils, Structural, Mechanical, Electrical, Instrumentation and Piping
· Project Control Specialist
Computer Skills
· Microsoft Word, Excel, Power Point
· Primavera P6
· Navish Works, Bentley, AutoCAD and MicroStation
Project Highlights
· MINING – Cobalt and Nickel Electrowinning Plant – VALE – Client Side – Time and Material Contract Newfoundland Canada
· OIL & GAS – CNRL Project – Vacuum Distillation and Diluent Recovery Plant – Tecnicas Reunidas (TR) Canada – EPC side – Lump Sum Contract – Alberta, Canada
· OIL & GAS – Shell Carmon Creek Project – Cogeneration 3 x 205 MW Gas Turbine, Central Processing Plant, Field Facilities & Infrastructure Pipelines and Well-Pad Facilities – Rider Hunt International – Client Side – FID Estimate – Alberta, Canada
· TAILINGS MANAGEMENT – Imperial Oil ATM Project – Rider Hunt International – Client Side – Combination of Lump Sum and Unit Rates Contract – Alberta, Canada
· OIL & GAS – Imperial Oil, Kearl Oilsands Utilities and Offsite Areas – Kentz Canada – Subcontractor – Unit Rate Contract – Alberta, Canada
· LNG PROCESSING PLANT – RAS GAS (Qatar Petroleum and Exxon Mobile), LNG Train 6 & 7 and Al-Khaleed (AKG-2) LNG – LNG Processing Plant – Chiyoda and Technip Joint Venture (CTJV) – EPC side – Combination of Lump Sum and Unit Rates Contract – RLIC, Qatar
· OIL & GAS – CNRL Project, VDU & DRU Phase 1 – Technip Italy – EPC Side – Lump Sum Contract, Alberta Canada
· POWER STATION – CLP (China Light & Power), Penny’s Bay and Black Point Power Station – Client Side – – Hong Kong, China
· TRANSIT TRAIN SUBSTATION – KCRC. Nam Cheong Substation – WSP Asia – Engineering – Hong Kong, China
· COMMERCIAL, HIGH RISE & RESIDENTIAL BUILDING PROJECTS – Energy Management Systems Inc. – Construction – Manila, Philippines
Professional Background
Vale Canada
Quantity Surveyor / Project Control Specialist
April 2016 to Oct 2016
Nickel and Cobalt Processing Plant – Long Harbour, Newfoundland Canada
Site Walk-down review of Contractor’s Installed Quantities ensuring Contractors are reporting correctly.
Establish and monitor project’s Key Commodities Progress report
Analysis of progress report against the baseline schedule.
Analyse Drawings, specifications and Scope of Work of activity networks for project resource of planning and scheduling.
Review, investigate and approval of Contractor’s Change Order Cost proposal.
Tecnicas Reunidas Canada (TR Canada)
Quantity Surveyor / Estimator
September 2015 to March 2016
CNRL Horizon Project – Vacuum Distillation Unit and Diluent Recovery Unit
Measurement and monitoring of Subcontractor progress against project management plan.
Assessing performance to identify whether any corrective or preventive actions are indicated, and recommending those actions as necessary.
Provide information to support status reporting and progress measurement
Verifying Subcontractor Actual installed in accordance to the Contract Scope of Work.
Review Fabrication Yard Shipping Dossier to verify and identify all additional work such as shipped-loose items and any carry over work not completed by the fabricator as additional to Field Subcontractor scope.
Rider Hunt International (Alberta) Inc.
Quantity Surveyor / Estimator
June 2012 to May 2015
Shell Carmon Creek Project – Oil and Gas Central Processing Unit (Feb 2013 to May 2015)
Includes 3 – 205 MW Gas Turbine Combine Cycle Cogeneration Plant, Central Processing Facilities, Well Pad Facilities and Infrastructure Pipelines connecting each Well Facilities to CPF.
Develop Cost Estimate for Final Investment Decision (FID).
Develop Basis of Estimate.
Involvement in Cost and Schedule Risk Assessment.
Provide support of developing Field and Modularization Scope of Work.
Develop Pricing Preamble as part of the Contract Documents.
Provide support to Lead Estimator producing pricing attachments for bid documents to Contractors.
Perform Bid analysis and produce commercial reports to client.
Provide support to Planning and Scheduling developing Detailed Activities, WBS and Resources as per Detailed Cost Estimates Data.
Develop Fabrication Works Cost Estimate based on selective fab-yard location as provided by Client.
Develop Benchmarking for future purposes.
Syncrude – ATM Project – Tailing Management Facilities (June 2012 to Jan 2013)
Review Contractor’s Proposal based on Contract Documents.
Coordinate disputed items to Contractor for resolution
Participate as Management Supports for Contract Cost Negotiations
MTO of Design and IFC Drawings to check Contractors submitted Cost Proposal.
Kentz Engineers & Contractors
Quantity Surveyor / Estimator
February 2011 – May 2012
Imperial Oil – Kearl Oil Sand Project – Oil and Gas (Utility Area)
Develop Progress and Productivity Report using CCMS Software.
Perform Project Progress and Productivity reviews, attend all meetings regarding current project status against Construction Schedule.
Site visits to audit Actual Man-hours reported aligns to Earned Hours as per current installed.
Coordinate to Engineers regarding probable Additional Works as Change Order
Cost Estimate of Additional Works
Chiyoda – Technip Joint Venture
Quantity Surveyor / Estimator
July 2009 – September 2010
Ras Gas – LNG Plants (Train 6, Train 7 & AKG-2)
Review Contractor’s Proposal based on Contract Documents.
Coordinate disputed items to Contractor for resolution
Participate as Management Supports for Contract Cost Negotiations
MTO of Design and IFC Drawings to check Contractors submitted Cost Proposal.
Technip Italy SPA
Cost Control Specialist
March 2007 – November 2008
CNRL – Primary Upgrading Project – Fort Mcmurray, Alberta Canada
· Develop and maintain progress & productivity report.
· Site monitoring of actual status of the project.
· Attend Weekly Progress & productivity meeting.
· Review Contractor’s Invoices.
· Establish and maintain cost breakdown structure to monitor budgets and other parameters for complete project scope based upon approved estimate.
· Provide analysis as per Cost Incurred and progress status.
· Review and Evaluate Subcontract Change Order.
DG Jones & Partners Ltd.
Electrical Quantity Surveyor
June 2003 – September 2004
CLP – Penny’s Bay & Black Point Power Station
Review and application of Contract Bid Documents.
Develop and Price BOQ as per Contract Documents.
Solicit price for material quotations to Vendors and suppliers.
WSP ASIA
Electrical Engineer
March 2000 – January 2002
KCRC – Light railway Transit – Nam Cheong Railway Station
Develop design and Calculations for Power, Lighting and Cable Tray System.
Attend Discipline Meeting for coordination of design related to site elevation.
Facilitate design output for Auto CAD to Draftsmen.
Review and Aprove Auto-Cad/Micro station drawings to finalize design.
Energy management Systems Inc.
Senior Electrical Estimator
March 1996 – January 2000
High Rise and Commercial Buildings
Attend pre-bid meetings for Electrical.
Site inspection of project involved for bid proposal.
Review and application of Contract Bid Documents.
Develop and Price BOQ as per Contract Documents.
Solicit price for material quotations to Vendors and suppliers.
Education
Bachelor of Science in Electrical Engineering
Central Philippine University
March 1993
Organizations
Registered Electrical Engineer
AACE Member
REFERENCES
To be provided as per request.