—————————————————————————————————————————————

OBJECTIVE

—————————————————————————————————————————————

To be associated with an institution where I can enhance and secure my potential and knowledge.

 

 

—————————————————————————————————————————————

PERSONAL DATA

—————————————————————————————————————————————

Address:                                                     Block 1 Lot 21 Ph. 1 Celina homes 5 Tagapo Santa Rosa, Laguna Philippines

Birthday:                                                     April 29, 1973

Birthplace:                                                  Tondo, Manila

Height:                                                         170 cm.

Weight:                                                         74 kgs.

Civil Status:                                                  Single

Gender:                                                          Male

SSS I.D.:                                                        33 0992759 3

TIN :                                                               151 453 547

Passport No.:                                                EB8393155

Education

June 2014 - September 2014 Housekeeping NC2 at Jacobo Z. Gonzales Memorial School of Arts and Trade (TESDA)

Graduate

June 2011 - May 2013 Hospitality and Restaurant Services at Systems Technological Institute (STI College)

Graduated with Honors

Experience

October 5, 2014- November 30, 2016 Assembler at Saudi Airconditioning Manufacturing Company Ltd. (Juffali Carrier)

Duties and Responsibilities:

• Ensure that all materials needed are available.
• Put materials needed on the right place of working area.
• Check materials before mounting/fixing.
• Put defective materials inside the rejection box.
• Mount/fix the parts using pneumatic drivers.
• Maintain the cleanliness in the designated area.

October 01, 1992 - March 31, 2009 Assembler/ Quality Control Staff at Panasonic Manufacturing Philippines Corporation

Duties and Resposibilities:

Assembler
• Ensure that all materials needed are available.
• Put materials on the right place of working area.
• Check materials before mounting/fixing.
• Put defective materials inside the rejection box.
• Read and follow operating instruction guide.
• Mount/fix the parts using pneumatic drivers.
• Maintain the cleanliness in the designated area.

Quality Control Staff
• Conduct 100% RoHS testing on all incoming materials using XRF machine.
• Get 1 sampling unit in every 100 outgoing finished goods.
• Conduct 100% testing using stopwatch, calipers, string gauge, tourqe meters, power meter and Dial caliper inside isolated testing room.
• Conduct 5 days mini reliability testing.
• Maintain the cleanliness in the designated area.