Optimun Solution Inc.
25 San Miguel Ave, Ortigas Center, Pasig, 1605 Metro Manila
Project Manager / Project Control
Railway Project (JICA Project)
January 22, 2018 Up to Present
ARMED FORCES OF THE PHILIPPINES
Philippines
Philippine Airforce
December 09 2014- December 09 2017
• Presidential Security Group
• Radio Man
• Security
• Electrical Engineer / Electrician
• Rigger Signal
• Generator Operator / Technician
• Facilities Maintenance
SAN TECHNOLOGY INC. STAP (Hitachi Metals Group)
Lot 7 Block 15 Phase 3 Cavite Economic Zone Rosario, Cavite
Maintenance Engineer
Nov 28, 2013 – Feb 26, 2014
· Repairs and maintain the Production Plating Line such as Manual and Automatic Nickel Plating Line Machines, Chemical Pumps and Motors, Spin Dryer Machines, Air Blow Dryer Machine, Vacuum Dryer, Generator Set 750 KVA and 1000 KVA
· Service entrance installation, Cable pulling and Termination of main cable supply from Generator Set to Control Room
· Set-up and maintains a recording system for Machine/Equipment performance, history and PM works done. Review all materials requisition and assure the availability, economical stock quantity of spare parts and supply.
· Check/assist all Maintenance technicians in doing major repair works. Ensure that machine/equipment are check and test for reliable and safety operation.
· Monitor and analyse day to day machine and equipment operation. Review its history and make revisions of necessary preventive maintenance work.
· Make weekly, monthly and quarterly report pass to supervisor
JBPL Electrical Consultancy and Engineering Services
(Design, Installation, Maintenance, and Construction Project Management)
Electrician
Naic, Cavite
April 2012 – May 2013
· Electrical wirings and mechanical production machines installation to PEZA registered industrial buildings in Cavite and Laguna Special Economic Zones
Techno-comm Spectrum Inc.,
Commissioning Engr.
Naic, Cavite
April 2011 to 2012(on Call)
Installation of equipment such as BBU(base Band Unit) Antena and BTS