Photo

Reden Pangilinan Manoy QA/QC Piping Inspector

Balanga City

C U R R I C U L U M     V I T A E

NAME                                     :           REDEN P. MANOY

ADDRESS                              :           No.772 Sta. Monica Village, Upper Tuyo

Balanga City, Bataan, Philippines

Education                             :           B.S. Mechanical Engineering

E-mail Address                    :           [email protected]

Mobile No. (Phil.)               :           +639213680298

 

CAREER PROFILE
Has over 24  years experience in Construction  Management, Supervision, Inspection and Commissioning, having extensive  Onshore and Offshore experience, Greenfield/Brownfield project  throughout Oil and Gas Technologies, Power Plants, Desalination Plants, Process Plants, Complex facilities and Electro Mechanical Systems with projects ranging from Client/PMC, HAZOP study, EPCM, EPC development, Excellent Presentation, Coordination, and Interpersonal skills utilized to develop strong working relationships with Team members, Clients, Vendors, Sub-Contractors, and Technical Licensors. Ability to stay focused and manage under pressure, time management skills   with multiple priorities, involves in multidisciplinary team effort, continuously updating, and adding to qualifications & specialized expertise. Capable of working alone as part of a team at any level with strong commitment & dedication to work.

 

CORE COMPETENCIES & QUALITIES
·      Conversant in all aspects of Piping, Mechanical & Electro-mechanical system. Demonstrated capabilities in  interpreting construction drawing, specifications, various international engineering code and standard such as ASME, API, BS, EN,ISO, ASTM, NFPA.

·      Able to develop specifications for construction, installation, & commissioning of various rotating/ static equipment, storage tank and piping system.

·      Providing technical support to construction operation, risk assessments, quality and constructability.

·      Conversant in inspection and quality plan development such as ITP, inspection checklist, Quality Assurance, conformance verification & surveillance inspection.

·      Able to undertake, lead investigations and problem solving of complex issues being referred for advice or decision, such as engineering queries, non conformity report, answering RFI.

·      Proven technical competency and supervisory experience, including setting goals and objectives, project development, work planning organization and progress monitoring.

·      Conversant in piping/pipeline/mechanical/ welding, NDE inspection, test package preparation, hydro and pneumatic test execution ,painting & coating, integrity inspection, warranty maintenance and condition monitoring for machinery rotating  equipment.

·      Conversant in packaged equipment vendor’s data review, technical clarification, bid evaluation, valve and equipment pre-selection. Able to perform technical audit and analysis of vendor premises.

·      Conversant in System/Sub-system limits and boundaries, Mechanical Completion, work packs and hand over, systems walk down punch listing and closeout

·      Able to handle installation and inspection of various mechanical, electrical and instrumentation  equipment, Material receiving inspection, preservation of materials and equipment

·      Conversant in lubrication system application of rotating machinery equipment.

·      Able to manage/execute pre-commissioning / commissioning, and Tie-in activities.

·      Conversant in HSE matters covered by OSHA,OSHAS, Job Safety Analysis, Permit to Work System, Lockout-Tag out (LOTO)  program, Proactive in HSE management program

 

 

WORK HISTORY
1) NAME of COMPANY       :           WHESSOE Philippines Construction Inc.
PROJECT                          :         PETRON PPI – Plastic Plant/Isabela-Maris                                                                            Hydroelectric Power Plant/ JGC Navotas Tank Farm
LOCATION                                    :           Limay, Bataan, Philippines

POSITION                                    :           Site Superintendent

INCLUSIVE DATE                        :           April 27, 2017 – May 10, 2018

 

DUTIES & RESPONSIBILITIES:
·      Responsible for the fabrication and installation of the entire piping systems for coal and gas fired power plant projects.

·      Mediate on designs for the bulk storage of natural gas as a liquid.

·      Coordinates construction and commissioning of oil and gas storage terminals, hydraulic steel structures for hydro electric power projects.

·      Liaises personnel and staffs for the piping systems and electro-mechanical  installation services including insulation systems and repair and maintenance activities for thermal power generation projects.

·      Review AFC drawings for gates, steel tunnel linings and penstocks for hydro electric power generation projects prior to fabrication.

·      Review submittal documents as directed.

·      Monitor all installation of pipe work systems and fabrication/erection of structural steelwork for thermal power generation project.

·      Administration of corrective action specially on NCR’s or Non Conformance Reports.

·      Collate and review all workshop & construction plant & equipment ready to mobilize.

·      Track record of operating fabrication and construction facilities in remote locations.

·      Hire and assign construction work to each project.

·      Coordinate all construction services and activities.

·      Maintain strict build-out construction schedule and make changes as necessary to ensure deadlines are met.

·      Maintain a daily job site log.

 

2) NAME of COMPANY       :           MODEC-TOYO Offshore Production System

PROJECT                           :           FPSO MV24 and MV26 Capacity 1.6M BBLS

LOCATION                                    :           Cidade de Mangaratiba, Brazil

POSITION                                    :           QC Mechanical/Piping Inspector

INCLUSIVE DATE                        :           May 27, 2014 – December 10, 2016

 

DUTIES & RESPONSIBILITIES:
·      Control of quality related documents and records as defined in Quality Manual and procedures.

·      Verification and witness of mechanical and piping works in accordance with established ITP’s at different stages of the project execution.

·      Administration of Corrective Action specially on NCR’s or Non Conformance Reports.

·      Examine mechanical units to ensure proper quality and adherence to safety standards.

·      Monitor the mechanical/piping works for conformance with the provisions of the Contract Documents and the Procedures manual.

·      Conduct motor run test during no load and full load operation and check all vibration, temperature, noise decibels, rpm and starting current for the running motors.

·      Investigate code compliance complaints and resolve or refers complaints to appropriate staff.

·      Inspect materials, products, and work in progress for conformance to specifications.

·      Review submittal documents as directed by the Sr. Engineer.

·      Attending weekly coordination meetings with client along with project manager and resolving the day-to-day problems rising in the sites.

·      Walkdown inspection by punchlisting.

·      Complete RFI as per ITP

·      Process certification of equipment and system after MCC.

·      Offshore PTW coordinator:

§ Ensures strict implementation of PTW rules at work locations.

§ Coordinates and participates in work permit co-ordination meetings.

§ Audits the Permit to Work Procedure and ensure compliance on a daily basis.

§ Providing a quality check on the completion of permits and certificates and ensuring all the necessary signatures have been obtained and informing the OIM, PA of any potential conflicts.

§ Coordination with Permit Office to reflect the current status of all permitted work and isolations.

§ Ensuring that PTW updates/changes are effectively communicated to all relevant personnel.

§ Takes part and contributes meaningfully during PTW review meetings.

§ Ensure a PTW tracking system is in place. Keeps track of valid work permits and ensures closure of work permits on completion of work. Ensures expired work permits are closed, cancelled or renewed as the case maybe.

3) NAME of COMPANY       :           JACOBS Consulting Engineers

PROJECT                           :           Marafiq SWRO-4 100,000 m³/d (26.4 MGD)

LOCATION                                    :           Jubail, Kingdom of Saudi Arabia

POSITION                                    :           Project Engineer – Mechanical

INCLUSIVE DATE                        :           March 11, 2013 –April 30, 2014

 

DUTIES & RESPONSIBILITIES:
·      Attending Factory Acceptance Test (FAT) as partial commissioning and qualification of equipment and/or systems prior to their shipment from the fabricator’s site.

·      Provide daily supervisory surveillance checks and records. Ensure Contractor to execute the contracted works as per contract schedule and targets.

·      Ensure all quality control checks and tests are instigated, with records maintained and available as required for underground metallic and non-metallic checks, pre and post test checks, hydrostatic testing, flushing and drying , safety relief valve installation etc, all in accordance with contractors’ agreed ITP, method statements and project specifications.

·      Identify the hand over sequence on a system by system, area by area basis, all scheduled to produce logically planned work completions for commissioning and start-up requirements.

·      Ensuring the construction interfaces and coordination are managed efficiently to facilitate swift resolution of any technical queries at site.

·      Report on defective work and non conformities, assist in identifying root causes of problems and the resolution and clearance of reported problems.

·      Identify and participate in resolution of non conformances.

·      Over all inspection on installation, testing and commissioning of industrial equipments including tanks, vessels, rotating equipment and piping system.

·      Perform and/or coordinate pressure equipment and pipeline integrity inspections.

·      Conduct punch listings on all walk down activities for every system finished prior to commissioning.

·      Comply with Health, Safety & Environmental Regulations.

 

4) NAME of COMPANY       :           RABIGH ELECTRICITY COMPANY

PROJECT                          :           RABEC IWPP Project (2x660MW)

LOCATION                                    :           RABIGH CITY, K.S.A.

POSITION                                    :           Mechanical Supervisor

INCLUSIVE DATE                        :           June 01, 2011 – January 02, 2013

 

DUTIES & RESPONSIBILITIES:
·      Review of contracts, scope of work and technical specifications during tender and pre-mobilization stages.

·      Preparation of daily and weekly mechanical commissioning scope of works.

·      Coordinate erection department in construction deficiency.

·      Conduct motor run test during no load and full load operation and check all vibration, temperature, noise decibels, rpm and starting current for the running motors.

·      Over all inspection on installation, testing and commissioning of industrial equipment including tanks, vessels and rotating equipment.

·      Collate and review all testing reports instigated prior to safety release clearance to energize.

·      Conduct punch listings on mechanical and piping works walk down activities on every system finished prior to commissioning.

·      Monitoring of commissioning testing activities and designate testing engineers and technicians in priority works.

·      Providing quality control function during the execution of EPC contractor or project works related in coating (painting) and insulation.

·      Perform and/or coordinate pressure equipment and pipeline integrity inspections.

·      Review test packages prior to final closure.

 

5) NAME of COMPANY       :           ILF BERATENDE INGENIEURE GMBH

Consulting Engineers

PROJECT                          :           Shuqaiq II IWPP Project (3x340MW)

LOCATION                                    :           Shuqaiq, Jizan Province, K.S.A.

POSITION                                    :           Senior Mechanical/Piping Inspector

INCLUSIVE DATE                        :           June 04, 2009 – April 30, 2011

 

DUTIES & RESPONSIBILITIES:
·      Representing as a Client overseeing contractors and subcontractors site execution functions. As a Client main advisor on a site working with subcontractors, operatives, and crafts people.

·      Participates to plan the work to be done and organize things to ensure deadlines are met. Resolve issues concerning technical or any other crop up problems.

·      Has the authority to reject items that having been inspected, are found to be out of compliance with the standards and specifications applied to a particular scope of work.

·      Develop, maintain and/or control quality records, including engineering packages, inspection reports, non-conformance reports and other necessary documentation.

·      Making a day to day basis report on all initiated activities @ turbine building, desalination and boiler areas.

·      Conduct punch listings on all piping and mechanical walk down activities for every system finished prior to commissioning.

·      Supervise and checks piping activities, pipe trench excavation, pipe laying, pipe jointing and pipe joints pressure and leak testing and pipes backfilling.

·      Witnessing of HYDRO / PNEUMATIC testing for cleared piping lines.

·      Responsible for the review and closure for acceptance on every punch items carried out by the contractor.

·      Usually in charge of health and safety on the construction site.

 

6) NAME of COMPANY       :           SAUDI BASIC INDUSTRIES CORP. (SABIC)

PROJECT                          :           Ibn Rushd PET Conversion & DBN Project

LOCATION                       :           Yanbu, Kingdom of Saudi Arabia (KSA)

POSITION                       :           QC Mechanical/Piping Inspector

INCLUSIVE DATE            :           March 01, 2007-May 11, 2009

 

DUTIES & RESPONSIBILITIES:
·      Serve as the Management Representative for the Quality System

·      Ensure that processes needed for the Quality System are established, implemented and maintained.

·      Participates in testing and start-up of equipment upon completion of work.

·      Witnessing of HYDRO / PNEUMATIC testing for cleared piping lines.

·      Ensures that all mechanical maintenance services are provided safely and efficiently in accordance with internationally recognised engineering standard.

·      Administration of Corrective Action specially on NCR’s or Non Conformance Reports.

·      Control of quality related documents and records as defined in Quality Manual and procedures.

·      Liaises with manufacturer’s representatives as required in the installation, commissioning and post commissioning periods.

·      Supervise and checks piping activities, pipe trench excavation, pipe laying, pipe jointing and pipe joints pressure and leak testing and pipes backfilling.

·      Process certification of equipment and system after MCC.

·      Walkdown inspection by punchlisting.

·      Complete RFI as per ITP

 

7) NAME of COMPANY       :           LINDE CONSTRUCTION CO. LTD.

Saudi National Industrial Gases

Gas-Phase VII Air Separation Unit

LOCATION                        :           Al-Jubail, Kingdom of Saudi Arabia

POSITION                        :           Mechanical/Piping Supervisor

INCLUSIVE DATE            :           June 09, 2005-Feb. 28, 2007

 

DUTIES & RESPONSIBILITIES:
·      Provides field supervision over work execution. Includes reviewing contractor regular reports, assessing their performance and providing advice as necessary.

·      Ensures that all mechanical and piping construction work undertaken meets the standards identified in the applicable specifications and procedures.

·      Review all AFC drawings transmitted by the Contractor prior to fabrication.

·      Gives clear, concise and understandable instructions to Contractors to avoid confusion, re-work and errors. Follows up with Contractor to ensure compliance with requirements.

·      Makes decisions independently on engineering problems and methods and represents the department in meetings, answers questions and coordinates work.

·       Involves in Detail Engineering activities like handling major rotating equipments like Pumps, Compressors (Centrifugal & Reciprocating), Fans, Agitators, Material Handling equipment, Cooling tower, Turbines and HVAC Packages.

·      Monitor the quality of construction works and input into quality records as evidence of witnessing and approving tests and inspections as identified in the quality plans (ITP).

·      Supervise and checks piping activities, pipe trench excavation, pipe laying, pipe jointing and pipe joints pressure and leak testing and pipes backfilling.

·      Witnessing of HYDRO / PNEUMATIC testing for cleared piping lines.

 

8) NAME of COMPANY       :           TOYO ENG’G. COMPANY (T.I.J.D)

PROJECT                          :           South Pars Gas Field Phases 6, 7 &8 Onshore

Project

LOCATION                                    :           National Iranian Oil Company, Assalouyeh, Iran

POSITION                                    :           Piping Supervisor/Inspector

INCLUSIVE DATE                        :           Oct. 09, 2004– May 01, 2005

 

DUTIES & RESPONSIBILITIES:
·      In-charge in project implementation, erection, monitoring & supervision in all mechanical and piping installations.

·      Interpretation of contract documents, reviews approved plans and specifications; prepares construction schedule and coordinate the same with the designated Planning Engineer.

·      Coordinate closely with Contractor’s site Engineers to give emphasis the timely completion of piping works and its quality.

·      Conducts regular meeting to all site Supervisors in updating the accomplishment and target work schedules.

·      Coordinates w/ the Owner Representatives and trade Consultants.

·      Provide technical assistance to Senior Engineers. Assist in checking, review and approval of Contractor’s Method Statement, Material Submittal, Inspection and Test plan (ITP) and drawing change at site.

·      Ensure that all piping works are in compliance with approved drawing and specifications.

·      Witnessing of HYDRO / PNEUMATIC testing for cleared piping lines.

·      Supervise and checks piping activities, pipe trench excavation, pipe laying, pipe jointing and pipe joints pressure and leak testing and pipes backfilling.

 

9) NAME of COMPANY       :           SOUTHERN COMPANY

PROJECT                          :           Sual Power Station (2x600mw Power OP)

LOCATION                       :           Sual, Pangasinan, Philippines

POSITION                       :           Mechanical/Piping Supervisor

INCLUSIVE DATE           :           May, 1997-December, 1999

 

DUTIES & RESPONSIBILITIES:
·      Responsible for administration of construction contract works with prompt exchange of correspondence, submittals, and RFI’s to all contractors.

·      Orient, assign, and supervise the construction inspection staff on a daily basis so that all contractor activities are adequately covered.

·      Coordinate the interface of the construction work with other contractors on the site. Orient inspectors to verify that contractor is following his approved site Health & Safety plan.

·      Review the contractor’s progress at all times. Monitor the material incorporated in the work, the materials stored at the site, and the contractor’s manpower and equipment.

·      Attend weekly, monthly, and other progress meetings held at the site as required. Identify constraints and recommend corrective measures.

·      Coordination with contractor’s supervisory personnel regarding schedule, sequence, and method of work.

·      Continuous inspections and consultation with the SRE including the preparation of written and oral reports on contractual and procedural matters.

·      Supervise and checks piping activities, pipe trench excavation, pipe laying, pipe jointing and pipe joints pressure and leak testing and pipes backfilling.

 

10) NAME of COMPANY    :           D.J. Roque Construction Company

PROJECT                          :           Bataan Refining Company,

LOCATION                       :           Limay, Bataan, Philippines

POSITION                       :           QC Piping Inspector

INCLUSIVE DATE           :           February, 1990-Nov., 1996

 

DUTIES & RESPONSIBILITIES:
·      Assigned to review and study piping standards, specification and plan drawings, piping and instrumentation diagrams (P&ID), schedule and sequence of piping fabrication and erection.

·      Monitor fabrication and erection status and raising of site technical queries (STQ) if ever observed.

·      Conduct actual site inspection, monitoring and verifying if piping installation is in conformance with the approved drawings.

·      Monitor on on-going clearing of punch listed items before and after testing and including final reinstatement punch for final closure of test packages.

·      Witnessing of HYDRO / PNEUMATIC testing for cleared piping lines.

·      Review all the documents needed for piping fabrication such as isometric drawings, pipe support standards, material specifications.

·      Preparation of spool drawings needed for pre fabrication and assign to shop’s respective personnel.

·      Weld-mapping for every approved for construction (AFC) drawings.

·      Verify if all proper procedures are being followed as per inspection and test plan (ITP). Acceptance criteria are always observed.

·      Verify if all welding personnel are qualified and follow correct WPS.

·      Awareness for all safety standards including PPE’s and if all safety measures are being followed. Housekeeping is implemented after a day’s work.

 

TRAINING/SEMINARS ATTENDED:
·      Radiographic Test Film Interpretation (RTFI) APEX Engineering Services Philippines

·      Valid KSA driver’s license 2013 to 2018

·      Platform`s Basic Safety Course (PBSC Cert.# 5890377) – validity : 25/06/2020

·      Helicopter Underwater Escape Training (HUET Cert.# 5890382) validity : 22/06/2019

 

·      REFERENCES:          Issued upon request

 

I hereby certify that the foregoing information is true and correct to the best of my knowledge and belief.
 

REDEN P. MANOY