GENERAL BACKGROUND
Within 26 years of consolidated work experienced in comprehensive range of engineering, construction and skilled trade works in horizontal and vertical construction plus knowledge acquired in various training made us readily equipped to take on more challengeable task. Involved in Project Management of various projects such as Building Towers, Military Camp, Petro Chemical Plant, Gas Processing Plant, Pipeline and Marine Terminal, Aviation Fuel Farm, Forward Fuel Farm, Air Craft Engineering Support Buildings, Airport Main Terminal Building, Residential Buildings, Hospital and School Buildings. Performed various engineering functions with emphasis on Project Planning and Scheduling, Design, Drafting, Material Take Off, Quality Assurance, Quality Control, Documentation Control, Procurement of materials, Building Surveying as well as Supervision of material, equipment and manpower at site. Well verse in computer soft wares such as Primavera (P3 to P6 – Rel 17 ), MS Project, Microsoft Office, AUTO-CADD and STAAD III. Widely exposed in performing manual work of various trades such as Earth Works, Installation of U/G Services, Reinforced Concrete Works, Erection of Steel Structures, Installation of MEP’s and Architectural Finishing Works. Enable to operate EDM (Total Station), Laser Level and various Construction Portable Power Tools & Light Equipments. Holder of KSA, UAE Driver’s License (Code 2) and Philippine Reg. Civil Engineer.
TOTAL TECHNICAL ACCOMPLISHMENT
· Established & Implimented processes and standards for developing, updating, monitoring, reviewing and analysing of Baseline (EPC fully loaded with material quantities,manpower,equipment & cost), Progress and Look ahead schedules.
· Developed Baseline Schedule, Recovery Planned Schedule and Revised Baseline Schedule.
· Updates, Maintenance, Analyses Schedule (Critical path analysis, Delay impact analysis, Earned Value analysis, forecast completion Analysis, Extension of time claim Analysis) and make recommedations to resolved issuies. Prepared look ahead schedule and weekly/monthly progress reports.
· Prepared engineering and technical document such as detailed Shop Drawing, Method Statements, Material Take-off, Bar Cutting list, Sketches, etc.
· Implemented Quality Assurance Procedures and carry out Quality Control activities on site, such as document control, purchasing, handling and storage of material/ equipment, handling of Inspection, Testing and Nonconformance work..
· Implemented Health and Environmental Safety Plan. .
· Carried out daily construction operations at site such as supervision of Manpower, Materials and Equipments and shop drawings.
· Performed survey works such as establishing of controlled points and setting out of alignment, verticality and level of structures.
SUMMARY OF EMPLOYMENT:
1. Senior Planning/Scheduling Engineer / August 05 2014 –
BAM International bv
JNIAT – International Airport Project (Tanzania Africa) Main Terminal Building including its Airside & Landside infrastructure using
Primavera(P6), MS Project and Microsoft Office Software in the development and control of Over-all Project Management Services for Construction of. Performed Planning, Scheduling & Project Controls in order to project w/n time & budget.
Lead Project Management Team to performed Planning & Scheduling works as detailed.
· Develops baseline schedule program (EPC fully loaded with Material quantities, Manpower, Equipment & Cost thru Primavera P6-rel 17, MS Project & MS office software).
· Establishes processes and standards for data gathering (progress % completion), Progress Measurement & Reporting Systems.
· Performs jobsite visit to record actual progress percent completion of construction activities on site.
· Review and lead subcontractor’s planner with regards to schedule.
· Participate in the preparation of Tender Event Schedule.
· Updates, review progress schedule and maintain as a workable progress schedule. Prepare recovery plan and or revised progress schedule as required.
· Liaince to management team (Purchasing, Procurement, Engineering, Cost control. Doc control, QC, Safety , Construction department and etc) . Collection & compilation of all weekly and monthly status report with other departments for progress report attachment.
· Prepares weekly and monthly progress reports.
· Reviews and prepare analysis report such as critical path analysis, activity delays analysis, Earned value analysis (EVM / EVMS).
· Alerts Project team on critical issues affecting the construction schedule.
· Prepare trends and forecast analysis as required.
· Prepare EOT delayed impact analysis as required.
· Internal safe keeping of In & Out-Going documents.
· Undertakes or assists in special tasks and assignments as needed.
· Attend weekly & monthly internal & external coordination meeting as required.
2. Sr. Planning/Scheduling Engineer / 12 Dec. 2011– July 2014
AECOM Saudi Arabia Ltd.
Ma’aden 794 Villas (EPC) Project (12 Jan. 2013 – July 2014)
Using Primavera Project Management Software (P6 V. 8.2) ,MS Project and Microsoft Office Software in the development and control of Over-all Project Management Services for Construction of 794 Villa + 16 residential Buildings. Performed Planning, Scheduling & Project Controls in order to complete project w/n time & budget.
Jeddah Storm Water Drainage Program 12 Dec. 2011 – 12 Dec. 2012
Using Primavera Project Management Software (P6 V. 8.2), MS Project and Microsoft Office Software in the development and control of Over-all Project Management Services for Construction of 8 Dams and Storm Water Channels Including Roads and 13 Bridges. Performed Planning, Scheduling & Project w/n time & budget.
3. Sr. Planning Engineer / 2 8 June 2009– 06 Dec. 2010
DynCorp International Free Zone (Afghanistan)
Military Camp (Ana Gamberri Garizon
Using Primavera Project Management Software (P6) and Microsoft Office Software in the development and control of Over -all Project Management Services for the construction of 150 Buildings (Structural, Architectural & MEP’s), perimeter roads, U/G services and Land Development Work. Lead Project Management Team to performed Planning & Scheduling works as detailed. Performed Planning Scheduling & Project Controls in order to complete project w/n time & budget.
4. Senior Planning Engineer / 06 March 2008 to May 19 2009
Al Habtoor Engineering L.L.C. / Leighton Group (Dubai, U.A.E.)
Jumeirah Beach Resident Towers Project
Using Primavera Project Management Software (P6) and Microsoft Office Software in development and control of Over-all Project Management Services for the construction of Building Towers (Structural, Architectural & MEP), perimeter roads, U/G serviced and Land Development Work. Lead Project Management Team to performed Planning & Scheduling works. Performed Planning, Scheduling & Project Controls in order to complete project w/n time & budget.
5. Senior Planning Engineer / 10 November 2006 – 29 February 2008
Oger Dubai L.L.C. (Dubai, U.A.E.) 10 November 2006 – 29 February 2008
Main Contractor for Building Towers
Control of over-all Project Management Services for the construction of Building Towers (Structural,Architectural & MEP), perimeter roads, U/G serviced and Land Development Work. Lead Project Management Team to performed Planning & Scheduling works. Performed Planning, Scheduling & Project Controls in order to complete project w/n time & budget.
6. Senior Planning Engineer / 23 May 2006 to 09 November 2006
JC Maclean International FZCO (Dubai, U.A.E.)
Interior Finishing & Furnishing Works for Building Towers & Etc.
Using Primavera Project Management Software (P5) and Microsoft Office Software in development and control of Over-all Project Management Services for the construction of Interior Finishing works for Building Towers. Performed Planning, Scheduling & Project Controls in order to complete project w/n time & budget.
7. Senior Planning Engineer / 03 September 2003 – 30 January 2006
Al Mashrik Co. – Main Contractor (Riyadh, Saudi Arabia)
Construction of Buildings and its infrastructure (Hospital, School and STP).
Using Primavera Project Management Software (P3) and Microsoft Office Software in development and control of Over-all Project Management Services for the construction of Hospital, School and STP (buildings, perimeter road and its U/G services). Performed Planning, Scheduling & Project Controls in order to complete project w/n time & budget.
8. Senior Planning Engineer / 19 April 2002 – 11 May 2003
M.S. Al Suwaidi Industrial Services (Jubail, Saudi Arabia)
Construction and Shutdown Project (Petro Kemya & Kemya)
Using Primavera Software (P3) and Microsoft Office Software in Development and control of over-all Project Management Services for Turnaround Works.Performed Planning,Scheduling & Project Controls in order to complete project w/n time & budget.
9. Project Manager / 15 June 1998 – 12 April 2002
Alliance International Properties Inc. (Philippines)
Taal Silangan Retirement Village Project (Philippines)
Using Primavera (P3) and Microsoft Office Software in the development and control of Over-All Project Management Services for the construction (Structural Architectural & MEP’s) of 29 R.C. Cluster Houses, Ambulatory Care Center Building, Club-House and including its Land Development, perimeter road and U/G services. Lead Project Management Team to performed Project Management Services.
· Review and comment discrepancies between designer’s preliminary drawing plans, bore test result, structural design analysis, site survey and Geo- Resistively test result for the revision of drawings ready for construction.
· Lead the management team in the development of construction budget and work schedule, resources histogram and S-Curve.
· Observe quality of work and update schedule as construction proceeds.
· Participate in regular contractor schedule and coordination meeting.
· Prepare weekly and monthly construction progress report.
· Comment on physical accomplishments being claimed by subcontractor in their progress billing.
· Guide the contractor in interpreting drawing and other document.
· Facilitate the resolution of conflicts on the technical matters with the subcontractor and design group.
· Document and keep all construction progress report, change order, plans, as-built information and other contract document.
· File all materials test result, submittals, shop drawing, instruction manual, inspection report, field log book, minutes of meeting and correspondences.
· Monitor status of submittals data, delivery of materials and equipments. Monitor the implementation of approved change order.
· Assist the contractor in solving construction problem caused by unforeseen contingencies and exigencies.
· Witness testing of construction material and finished work.
· Implement site quality control plan.
· Recommend to client the conduct of value engineering where applicable.
· Advise client the effect of suitable change / variation order.
· Examine areas where construction cost can be improved.
· Implement health and safety plan.
· Act as conduit to pass constructive suggestion and other document emanating from the sub-contractor to home office vice versa.
10. QA/QC (Civil Engineer) / 10 September 1996 – 17 February 1998
Sumatec Corporation Sdn Bhd (Malaysia)
Natural Gas Processing Plant (Horizontal & Vertical Construction Projects)
Construction of Bldgs (Struc,Arch. & MEP’s), Earthworks, its perimeter road and U/G Services. Developed and implementation of Quality Assurance Procedures and carry out Quality Control activities on site (such as document control, purchasing, handling and storage of material/ equipment, handling of Inspection, Testing and Nonconformance work.
11. Position : Site Engineer / 04 February 1995 – 02 April 1996
Company : Guam Construction Co., Inc. (Guam)
Project : Guam International Airport (Buildings, Taxi ways and Runway).
Responsibility : Construction of Terminal Building Taxiways and Runway.
12. Position : Reinforcing Metal Worker (Foreman) / 02 April 1993 – 25 February 1994
Company : Fletcher Pacific Construction Co., Ltd. (Guam)
Project : Duty Free Shopper’s Galleria Project (Tumon bay, Guam)
Responsibility : Construction of RC buildings (structural)
13. Position : Civil Engineer / 02 May 1989– 01 April 1993
Company : DM Consunji Inc. (Phil.)
Project : SM City Commercial Building Projects (Metro Manila)
Responsibility : Construction of buildings (Structural, Arch., MEP’s), perimeter road & U/G services.Planned, Controlled and
Supervision of the Daily Construction Operation on site particularly on Manpower, Materials and Equipments in order to complete project within Time, Budget and acceptable work Quality.
EDUCATION :
B.S. Civil Engineering, New Era University, Quezon City, Philippines, 1989
TRAINING/SEMINAR :
· Project Management in P6 Client Server : CMCS (Dubai, UAE) 2008
· Primavera Project Planner’s : Micro Cadd Technologies, 1995
· STAAD III : Micro Cadd Technologies, 1998
· Auto CADD for Professional : Crescent Technologies Institute, 1994
· Construction Safety Mgmt. : Fletcher Pacific Const. Co. Ltd., 1993
· Basic Japanese Language and Culture Toyama – Japan training & Development Center, Inc. 1991
LICENSED:
· Registered Civil Engineer
· Philippine, U.A.E , KSA. & Phil. Driving Licenses
PERSONAL DATA:
Age : 57 years old Civil Status : Married
Date of Birth : May 18, 1961 Citizenship : Filipino
Sex : Male Built : Medium
Height : 5’9” Weight : 170 lbs.