Photo

Rogel Lopez TIG/ARC Welder/Fabricator/Mechanical Technician

Qatar
MechanicalPiping/Structural FabricationWelding

RESUME

OF

ROGEL VALENZUELA LOPEZ

F. Sebastian Rd.San Antonio, San Pascual

Batangas, 4204 Philippines

Mobile #   09279587316 / +974 33708726

Email add. [email protected]

 

POSITION DESIRED :  Mechanical Technician / Welder TIG/ARC

 

OBJECTIVES :   To obtain employment as a Welder where I may be able to use my welding knowledge in order to work extensively on the company’s development projects. To perform Safety at all times, Quality, Productivity, Health and Integrity.

 

SUMMARY OF EXPERIENCED :  Almost 7 years experienced as a Mechanical Technician  and 12 years as a TIG/ARC Welder in Oil and Gas

Refineries, Offshore,  Petrochemical and Power Plant Constructions for Piping Fabrication, Field

Installation, Erection of Pipe spool including maintenance for piping systems, structurals, pressure vessels, boiler welding of omega tubes for Superheater Boiler assembly.

full welding for pipe line Tie-in, Hot Tapping and more welding tasks using

Gas Tungsten Arc Welding (GTAW) Shielded Metal Arc Welding ( SMAW ).

Specific to specialized ASME IX code. Performed welding of all

Welding position likes 1G to 6G by uphill welding progression. Responsible

To know the Filler Metal Specification,  AWS classification, Base

Material to be weld, Welding Procedure Specification (WPS), Welding

Process and preparing welding materials and equipments. Have knowledge

of non-destructive test including Visual examination test,

Radiographic test, Liquid Penetrant test, Electro magnetic test and Leak test. Know several likely causes of weld defects likes porosity, slag inclusions, inadequate joint penetrations, incomplete fusion, cracks, overlap and undercuts. Certified and

Qualified welding for Piping and Structural of carbon steel, stainless steel, Chrome with the filler rods such likes, 308L,316L,309L,347 and TGX for stainless steel.

. Work directly to welding Foreman, Supervisor and QA/QC

Know the 3 main specific tasks likes: Before welding, During welding and After welding.

Know and understand all Jobs Safely Analysis and Total Safety Task

Instructions before and after the job.

 

PERSONAL DATA:

 

Place of Birth                                                  :           San Pascual, Batangas

Age                                                                 :           45

Civil Status                                                     :           Married

Height                                                             :           5’4”

Weight                                                            :          70 Kg

Sex                                                                  :          Male

Religion                                                          :          Seventh Day Adventist

Name of Wife                                                 :          WennaTolentino Lopez

Name of Children                                           :           Shaemel T. Lopez

Name of Mother                                             :           Arceli V. Lopez

Name of Father                                               :           Epitacio L.Lopez

Dialects can speak or write                            :           English, Filipino

 

 

EDUCATIONAL BACKGROUND:

 

 

Primary                       :           Bauan Adventist Rural School ( S.Y. 1985-1986)

 

Secondary                   :           San Pascual Barangay High School ( S.Y. 1989-1990)

 

Vocational                  :           TESDA- Technical Education Skills Development

Authority  –  Electric Arc Welder

 

CERTIFICATIONS :

 

Liquid Penetrant Testing  :   International Inspection Services Ltd. Doha Qatar

HUET / SEA SURVIVAL / H2S  :   Enertech Training Center Inc. Doha Qatar

Shielded Arc Welding NCII    :  TESDA – Technical Education Skills Development Authority

Electric Arc Welding        :    TESDA – Technical Education Skills and Development Authority

GTAW/SMAW Welding   :    Phil-Asia Training Center

GTAW/SMAW Welding   :    IMI – Industrial Maintenance International Training Center Inc.

Basics Safety Training      :     IMI – Industrial Maintenance International Training Center Inc.

Basics Safety Training      :     Granite Services International Inc.

Basics Safety Training      :     Maritime Training Center of The Philippines

 

 

TRAININGS & SEMINARS ATTENDED:

 

HUET / SEA SURVIVAL / H2S                 :      Enertech Training Center Inc. Doha Qatar

March 26, 2016

Basics Job Safety                                :     General Electric (GE) EHS Core Trainings

www.gsinc.com Granite International Services Inc.

Pasong Tamo Ext. Makati, Philippines

February 18 – 20,  2009

 

Basics Job Safety  www.hacsc.com        :    Associations of Reciprocal Safety Councils Inc.

Reciprocal Courses                                         Houston, Texas, USA     (February  8 – 9  2008)

 

Basics Job Safety                                :         Industrial Maintenance Int’l.Training Center Inc.

English Course                                              1272 Eagle Bldg. Estrada St. Malate, Manila

Philippines         (October  07 -18  2007)

 

Basics Job Safety,H2S,                       :           Philippines Shell Petroleum Corporation

Confined Space Entry                                     Shell Refinery, Tabangao, Batangas City,

Line Breaking, Fall Protection,                      Philippines (March 2002, March 2003, March

Fire Protection and more                                2004, March 2005, March 2006, March 2007)

 

Basic Safety Training of                     :           Maritime Training Center of the Philippines

Personal Safety Social Responsibility           3rd Floor G. E. Antonio Bldg. T. M. Kalaw St.

Fire Prevention &  Fire Fighting                    Ermita, Manila, Philippines

Elementary First Aid                                      June 21- 30 2004

 

 

EMPLOYMENTS  RECORDS :

 

# 1.

 

Company        : Fieldcore Service Solutions (formerly Granite Services Intl. Inc.)

( A wholly owned affiliate of General Electric Energy Services USA )

 

Address           : GE Qatar Branch Office

Oil & Gas Middle East / Africa / Turkey Resources

Najma Road Intersection C-Ring Road, PO Box 32348 Doha Qatar

Projects :

 

1.              Qatar Petroleum PS2  /  PS3 Platform Offshore

Combustion Inspection / Hot Gas Path Inspection ( AEG Gas Turbine )

 

April 3   –    April 31, 2016

 

2.            OLNG – Oman Liquified Natural Gas Refinery Plant, Sur Sultanate of Oman

Major Inspection of GTG 6 GE Gas Turbine

August 11,     –    September 1, 2016

 

3.           Sembcorp Power Plant, Salalah Sultanate of Oman

Combustion Inspection 6FA GE Gas Turbine

October 3,    –    October 10, 2016

 

4.           OLNG – Oman Liquified Natural Gas Refinery Plant, Sur Sultanate of Oman

Hot Gas Path Inspection 6E GE Gas Turbine

October 13,    –    October 30, 2016

 

5.           Qatar Petroleum Arab D Refining Station,  Dukhan State of Qatar

Liner & Transition Piece Inspection Frame 5 GE Gas Turbine

October 31,   –   November 2, 2016

 

6.           Mesaieed Power Plant, Mesaieed State of Qatar

Major Inspection of  GE Generators Steam & Gas Turbine Unit 11, 22, 32

November 3,    –   November 26, 2016

 

7.           Qatar Petroleum Stripping Station,  Dukhan State of Qatar

Combustion Inspection of Frame 3 John Brown Gas Turbine

November 28, 2016     –    December 6, 2016

 

8.          Qatar Vinyl Corp.  Mesaieed State of Qatar

Combustion Inspection FR6B GE Gas Turbine

December 7, 2016   –    December 11, 2016

 

9.          NGL3 Qatar Petroleum,  Mesaieed State of Qatar

Major Inspection of Compressor – John Crane

January 2, 2017  –  January 12, 2017

 

10.        Qatargas Operating Company Ltd. Ras Laffan State of Qatar

Major Inspection of GTG8 GE Gas Turbine

January 15, 2017  –  February 2, 2017

 

11.        Bahrain National Gas Co. –  Sakhir Bahrain

Major Inspection of FR3 Hitachi Gas Turbine

February 11, 2017  –  February 28, 2017

 

12.       Qatargas Operating Co. Ltd.  –  Ras laffan State of Qatar

Major Inspection of FR9E GE Gas Turbine MR Unit

March 1, 2017  –  March 23, 2017

 

13.      Qatar Petroleum PS2/PS3 Platform Offshore – State of Qatar

Combustion Inspection of FR5 AEG Gas Turbine

April 14, 2017  –   May 2, 2017

 

14.     West Burton Power Station, Retford, Nottinghamshire, United Kingdom

Hot Gas Path Inspection GE 9FB Gas Turbine

July 3, 2017   –   September 5, 2017

 

15.     Oman LNG, Sur Oman – Major Inspection of AN 200 Compressor

September 13, 2017   –  October 4, 2017

 

16.    Qatargas Operating Company Ltd. Ras Laffan State of Qatar

Hot Gas Path Inspection of Train 5 N2 Gas Turbine

October 11, 2017  –  October 26, 2017

 

17.   Sembcorp Power Plant,  Salalah Sultanate of Oman

Major Inspection of GE 6B Gas Turbine

November 8, 2017 –  December 19, 2017

 

18.   OLNG- Oman Liquified Natural Gas, Sur Sultanate of Oman

Major Inspection of GE 6B Gas Turbine

November 22, 2017   –  December 15, 2017

 

19.   Qatargas Operating Company Ltd. Ras Laffan State of Qatar

Major Inspection of GE 6B Gas Turbine GTG 9

December 19, 2017    – December 27, 2017

 

20.   Qatargas Operating Company Ltd. Ras Laffan State of Qatar

Major Inspection of GE 6B Gas Turbine GTG 1

January 15, 2018  –  February 7, 2018

 

21.   Qatar Petroleum PS2 Offshore Platform – State of Qatar

Major Inspection of AEG Frame 5 Gas Turbine

February 14, 2018  –  March 12, 2018

 

22.   OLNG – Oman Liquified Natural Gas, Sur Sultanate of Oman

Hot Gas Path Inspection of GE 6B Gas Turbine Train 1

March 30, 2018    –   April 19, 2018

 

23.   Shell GTL Pearl, Ras Laffan Industrial City – State of Qatar

Major Inspection of 6B GE Gas Turbine

April 26, 2018   –   May 23, 2018

 

Position:    TIG/ARC Welder / Mechanical Technician

 

 

 

Duties and Tasks :

·        Overhauling of gas / steam / turbines and generators for major and minor inspections for shutdown tasks.

·        Removal of turbine casings, pipings, combustion can, liner, transition piece, fuel nozzles, etc.

·        Overhauling of Rotor and lifting through the inspection and rotor blade removal and replacement.

·        Welding for modification of piping and other structural piping support, cutting and gauging with oxyacetylene hotworks.

·        Analyzes plans, drawings, work samples, specifications, and work orders to determine work requirements and sequence of welding assignments. Follow  welding procedure specifications WPS.

·        Estimates material and labor. Recommends supplies and materials to be ordered.

·        May operate various power impact  equipment.

Knowledge, Skills and Abilities:

·        Knowledge of applicable codes, WPS.
·        Knowledge of welding techniques, (oxygen-acetylene, electric arc, and TIG, SMAW ), tools and equipment.
.

Character References :

 

Mr. Rellie Boy Magnaye  –  Field Mechanical Supervisor

Fieldcore Service Solutions – Qatar  Branch Office

Phone no. +974 33603895

Email :  [email protected]

 

 

 

# 2.

 

Company            :          Atlantic, Gulf & Pacific Company of Manila Inc.  www.agp.ph

YAMGAZ SNC Joint Venture of JGC Corp. and Technip ( Client )

 

Address              :            Fabrication Yard, San Roque, Bauan, Batangas Philippines

 

Inclusive Dates  :            February 23, 2015     –    December 18, 2016

 

Projects              :             Yamal LNG Modular Construction ( Ship to Sabetta, Russia )

 

Positions            :             Pipe Welder (GTAW/SMAW)

 

 

 

 

 

Duties and Tasks :

 

●      Accepts working instructions from Foreman and Supervisors regarding

details task   instructions

 

●       Ensures that the equipment and other materials needed will always be in good condition.

 

●        Prepares the equipment and other materials needed for each job.

 

●         Reports to welding Foreman all problems encountered.

 

●         Familiarizes with the WPS to be use in particular structure.

 

●         Cleans all weldment after welding such as spatters and slug.

 

●         Maintains the correct current, voltage and travel speed at all times.

 

●         Returns all welding consumables stub, welding electrode butts

grinding/cutting discs and worn out gloves to welding consumables

controller prior to withdrawal of new  items.

 

●         Proper usage of all welding and accountable for damages lost due to negligence.

 

●         Ensures that heated quivers shall be plugged in at all times during production usage.

 

●         Ensures compliance with housekeeping.

 

 

# 3.

 

 

Company            :          Atlantic, Gulf & Pacific Company of Manila Inc.  www.agp.ph

Bechtel Engineering, & Construction Management   www.bechtel.com

 

Address              :            Fabrication Yard, San Roque, Bauan, Batangas Philippines

 

Inclusive Dates  :            May 17, 2013     –    August 4, 2014

 

Projects              :             GLNG (Gladstone Liquified Natural Gas), Bechtel International

Modular Projects Australia

 

Positions            :             Pipe Welder (GTAW/SMAW)

 

 

Duties and Tasks :

 

●         A certified and Qualified for GTAW/SMAW Welding process in all position

to ASME Section 9 code.Usually weld in a high pressure welding to 100% x-ray quality.

 

●          Follow welding procedure as written in welding procedure specification ( WPS ). Have

ability to undrerstand results of non-destructive test including RT, Penetrant Test,

Visual Test and more. Know all Weld Repair Procedures.

 

●          To know several likely causes of weld defects or discontinuity likes porosity, inclusions,

Inadequate joint penetration, incomplete fusion, overlap, undercut, cracks and other weld

defects using the GTAW/SMAW welding process.

 

●          Range qualified for the metal components such as carbon steel, stainless steel,

with the filler rods such likes, ER70SG-2, E7018 for carbon steel, ER316L, ER309L,

for stainless steel thru welding of GTAW/SMAW welding process.

Performed 0% welding rejection for Piping of 100% radiographic test.

●          To know the Total Safety Tasks Instructions and job  Safety Analysis before

and after the job.

●          Passed all the welding tests and Safety Training through AG&P and Bechtel Facilities.

 

 

 

Characters References :

 

Ms Monica Bejasa

Human Resource Personnel

AG&P   Fabrication Yard, San Roque, Bauan, Batangas,,Philippines

Phone no.  +63 9989665107

 

 

Mr. Melvin Bicol

Piping Supervisor

AG&P Fabrication Yard, San Roque, Bauan Batangas Philippines

Mobile #   +63 9102168121

Current Employment Location Mobile #   +20 1099985124  (Egypt)

 

# 4.

 

 

Company        : Granite International Services Inc.    www.gsinc.com

( A wholly owned affiliate of General Electric Energy Services USA )

 

Address           : Granite Philippine Branch Office

2289 UPRC 111 Bldg. Pasong Tamo Ext. Makati, Philippines 1231

 

Inclusive Dates  :  March 9, 2009     –       December 20, 2012

 

Projects  :

 

1.Major Inspection of Frame 9FA x 2 Units GE Gas Turbine 1& 2 (Shutdown)

ENKA Izmir Power Plant – Alliaga, Izmir, Turkey

March 9, 2009 – April 6, 2009

2.   Hot Gas Path Inspection of Frame 6B GE Gas Turbine ( Unit 2 ) (Shutdown)

QVC-  Qatar Vinyl Company – Mesaieed, Qatar

April 27, 2009 – May 11, 2009

3. GE Gas Turbine Frame 5 Twin Shaft Inspection & Adjustment (Shutdown)

GASCO – Abu Dhabi OGD 3 Projects – Abu Dhabi, UAE

June 05, 2009 – July 19, 2009

4.  Hot Gas Path Inspection of Frame 6B GE Gas Turbine ( Unit 3 ) (Shutdown)

QVC- Qatar Vinyl Company – Mesaieed,Qatar

October 11, 2009   –   October 26, 2009

5.     Magic SR # 4 Inspection of Generator Unit 91,92, & 93 (Shutdown)

Qatar Electricity & Water Company – Ras Abu Fontas, Qatar

November 17,2009 – December 26,2009

6.     Major Overhaul Inspection of  Frame 9E Gas Turbine Train 4 C3 (Shutdown

RasLaffan Power Corp. – RasLaffan ,Qatar

March 05 , 2010 –  April 29 , 2010

Qatargas Operating Co. Ltd.  –   RasLaffan, Qatar

May 04,2010   –   June 11,2010

7.     Major Inspection & CDC Replacement  Frame 9FA Gas Turbine (Shutdown)

SembcorpCogen GT 11, Sakra Avenue,Jurong Island,Singapore

November 10, 2010   –   December 25, 2010

8.     Major Inspection Frame 9E Gas Turbine 3  (Shutdown)

Sembcorp Fujairah Power Plant, Fujairah, UAE

January 7, 2011    –     March 5, 2011

9.     Replacement of Load Coupling of GE Gas Turbine, Train 1 (Shutdown)

Oman LNG Plant, Sur, Oman

July 19, 2011   –  July 30, 2011

10.  Combustion Inspection of GE Gas Turbine 7FA (Shutdown)

Qurayyah Power Plant, Qurayyah, Saudi Arabia

October 7, 2011  –  December 19, 2011

11.  Hot Gas Path Inspection GE Gas Turbine 7EA (Shutdown)

Hawiyah NGL Recovery Plant Saudi Aramco, Saudi Arabia

November 19, 2011     –     December 16, 2011

12.  Combustion Inspection of GE Gas Turbine 6X 9FA     (Shutdown)

Sabiyah Power Plant, State of Kuwait

February 28, 2012    –   April 6, 2012

13.  Combustion Inspection of GE NuovoPignone Gas Turbine 5 LP/MR Unit

Qatargas Operating Company Ltd.   State of Qatar

April 6, 2012    –    May 3, 2012

14.  O Ring Replacement of Nuovo Pignone Compressor MR Unit (Shutdown)

Qatargas Operating Company Ltd.  State of Qatar

September 17, 2012    –     October  15, 2012

15.  Major Inspection of  Gas Turbine 5LP Unit – 2012 Turnaround Shutdown

Gulf Petrochemical Industries Co.  Kingdom of Bahrain

November 5, 2012   –    November 24, 2012

 

 

Positions        :   Welder / Mechanical Technician

 

 

Duties &Tasks :

 

•      Follow the welding procedure as written in Welding  Procedure Specification and able

to weld high pressure welding to 100 % x-ray quality.

•      Having qualification as per affiliate / standard welding procedure and a certified for

GTAW / SMAW welding in all position to ASME section IX code.

•   Assigned being a Welder / Mechanical Technician along General Electric

Gas Turbine  Projects for assembly, re-assembly of gas turbine casing, inner casing,

variable nozzle Rotor, compressor and other parts of gas turbine.

•      Assigned for mechanical weld repairs and know the proper procedures including analysis,

assessment, excavation, re-welding of excavation and NDT confirmation of repairs.

•Assists for  disassemble / Assemble of  Turbine Casing including  Upper and internal

Casing , Rotor , Bucket , Shroud , Liner , Nozzles and other parts of Gas Turbine.

 

Performed welding of modification of piping including fuel line, air line and water line.

 

Performed Oxyacetylene cutting, heating, gauging and any welding methods that involves

Gas Turbine overhauling and assembly.

 

Responsible to all safety welding procedures and avoid property damaged.

 

 

CharactersReferences :

 

Ms. Mylene Cruz  Capoy

Service Coordinator – Abu Dhabi, UAE

Granite Services International Inc. – Abu Dhabi Branch Office

Email Address:   [email protected]

Telephone #    :  +971 43326960 ext. 1805

 

 

# 5.

 

Company                   :           Global Process Services (GPS)

5110  Railroad Ave. Deer Park, Houston, Texas, USA

 

Projects                      :           Omaha Power Plant Public District (Station 2)

Superheater  Boiler Assembly (Zachry Construction Corp.)

 

Address                      :           Nebraska City, Nebraska, USA

 

Inclusive Date            :           October 27,2007    to    May 20,2008  (H2B Visa )

 

Position                      :           Journeyman Combination Welder (GTAW/SMAW)

 

 

 

Duties & Tasks          :

 

 

●         Full welding of 1 ½  inches boiler omega tubes, 2”,4”,6” and 30” pipes for

a super heater assembly of Omaha Power Plant Project.

 

●         A certified and Qualified for TIG and SMAW Welding in all position to ASME

Section IX code. Weld a high Pressure Components to 100 % X-ray quality.

 

●          Assigned welding in Piping Fabrication shop, field Installation for Power Plant

using gas tungsten Arc Welding (GTAW) and Shieldmetal Arc welding

(SMAW) procedures, process and equipments.

 

●          Assist for fit-up crew for fitting and assembling of piping and structural     components.

 

●          Read layouts, blueprints, work orders and prepare products for welding,

grinding and torch cutting or oxyacetylene cutting.

 

●          Observes test on welded surfaces, such as Radiographic test and dimension

tolerance to evaluate weld quality and conformance to specifications.

Inspect grooves, angles or gap allowances using micrometer caliper

and precision measuring instruments.

 

●         Assists in Stress reliefs procedures for quality control. Requires testing pipe

systems for adherence to engineering specifications material quantities and take off.

 

●         Passed the welding test of ASME Section IX welding Procedure Specification.

 

●        Perform welding tasks for different kinds of metals likes carbon steel, stainless steel

and chrome.

 

●        Passed all the safety trainings and examination before start all the tasks to the jobsite.

 

 

 

CHARACTERS REFERENCES:

 

Mr. Drew Ashcraft(Logistic Coordinator)           Ms. Nida P. Sarmiento

Global Process Services                                          Administrator Manager

5110 Railroad Ave.Deer Park,                               Robinson Worldwide Placement Agency

Houston Texas, 77536 USA                                  2621 Eagle Bldg. Alejo Aquino St.

Singalong, Manila, Philippines

Telephone #(001)281-680-2120

Mobile #  (001) 281-853-4304                               Telephone #  +63 2 5222903

 

 

 

# 6.

 

 

Company       :           Production Services Network Phil. Corp.     www.psnworld.com

(Formerly Kellogg Brown &Root Phil. Inc.)

 

Address          :           Philippine Shell Petroleum Corporation

Shell Refinery, Tabangao, BatangasCity, 4200Philippines

 

Projects          :           Refinery General Maintenance, Shutdowns, and Projects

 

Duration        :           March 15,2002     to  October 20, 2007

 

Position          :           TIG / ARC Welder

 

 

 

Duties & Tasks:

 

 

●          Almost 5 years as a pipe welder maintenance inside Shell Petroleum Refinery also

assigned welding for Shutdown and Projects.

 

●         A certified and Qualified for GTAW/SMAW/GMAW Welding process in all position

to ASME Section 9 code.Usually weld in a high pressure welding to 100% x-ray quality.

 

●          Follow welding procedure as written in welding procedure specification ( WPS ). Have

ability to undrerstand results of non-destructive test including RT,Penetrant Test,

Visual Test and more. Know all Weld Repair Procedures.

 

●          To know several likely causes of weld defects or discontinuity likes porosity, inclusions,

Inadequate joint penetration, incomplete fusion, overlap, undercut, cracks and other weld

defects using the GTAW/SMAW/GMAW/FCAW welding process.

 

●          Range qualified for the metal components such as carbon steel, stainless steel,

chromewith the filler rods such likes, 308L, 316L, 309L, 347 and TGX for stainless steel

thru welding of GTAW/SMAW welding process.

 

●          Assigned in full welding of Boiler pipes using GTAW welding process,CanInterprete

Isometric drawings and welding blueprints and operate welding equipment and flame

cutting or oxyacetylene equipments.

 

●          Usually assigned welding for piping in Petroleum pipelines,steamline,

fire water line, fabrication, field installation including Tie-in and Hot Tapping

using GTAW/SMAW welding process.

 

●          Know the permitry procedure before start the job and to know all the possible Hazards

about all the tasks inside the Petroleum Refinery.

 

●          To know the Total Safety Tasks Instructions and job  Safety Analysis before

and after the job.

●          Passed all the welding tests and Safety Training inside Shell Refinery.

 

 

 

CHARACTER REFERENCE:

 

Mr.Rufino V. Faytaren Jr.   (Human Resource Manager)

Production Services Network Philippines Corp.

Philippine Shell Petroleum Corporation

Shell Refinery, Tabangao, BatangasCity, 4200 Philippines

 

Tel #  +63 43 723-4321 to 24 ext. 651       Mobile #  +63 91750433 15

 

 

 

 

 

 

 

I hereby certify that the above information is true and correct to the best of my knowledge and beliefs

 

______________________

Applicant’s

Experience

March 2009 to December 2012 / March 2016 - Present Welder / Mechanical Technician at Fieldcore Service Solutions Int'l. Inc ( Qatar )

Resigned December 2012 and Re-hired March 2016
Gas Turbine Maintenance for Oil and Gas / Power Generation Industry

May 2013 to December 2015 Welder TIG/ARC at Atlantic Gulf & Pacific Co. Inc. ( Batangas - Philippines )

Modular Projects for Piping and Structural / Fabrication and Field Erection.

October 2007 to May 2008 Journeyman Combination Welder at Global Process Services ( Texas - USA )

H2B Working Visa – Skilled Manpower services for constructions projects all over the states.

March 2012 to October 2007 Welder TIG/ARC at Production Services Network Inc. ( Shell Petroleum Refineries - Philippines )

Welder Maintenance at Shell Petroleum Refineries