Marcial M. Arellano
#168 Purok 6 Barangay Mapalad Arayat Pampanga Philippines 2012
Mobile: 00966547807517
SUMMARY
Ø Innovative Mechanical Engineer who improves development plan execution by consistently creating new formulations and new measurement techniques.
Ø Team oriented who works effectively with all levels of employees in cross-functional teams.
Ø Creative trained in the full cycle of product design from concept to production and assembly.
____________________________________________________________________________________
HIGHLIGHTS
· Hydraulic and pneumatic design • Root cause analysis
· Injection molding techniques • Technical plan execution
· Operational and analysis expert • Microsoft Visual Basic
· Written and verbal communication skills • Excellent communication techniques
____________________________________________________________________________________
Profile
Maintenance manager strives for excellence – Vast experience in repair and maintenance of equipment/machinery. Offering:
Over seven years in managing and directing entire maintenance activities of organization.
Determined to produce optimum efficiency; keeps up with policies and goals of organization.
Analyzes information, solves problems and works with minimum supervision
WORK EXPERIENCE
SIG Combibloc Obeikan Company Ltd. February 2009 till Date.
Technical support & Workshop Leader – Riyadh KSA
Key Functions:
Provided strong leadership and technical expertise to maintain existing procedures and continuously improvement.
Resolved maintenance problems.
Recommended measures to improve conditions and operations of machines and equipment.
Identified the most efficient and acceptable resolutions to complex engineering problem.
Specified system components or direct modification of products to ensure conformance with engineering design and performance specifications.
Rowad Plastic Factory February 2006 to February 2008
Line Maintenance – Riyadh KSA
Responsible for all Preventive maintenance.
Responsible for mold mounting and dismounting, mold repairing and online, offline mold trouble shooting.
Responsible for injection molding trouble shooting and repairing.
Recommended design modification to eliminate machine system malfunctions.
Plastic Enterprises Technology September 2002 to September 2005
Line maintenance – Sharjah UAE
Created standard methods, processes and procedures for reviewing, evaluating and inspecting mechanical projects.
Line trouble shooting for machine and assembly units.
Machine adjustments, aligning, dismounting and mounting.
National Plant for Healthy Water (HANA WATER) November 1997 to November 1999
Mold setter / Adjuster – Al-Qassim KSA
Actively suggested operational improvements to enhance quality, improve production times and reduce costs.
Adjusted machine feed and speed if machine malfunction.
Change equipment over the new product.
Zamil Plastic industry Ltd. August 1993 to January 1997
P.E.T. Injection Operator – Al-Khobar KSA
Inspected proper panels for proper part identifications.
Evaluated production processes and equipment to find opportunities for improvements
Operated manufacturing equipment to maximize products throughput and minimize downtime.
Suggested mold and machine repairs and improvements to increase production of high quality parts.
Department Management:
Mentored and guided maintenance and repair work performance.
Supervised maintenance management staff and conducted performance reviews of workers and technicians.
TRAINING Conducted :
MS Excel and Power Point September 2013
OKA Riyadh
TPM Program June 2013
Four Principles Riyadh KSA
Netstal EVOS Basic Course March 2013
Nafels Switzerland
Operation/Maintenance of MC4 controlled Injection molding machine May 2009
Krauss Maffei (Riyadh KSA)
G-Line PET operator course December 1997
Husky Dudelange Luxembourg
Other Contributions:
Safety measures: Used different techniques and guidelines to ensure a safe environment around plant and premises. Ensured all maintenance workers are following prescribed safety policies and guidelines.
Recommended different methods of improvement and expansion in current facility.
Education:
Rizal High School
Secondary School March 1988