Photo

Joselito Langbid Instrument Technician

Abu-Dhabi
Instrument Technician

Josielito E. Langbid

===========================================================================

Position Applied: Instrument Technician

Objective:

• To be able to work in company that provides opportunity and advancement, where my education and experience can be practical and utilized to the out most.
• To get a job to help my family and sustain our daily needs.

Personal Background:

Age : 45 years old
Birthdate : July 28, 1972
Birthplace : Malingao Tubod Lanao Del Norte
Sex : Male
Civil Status : Married
Citizenship : Filipino

Education:

Technical Course: Mechatronics Technologies Corp. SY: 2011-2012 UP Campus Diliman Quezon City

Tertiary: Philippines Marine Institute SY: 1999-2003 Escolta, Manila
Course: Bachelor of Science in Marine Transportation
Under Graduate
Secondary: Ozamis City National High School SY: 1987-1992
Ozamis, Occidental

Primary: Ozamis City Central School SY: 1985-1986

Working Experiences:
SHINBO COMPANY LTD.
Project: Ethane Cracker and PE/PP Plant
(TACE Project) in Balkan Region, Kianly
Turkmenistan from September 20, 2016 to
October 18, 2017
Instrument calibrator
• Handle the Pre-loop and final loop of transmitter and valves,
• Assisting the vendor to trouble shooting of transmitter such as.
• Level transmitter level transmitter flow transmitter temperature
Transmitter and sensor.
• Handle the pre-loop of the fire & gas.gas alarm fire alarm. Fire detector
& gas alarm detector.
• Perform the field calibration oh transmitter and valves and to trouble
Shooting the transmitter and valves.

During the loopchecking of the cv/sdv/bdv.first thing to do is the location
Of tag.nos.to be as per P&ID.
Perforomed the looptest check first the instrument air header.checking valve endex .
To start looptest or autocal.checking the manual change over the pace plate
Controllers to be check & control valve moving action in case of control valve.
Check from 0%/25%/50%/75%100% and reverse action from100%to0%
During mov loop checking.get clearance from the respective team leaders.
Ensure the mov smoothly operated open & close with hand wheel. To engage
The clucth.operate one turn & then release the lever.
To operate the mov put the local mode to operate the fully operate to 20%to30% using hand wheel to operate the mov.
Performed an doing the looptest checking for the transmitters fir flow transmitter of dp type.transmitter range 0 0 to100m3/hr if the transmitter
Index an data sheet ranges are not matching in the dcs pace plate
Record to dpr.
For the esd transmitter alarm values ll or hh either the short circuit to be checked by simulating from the field.
EEI CORPORATION
Project: San Gabriel Power Plant
Sta. Rita Batangas October 1 2015 to June 30 2016

Instrument Technician
• Handle the Pre-loop and final loop of transmitter and valves,
• Assisting the vendor to trouble shooting of transmitter such as.
• Level transmitter level transmitter flow transmitter temperature
Transmitter and sensor.
• Perform the field calibration oh transmitter and valves and to trouble
Shooting the transmitter and valves.
• Pulling of primary and secondary based on instrument location drawing
And the engineering length.
• Installation of conduit pipe based on the secondary instrument location drawing.
Hyundai heavy industries
• Project: Al azor power plant kuwait

January 29, 2014-SEPTEMBER 15, 2015

Instrument technician
• Monitors and verifies operation of all BMS field devices.
• Inspects maintains and repairs HVAC ,power generation ,low voltage electrical
Switchgear and UPS system.
• Records maintenance and data generaye freport as needed.
• Evaluates all maintenance request form ,request priorities and process work
Assignment.
• Troubleshoot BMS system fault and develops repair solution.
• Adjust BMS system setting sand parameters to meet changing condition.
• Provides a safe and secure workplace.
• Performs other duties and assigned.

Hyundai engineering construction
Project: Power Plant
LIBYA SIRTE
July 23, 2013- July 20 2014

Instrument foreman
• To perform the pre-loop and final loop testing different types of transmitter such as pressure
• Transmitter and switches ,level transmitter and switches, flow transmitter and switches
Temperature transmitter and sensor,
• To perform field calibration of different kind of transmitter and control valve
Termination cable both primary and secondary.
• Cable pulling from control Room to junction box.as follows the Eng. Length.
Performed the looptest of the bp type transmitter.first thing to is to check. The range 0 to 100m3/hr for dp range 0 to 500mbar 0% (0mbar)=0m3/hr:25% (125mbar)=50m3/hr(250mbar)=70.7m3/hr:75% (375mbar)=86.6mbar:100% (500mbar)=100m3/hr.
For dcs transmitter normal checking. Alarm values& its recovery to check by simulating from field instrument.
It well be check index & data sheet ranges are not matching well be record to dpr.
For all alarm values simulation check for alarm in current alarm or (cam)when an alarm comes it has to blink in graphics in red.if we accept it will become static.
SK ENG.
Project: Ruwais Refinery Expansion
Abu Dhabi
February 9, 2012- April 18, 2013

• Instrument Technician
• Perform pre-loop and final loop testing of different types of transmitter such as pressure
Transmitters and switches, level transmitters and switches, flow transmitter and switches, Temperature transmitter and sensor.
• Perform field calibration of different of transmitter and control valves.
• Perform trouble shooting of signal using of different types of test equipment like hart 475 decade resistance box drack and multi-tester
• .Measuring main cable from satellite instrument shelter to main pipe rack J/B. base on the sk.engenering length and compare the actual measure.
• Termination of primary cable from satellite instrument shelter to J/B box both analog cables and fieldbus cables base on the termination details drawing.
• Calibrate of transmitter both analog and fieldbus fire and gas transmitter. Base on the calibration procedure and bench calibration.
• Installation of transmitter base on P& ID and location and drawing and 3 D drawing.
• Line checking of the secondary and primary from the transmitter to satellite instrument shelter.
• Line checking meggering internal cables/pre-loop checking the internal cables inside the satellite instrument shelter.

SK ENG.
Project: Bab Gas Adco Company
Abu Dhabi
October 21, 2010-January 5, 2012

Instrument Fitter
• Perform pre-loop and final loop different types of transmitter such as ,pressure transmitter And switches, level transmitter flow transmitter and switches, temperature transmitter and sensors.
• Assisting the vendor to trouble shooting of some of transmitter are the display is different Reading.
• Measuring and preparing of cable pulling from satellite instrument shelter to main pipe rack junction box base on the engineering length and compare the actual measure.
• Termination of primary cable from satellite instrument shelter room to J/B box base, on termination details drawing.
• Calibrate of transmitter using calibration procedure both Analog and field bus transmitter and fire and gas transmitter using hart communicator.

HYUNDAI HEAVY INDUSTRIES
Project: GTL- Gas to Liquid
Qatar
April 29, 2009- April 29, 2010

Instrument Fitter
• Installation of stanchion base on the instrument location drawing P and ID and 3D drawing for facing of the transmitter.
• Installation of bundle tube tray for bundle tube from analyzer house to sample proof panel base on the bundle tube details drawing and sample proof drawing.
• Installation sample proof panel base on the sample proof installation drawing and details drawing.
• Pulling of bundle tube using the length of Eng. length from sample proof panel to analyzer house.
• Connection of bundle tube from sample proof panel to analyzer house using connection kit and details drawing.
• Installation of tubing from tapping of cylinder to inside of analyzer house using P and ID and pipe number sample.

SK ENG.
Project: Kuwait Oil Company GC-19
Kuwait
December 16, 2007- December 28,2008

Instrument Fitter
• Installation of cable tray using cable tray details cable pulling primary using main cable.
• Layout from control room to J/B box.
• Termination of primary cable using termination schedule details J/B box and panel termination.
• Installation of cable tray inside of control room base on main cable tray layout.
• Installation of label switch and alignment of label switch base on hook-up drawing.
• Installation of tubing base on hook-up drawing from tapping point to transmitter,
• Line checking and meggering the primary cable from J/B box to control room panel
Promo Edge Electrical Maintenance
ISETAN STA. Cruz Manila
DECEMBER-7, 2001-DECEMBER-10, 2007

Electrical Maintenance
• Lighting Generator Elevator Freezer.

Character References:

Evangeline Docor
Administrative Aide V
Mobile

I hereby certify that the information and data written above are true and correct.

____________________
Josielito E. Langbid
Applicant

Experience

September 20, 2016 to October 18, 2017 Project: Ethane Cracker and PE/PP Plant at SHINBO COMPANY LTD.

Instrument calibrator
• Handle the Pre-loop and final loop of transmitter and valves,
• Assisting the vendor to trouble shooting of transmitter such as.
• Level transmitter level transmitter flow transmitter temperature
Transmitter and sensor.
• Handle the pre-loop of the fire & gas.gas alarm fire alarm. Fire detector
& gas alarm detector.
• Perform the field calibration oh transmitter and valves and to trouble
Shooting the transmitter and valves.

During the loopchecking of the cv/sdv/bdv.first thing to do is the location
Of tag.nos.to be as per P&ID.
Perforomed the looptest check first the instrument air header.checking valve endex .
To start looptest or autocal.checking the manual change over the pace plate
Controllers to be check & control valve moving action in case of control valve.
Check from 0%/25%/50%/75%100% and reverse action from100%to0%
During mov loop checking.get clearance from the respective team leaders.
Ensure the mov smoothly operated open & close with hand wheel. To engage
The clucth.operate one turn & then release the lever.
To operate the mov put the local mode to operate the fully operate to 20%to30% using hand wheel to operate the mov.
Performed an doing the looptest checking for the transmitters fir flow transmitter of dp type.transmitter range 0 0 to100m3/hr if the transmitter
Index an data sheet ranges are not matching in the dcs pace plate
Record to dpr.
For the esd transmitter alarm values ll or hh either the short circuit to be checked by simulating from the field.