http://ASIF RAZZAQ Civil Project Engineer E-mail: [email protected] Mob: 00923366666458 Job ObjectiveAssignments in Inspection, Quality Control & Assurance (Civil and Structural Construction) cost evalute with a high growth oriented organization in Power,tank Constructions,pipeline, Commercial and residential building, staff accommodations, labor camps, Road Bridge and underground utilities.Brief OverviewA Civil Engineering with 16 years experience in project coordination with client local departments engineering issues, Inspection, Quantity survey, Construction and QA/QC in the field of construction in civil and structural works for water treatment Tank foundation, Main oil pump foundations, booster pump foundations, oil drain vessel pits and all types of pits and pipe supports, control, administration and substation buildings Residential and commercial Buildings, labor camps. Staff accommodations, Road, Bridge, Infrastructure, utilities,Responsibilities Responsible for all type of reinforcement structure, concrete, fire training ground complete construction from design review to construction and handover to client, Buffer tank foundations, Main oil pump and booster pump foundations, control, administration,substation buildings and residential complex tiles sanitary works, blocks works, water treatments. Establishment of irrigation line with suitable placement of manhole. Electrical & mechanical work with generator room according to safety hazards. Inspection of sheet pilling, dewatering, reinforcement structure & trimming concrete, Reviewing and approving shop drawings, Coordinating the site staff, Site inspection according to requirements, Reviewing and signing of submittals Preparing site instruction and NCRs Reviewing of site staff daily report quality control HSE control Effective participation in meeting and coordinating with contractor and client Preparation of data and worked on co-ordinate by referring drawings. Establishment of control points transferring and elevation drawings. Preparing data for curves and setting out date at site. Placing and positioning Inlet, Flush Inlet, and CCTV Chambers. Executing new proposed irrigation ducts, electrical ducts, telephone ducts by referring drawings. Taking section for excavation at different interest and recording on log books. Electrical light poles, signal posts. Quay wall 16kilometers, Crescent & end of Trunk Co-ordination with client for the day to day works. To execute the work in accordance with the project specifications. Monitor and follow up the progress to meet the project schedule. To prepare the inspection Reports and obtain the certification from client.Page 1 of 4 To implement safety & Quality as per the company/project Requirements. To prepare the as built documentation.Career Highlights2013 to Jan 2018 ILF Consulting Engineering Abu Dhabi: Inspection of construction activities & Preparation of all QC related documents, coordination with clientsFor Inspections & Approvals, project coordination with local departments regarding engineering issues, Inspection of Subcontractor works etc., for the following projects in 48” pipeline laying , pipeline repairs, prepare of pipe burm,pipe lines ROW, tank foundation, building, Road and Utilities below:ADNOC approved JO for PTW for site activities Project Title: Abu Dhabi crude oil pipeline project Habshan to Fujairah Owner: international petroleum Investment Company Position held in the project: Civil Engineer /Project EngineerResponsible for Inspection and getting approvals for the execution and construction of site offices, related all type of works civil work, Tank foundation, Main oil pump foundations, booster pump foundations, oil drain vessel pits and all types of pits and pipe supports, control,adminisration and substation buildings Road, Bridge, Storm water, Sewerage, Earth work, Dewatering, Precast concrete, Manhole, Asphalt road construction, Walkway slab, Laying of Interlock tiles, Car parking shelter, Cable line excavation and back filling compaction,Pipeline excavation, compaction, Beam, Pipeline marker installation and Fencing work in Fujairah MOT.Since 2009 to 2012 date with China Petroleum Engineering & construction: Inspection of construction activities & Preparation of all QC related documents, coordination with clientsFor Inspections & Approvals, Inspection of Subcontractor works etc., for the following projects in tank foundation, building, Road and Utilities below: Project Title: Abu Dhabi crude oil pipe line project habshan to Fujairah Owner: international petroleum Investment Company Position held in the project: Civil Engineer /Project EngineerDuration: May 2009 to August2012Responsible for Inspection and getting approvals for the execution and construction of site offices, site staff accommodation related all type of works civil work residential complex, Tank foundation, Main oil pump foundations, booster pump foundations, oil drain vessel pits and all types of pits and pipe supports, control,adminisration and substation buildings Road, Bridge, Storm water, Sewerage, Earth work, Dewatering, Precast concrete, Manhole, Asphalt road construction, Walkway slab, Laying of Interlock tiles, Car parking shelter, Cable line excavationand back filling compaction, Pipeline excavation, compaction, Beam, Pipeline marker Page 2 of 4 installation and Fencing work ,Habshan residential and swihean residential complex for ADCOetc.Since Dec’08 May 2009 date with Hyder Consulting Dubai Project Title: Crescent E Road and Infrastructure. Owner: NakheelPosition held in the project: Civil Engineer /Civil inspectorDuration: December 2008 to May 2009Responsible for Inspection and review shop drawing related all type of works civil, Road, Bridge, Storm water, Sewerage, Earth work, Dewatering, Precast concrete, Manhole, Asphalt road construction, Walkway slab, Laying of Interlock tiles, May’08 date to Dec 08 Nakheel Dubai Project Title: PALM JEBEL ALI Owner: NAKHEELPosition held in the project: Civil EngineerDuration: May 2008 to Dec 2008Responsible for site offices consultant staff accommodations, irrigation works around the site offices ,accommodations , tile work, blocks work up stand kerb work, site road preparation with suitable gravels & all type of electrical and mechanical work according to safety hazards, Inspection in Crescent E, Spine, trunk and Fronds, review the construction drawing, approval for consultant staff, reports to line manager about site condition, approval of material submittal,issue to consultant site instruction, brief to consultant and contractor about safety issues, arrange the meeting with contractor and consultant. August 2004 to May2008 Project Title: PALM JUMEIRAH Owner: NAKHEELConsultant: Associated consultant engineer.Position held in the project: Civil EngineerDuration: Aug 2004 to May 2008 Responsible for preparation of inspection reports and co-ordination with clients to get approvalfor the construction of Quay wall Foundation, Installation pre-cast, pump stations, commercial and residential buildings, Road, bridge, utilities all type of infrastructure and utilities workPage 3 of 4 March 2001 to Sep 2004 Inspection of construction activities & Preparation of all QC related documents, coordination with clientsfor Inspections & Approvals, Inspection of Subcontractor works etc., for the following projects in oil and gas industry as detailed below: Project Title: LAND ESCAPING Owner: ABU DHABI MUNCIPALITY Consultant: Al turath consulting.Position held in the project: Asst Engineer- Responsible for Inspection of rote survey, Preparation of inspection reports, Co-ordination withconsultant for the Construction of irrigation work, pump station building, Earth work, RCC road, Quantity of work, Fencing etc.Education Bachelor of Science in civil engineering (Peshawar) Diploma in HSE fire fighting from technical board Peshawar PTW course from ADCO approved institute Abudhabi (JO) IT Skills Auto CAD Diploma from National Technical Institute Islamabad Pakistan in 2003.Dec 04 – Feb 05 Executive Training Education from Galaxy Computer Education Abu Dhabi U.A.E MS OFFICE including Micro Soft Word Micro Soft Excel Micro Soft Access Micro Soft Power PointPersonal Details Permanent Address : House # 249 st 3 sector 1 airport housing society RWP Pakistan Tell: +92-336-5146752 Passport Number : AG 9868913Date of Birth : 17th November, 1976Languages : Arabic, English, Urdu, and PunjabiVisa status : Visit visaDriving License : Issued by Dubai authorities; valid until 2026Member : Society of Engineering UAE (33185)Page 4 of 4