Photo

Rafael Edrozo Piping Engineer

Philippines

RAFAEL MORAN EDROZO

Aplaya, Pila, Laguna Philippines
Telephone Number:
Home : +639776034457
Email : [email protected] / [email protected]

OBJECTIVE

• To become part of an Organization involved in EPC, Oil, Gas, Power, Petrochemical Industries and Manufacturing in the Field of Quality Assurance/Control, Documentation, Examination, Inspection and Testing. To participate in the successful completion of the Project through the application of Knowledge, Proficiencies, Skills and Experiences with a group of Professionals and Technical People in their respective, progressive and Internationally Recognized System that offers Opportunities for Continuing Professional Development (CPD).

SUMMARY OF QUALIFICATIONS

• 13 Years extensive experienced in all types of construction project as a QA/QC Piping / Welding Inspector, Piping Superintendent, Piping Engineer and Piping Supervisor in Petrochemical, Power, Utilities and Off Sites, Refinery & Oil and Gas.
• A Well experienced working in Engineering Procurement and Construction, conversant with Engineering Designs and Specifications.
• Familiar in Engineering designs, drawing and specifications for Piping
• Self motivated, hands on individual.
• Ability to coordinate and operate a Smart Plan 3D .

EDUCATION

AMA Computer College 1998 – 2002 College
Computer Engineering
Sta. Cruz Laguna

Linga National High School 1994 – 1998 Secondary
Linga Pila Laguna

Rizal Elementary School 1988 – 1994 Primary
Tayuman Tondo Manila

WORK HISTORY

I. Jebel Ali Power Station M-extension Project
Siemens LLC
Jebel Ali, Dubai, U.A.E.
Piping Engineer
Duration: October 1 2016 to August 4 2018
• Day to day monitoring of Piping progress, manpower, and equipment record.

• Responsible for supervising construction activities in piping Subcontractor trades personnel related to a discipline. Maintains the highest quality standards while administering good construction safety practices with all on-site activities.
• Ensure that all sub-contractors employees are adhering to the company Health, Safety, and Environmental excellence policy.
• Promote job site safety, encourages safe work practices and rectifies job site hazards immediately. Regularly participate in HSE meetings, toolbox talks, and daily jobsite walks.
• Direct all field personnel including those of construction subcontractors to achieve completion of the project on schedule, with quality workmanship that conforms to original plans and specifications.
• Ensure that each reporting supervisor is capable of performing their allotted scope of work.
• Contribute to construction schedule and 6-weeks look-ahead, understand the project plans and specifications, identify and solve problems, order materials and schedules inspections as necessary throughout the process.
• Maintain positive working relationship with customers, contractors, suppliers and other employees.
• Serve as a coach and mentor for subordinates and identify construction Supervisors with capacity to be promoted to Superintendent level.
• Implement standardized construction work processes, procedures, manuals and systems and create a system of control in each specific area.
• Lead, motivate, communicate with, develop, appraise and performance manage staff to ensure that staff are fully motivated to achieve best performance to meet the project and company’s needs.

II. Independent Water and Power Plant
Hyundai Engineering & Construction
Al Mirfa Abu Dhabi, U. A. E.
Piping Engineer
Duration: August 22, 2015 to September 28, 2016

• Planning the work and the efficiently organising the plant in order to meet the agreed deadlines;
• Day to day management to the site, including monitoring and supervising the site labour force and the work of subcontractors;
• Liaising with consultant subcontractors, planners and general workforce involve in the project.
• Prepared pipe isometrics, P & ID and piping plan with emphasis to process, economics, and safety of the piping system.
• Checked and review construction drawing to reflect actual site arrangement.
• Performed material take-off then monitored materials for procurement to ensure designed quantity and material specifications.
• In charge of utilities line, steam line from procurement stage, materials take off, fabrication, erection and installation, walk down, punch clearing, pressure test, re instatement up to first firing of Open Cycle and Combine Cycle.
• Work preparation and coordination in Desalination Plant, Gas Turbine Generator, HRSG, Steam Turbine Generator

III. PP12 Dhurma Combine Cycle
GS Engineering & Construction–BEMCO Joint Venture (Riyadh, Saudi Arabia)
Piping Engineer
Duration: February 15, 2014 to November 30,2014
• Prepared pipe isometrics, P & ID and piping plan with emphasis to process, economics, and safety of the piping system.
• Checked and review construction drawing to reflect actual site arrangement.
• Performed material take-off then monitored materials for procurement to ensure designed quantity and material specifications.
• Prepared engineering standard, and procedures for piping system and static equipment suitable to client and based on applicable..
• Mentored team members and monitored workflow and progress to ensure the standards and schedules were met.
• Prepare test packages and updating reports, documentation, schedules take-off timetable, presented said reports.
• Handled personnel and client queries regarding piping system.
• Participated in meetings and discussions with the clients and contractor regarding issues.
• Performed duties within guidelines of health and environmental safety.
• Monitored contractors to ensure timely and economic performance in accordance with company requirements.
• Enforced safety standards and discipline on site, introduced changes whenever necessary, as subtly as possible, to avoid disrupting existing process.
• Ability to provide innovative ideas in area of piping design, as well as installation methods and procedures.
• Skilled in preparing technical correspondence for clients, clearly and effectively.
• Excellent communicator and has the ability to build and maintain good relationship with the costumer.

IV. TOKUYAMA Polycrystalline Silicon Manufacturing Plant Project
Chiyoda Malaysia Sarawak
QA/ QC Inspector
Duration: September 20,2012 – December 20,2013
• Witnessing PMC (PRE MECHANICAL COMPLETION) activities including preparation, flushing/blowing and re instatement and Start-up.
• Witnessing OATT (Over All Tightness Test) with owner prior to turn over
• Verify that the quality related site activities are in accordance with the applicable codes and standards
• Participate in the site internal and external site audits
• Coordinate all the quality site inspections through the site QC inspectors
• Ensure all quality control documentation is complied and competed for as-built hand over through the QC turnover engineer
• Control all non-conformance reports and undertake remedial action
• Compete site quality control instructions and action remedial responses
• Review and revised ITP as per clients requirements.
• Witnessing, Fit-Up inspection of fabricated spools involving all aspects like orientation, material identify, traceability, dimensional accuracy and ensuring the use of latest revision approved drawings.
• To monitor and inspection of piping supports as per the isometric and support drawing.
• Line check and Preparation of punch listing.
• Ensure that all lines have been adequately cleaned, prior to hydro test or placing them in service.
• Witnessing for hydro testing and pneumatic testing for above ground piping.
• Following pressure testing, ensure that all valves are completely drained of test fluid and thoroughly dried.
• Monitoring the production welding before start, during & after welding to assure that it continues to produce satisfactory results.
• Closely monitor the consumable control system, such as baking and holding of low hydrogen type electrodes and filler wires.
• Review NDT test results, for clearing of package, witness & preparing hydro test and pneumatic test packages.

V. Yanbu II Water & Power Project
Hanwha Engineering and Construction
Piping Engineer
Duration: July 3, 2012 – September 3, 2012
• Prepared pipe isometrics, P & ID and piping plan with emphasis to process, economics, and safety of the piping system.
• Ability to coordinate and operate a Smart Plan 3D .
• Checked and review construction drawing to reflect actual site arrangement.
• Performed material take-off then monitored materials for procurement to ensure designed quantity and material specifications.
• Prepared engineering standard, and procedures for piping system and static equipment suitable to client and based on applicable.
• Review and revised ITP as per clients requirements.
• Prepare test packages and updating reports, documentation, schedules take-off timetable, presented said reports.
• Handled personnel and client queries regarding piping system.
• Participated in meetings and discussions with the clients and contractor regarding issues.
• Performed duties within guidelines of health and environmental safety.
• Monitored contractors to ensure timely and economic performance in accordance with company requirements.
• Enforced safety standards and discipline on site, introduced changes whenever necessary, as subtly as possible, to avoid disrupting existing process.
• Ability to provide innovative ideas in area of piping design, as well as installation methods and procedures.
• Skilled in preparing technical correspondence for clients, clearly and effectively.
• Excellent communicator and has the ability to build and maintain good relationship with the costumer.
• Responsible for generating design specifications, overseeing implementation and maintenance procedures of oil and gas pipeline piping.
• Handle responsibilities of conducting pipe stress calculations and engineering specifications by using finite element analysis methods, codes and procedures related to engineering functions.

VI. Habshan 5 U & O Project
Hyundai Engineering and Construction
QA / QC Piping and Welding Inspector
Duration May 24, 2011 –May 23, 2012
• Review of supplier quality plans against contract requirements
• Review procurement documents to ensure that quality requirement have been correctly translated into purchase requisitions and design documents
• Review supplier inspection procedures and personnel qualifications
• Review supplier material certificate
• Coordinate with the companies discipline engineers for the resolution of technical discrepancies
• Coordinate with management for quality improvements
• Issue of non conformance reports
• Track all non conformance reports
• Coordinate with the owners representative on all procurement issues
• Monitor progress of all purchase requisitions
• Implement the QA/QC management system at site
• Coordinate with quality inspections with all the site sub contractors and vendors coordinate all non destructive testing on site
• Coordinate with the customers representative on all quality matters
• Coordinate all receipt inspections
• Witnessing, Fit-Up inspection of fabricated spools involving all aspects like orientation, material identify, traceability, dimensional accuracy and ensuring the use of latest revision approved drawings.
• Witnessing for hydro testing and pneumatic testing for above ground piping.
• Following pressure testing, ensure that all valves are completely drained of test fluid and thoroughly dried.
• Monitoring the production welding before start, during & after welding to assure that it continues to produce satisfactory results.
• Closely monitor the consumable control system, such as baking and holding of low hydrogen type electrodes and filler wires.
• Review NDT test results, for clearing of package, witness & preparing hydro test and pneumatic test packages.
• Reviewing the PWHT charts cooling rate, heating rate, soaking period according to specification and approving the charts.

VII. Chiyoda – Hyundai Heavy Industries Consortium.
Pearl GTL Project, Ras Laffan Industrial City, Qatar.
QA / QC Piping Inspector
Duration: December 15, 2008 – February 2, 2011
• Ensure all quality control documentation is complied and competed for as-built hand over through the QC turnover engineer
• Control all non conformance reports and undertake remedial action
• Compete site quality control instructions and action remedial responses
• Review the customers specification and undertake relevant training to the site QC inspector
• Monitor the implementation of the approved site QC Plan
• Complete and coordinate the approval of the sites QC technical submittals to the customer
• To control the quality and traceability of all manufactured components in accordance with the Company’s Management System.
• Perform inspection requirements in accordance with the Company’s Product Quality Requirements.
• Monitor and Inspect fabrication work for compliance with quality requirements as per the Company Quality Control Procedures.
• Witnessing, Fit-Up inspection of fabricated spools involving all aspects like orientation, material identify, traceability, dimensional accuracy and ensuring the use of latest revision approved drawings.
• Witnessing for the bolt tightening procedure for flange as per the method statement.
• To monitor and inspection of piping supports as per the isometric and support drawing.
• Line check and Preparation of punch listing.
• Ensure that all lines have been adequately cleaned, prior to hydro test or placing them in service.
• Witnessing for hydro testing and pneumatic testing for above ground piping.
• Following pressure testing, ensure that all valves are completely drained of test fluid and thoroughly dried.
• Monitoring the production welding before start, during & after welding to assure that it continues to produce satisfactory results.
• Closely monitor the consumable control system, such as baking and holding of low hydrogen type electrodes and filler wires.
• Review NDT test results, for clearing of package, witness & preparing hydro test and pneumatic test packages.

VIII. IREM Spa
Yanbu Petrochemical (Yansab)
QA /QC Piping Inspector
Duration: March 4,2006-April 13.2007

• Responsible for Quality Control activities of Oil & Gas project, piping system, internals, pipelines.
• Review all approved documents such as project QCP, ITP, WPS, NDE procedures, etc.
• Witnessing for the fit-up inspection and monitoring welding process
• Performs inspection of Materials and dimension as per isometric and specification.
• Check that flange ratings, bolts & gasket materials and type are in accordance with design drawings and company specifications.
• Installation of valves and checking flow direction of check / globe valves.
• Check each test package prior to submission to ensure all inspection and NDE activities completed for that particular line by checking certain system generated reports like Line summary sheet, Line NDE status etc.
• Checking Hydro test document and reports ensure all punch list have been done and closed prior to testing.
• Responsible for witness each Hydro test and Leak Test.
• After test, ensures it is performing the flushing, blowing and re-torque.
• Visual inspection of welds as per code and specification.

IX. SK(Becthel) SGI/SGP(Kasakhztan)
Piping Enginer
Duration: September 19-November 27 2006
• Coordinate with the site construction manager on all quality issues Coordinate and chair the QA/QC site weekly meetings with the projects subcontractors QC personnel
• Elaborating inspection and test programs
• Ensure the safety is adhered to at site
• Assure all technical documents relative to site quality control are current status
• Ensures the quality records, acceptance certificates, mechanical completion certificates and the documentation for specific systems and buildings/areas are prepared and collated in accordance with project requirements
• Coordinate with the planning and scheduling department to ensure milestone dates are understood for each turn over area
• Coordinate with the site QC manager for the completion of as-built turnover documentation
• Resolve any discrepancies between the completed milestone and quality documentation
• Responsible for Quality Assurance & Quality control activities of Process Plant Piping System fabrication.

X. J-Ray mcdermott Dubai U.A.E.
Olefins Project (Onshore/Offshore)
QA / QC Piping Inspector
Duration: February 16 2005 -July 10,2006
• Review suppliers inspection and test plans against the milestone scope of work
• Coordinate with the commissioning department to define the scope of work
• Assist the site subcontractors to compile turnover dossiers
• Provide progress information for incorporation into project reports
• Monitor hydrostatic test packs for incorporation into as-built dossiers
• Consider the implications of delays in QC as-built turnover documentation and bring to the attention of the site QC manager
• Monitor and control the status of punch list and exception lists relevant to quality dossiers
• Attend the weekly QA/QC, and commissioning meetings
• Coordinate any inconsistencies with test packages.

XI. Drake&Skull International
4Season Hotel (Doha,Qatar)
QA / QC Piping Inspector
Duration: October 16,2002-November 3,2003
• Coordinate with management for quality improvements
• Issue of non conformance reports
• Track all non conformance reports
• Coordinate with the owners representative on all procurement issues
• Monitor progress of all purchase requisitions
• Implement the QA/QC management system at site
• Coordinate with quality inspections with all the site sub contractors and vendors coordinate all non destructive testing on site
• Coordinate with the customers representative on all quality matters
• Coordinate all receipt inspections
• Witnessing, Fit-Up inspection of fabricated spools involving all aspects like orientation, material identify, traceability, dimensional accuracy and ensuring the use of latest revision approved drawings.
• Witnessing for hydro testing and pneumatic testing for above ground piping.
• Following pressure testing, ensure that all valves are completely drained of test fluid and thoroughly dried.
• Monitoring the production welding before start, during & after welding to assure that it continues to produce satisfactory results.
• Closely monitor the consumable control system, such as baking and holding of low hydrogen type electrodes and filler wires.
• Review NDT test results, for clearing of package, witness & preparing hydro test and pneumatic test packages.
• Reviewing the PWHT charts cooling rate, heating rate, soaking period according to specification and approving the charts.
• Adhere to the company’s safety procedures and policies.

TRAINING
• Confined Space Entry
Dubai UAE
Certificate No. 131697
Certification Date : 22.10.2016
Certificate Validity : 21.10.2018
• SOLAS(ESTDC) Abu Dhabi, U.A.E Certificate No. 03217/2005
Issue Date : 28.03.2005
Expiry Date : 27.03.2008

CHARACTER REFERENCES
Rheydelley M. Bolaso
Hyundai Heavy Industries Kuwait
+965 94126703
Lead Supervisor in
• Habshan U & O Project Abu Dhabi UAE
• Mirfa Power Plant Abu Dhabi UAE

Nover Libio
GS Engineering & Construction
Dhurma Power Plant Riyadh, KSA
+966533173225
Lead Engineer in
• Pearl GTL Project Ras Laffan Qatar
• PP12 GS Engineering & Construction Riyadh KSA

Roderick Balugay
Nesma and Partner Jubail KSA
+966 502634352
Co Inspector in
• Chiyoda Malaysia

PERSONAL DETAILS

Date of Birth: 29 January 1981
Present Address: Jebel Ali M Station Project Dubai UAE
Mobile: +971561305791
Languages Known: English, Tagalog
Marital Status: Married
Nationality: Filipino
Passport Details: Passport Number : EC3189843
Place of Issue : DFA (Manila)
Date of Expired : Jan 14 2020

DECLARATION

I hereby declare that the above-furnished details are true with best of my knowledge and belief.

Rafael Moran Edrozo

Experience

October 2016 to August 2018 Piping Engineer at Siemens Dubai
August 2015 to September 2016 Piping Engineer at Hyundai E &C Abu Dhabi