Photo

ARNEL A RESOLME Construction

Canada

ARNEL A RESOLME

584-1 San Andres Street

Malate. Manila.

Email Add [email protected]

OBJECTIVE.

To join an organization where l can apply my knowledge and skills to help improve operation and contribute to the company advancement.

PERSONAL INFORMATION.

Date Of Birth    March 13. 1970

Place Of Birth   lbà Zambales

Age                      48 Yrs Old

Height                  5/5

Weight                  80

Civil Status           Married

Religion                 Roman Catholic

Nationàlity            Filipino

EDUCATIONAL BACKGOUND

SECONDARY          Zambales

High School            1985-1989

PRIMARY                 Lawak Elementary             School

1979-1985

EMPLOYMENT HISTORY.

COMPANY               Imperial Pacific.

PLACE                       Saipàn

POSITION                 All Around Mason (Finishing & Rough)

PERIOD                      june 29.2018 October                      11. 2018

DUTIES & RESPONSIBILITIES.

CHB LAYING.

Prepare lay out using hand tools

Drill flooring for dowel bars

Then space between dowel bars is 40 cm

put mix cement for the first layer of CHB

P

put CHB ((40cmx20cmx15cm/40cmx20cmx10cm)

Put horizontal bar between every 3layer of CHB

Put mortal cement between CHB tool join and prepare scratch

PLÀSTERING.

Prepare lay out using hand tools

Clean wall then wet.

Before applying mix cement to the wall.

Use aluminum level bar Rough wall before applying pure cement for finishing.

CONCRETING.

Level the mix cement using aluminum bar.

Use hand tools /trowel machine for finishing.

TILE SETTING.

Prepare floor before star laying tiles.Make sure that tour flooring is clean and dry.

Measure and mark of datum lines

Mix up the adhesive of tiles.

Dry.laying of tiles.

lnsert the riles spacers

Cut your tiles to. size Cut your riles fir drainage.

RETOUCH AND FINISHING.

Beam column, sealing & Door opening.

Window openig and overhead.

Using hand tools /power tools.

COMPANY        MDC ASIAPRO CO

PLACE               Makati City Philippine

POSITION         All Around Mason (Finishing & Rough)

PEROUD            August 16. 2016- May 11. 2018

DUTIES & RESPONSIBILITIES.

SPread. level and smooth conrete. using rake. shovel .hand or power. hand or power screed.and float.

Spread concrete other aggregate mixtures.

Finish conrete surfaces.

Mold expansion joints and edges. using edging tool. jointers. and straightedge.

Finish concrete surfaces.

Clean chipped area.using wire brush. and fell and observe surface to determine if it is rough or uneven.

Clean surface in preparation for work activities.

Chip. scrape. and grind high spots. ridges. and rough projections to finish concrete.

using pneumatic chisels. power grinders. or hand tools.

Smooth surface with abrasive materials or tools.

wet surface to prepare for bonding. fill holes and cracks with grout or slurry. and smooth using trowel.

prepare surfaces for finishing.

lnstall masonry materials.

Apply material to fill gaps in surfaces.

Build wooden mold. andclamp moldround area to be repaired. usinghand tools.

Position construction forms or mold.

Buid construction forms or mold.

COMPANY         Al-Osais Contracting Companay

PLACE                  Dammam. KSA

POSITION            All Around Mason

PERIOD                 June 8. 2007- January                 25. 2016

DUTIES & RESPONSIBILITIES.

CEMENT MASON.

Concreting spreading super flat(tools) power trowel. vibrator. alum bar. magnesium float. bull float finishing trowel concrete edger. concrete jointer. Finishing broom.

Concreting of floor slab and staircase block layer. plastering of concrete of ceiling straight to tinish use by tin adhesive. plastering of wall rough and smooth finsh.

tile setting and installing of vinyl tiles. good housekeeping before leave the area.

FINISHING.

Plastering of concrete wall use by mixing cement. Laying concrete hallow

Block. installing of wall stone. instlling of flooring tiles such us ilving room. dining and terrace. concrete pouring of slab beam column. Fabricate and lnstall of Form works. such as Beam alab and Column. Good Housekeeping before leave the area

Lays building materials. including current and brick. and constructs or repairs surfaces or structures.This is a journey-journey-level classification. working conditions

include restricted movement dirty environment. extreme temperatures. lifting orcarrying heavy objects.

Prepares surfaces prior to beginning work.

Febricates. alters. repairs. and màintains walls. sidewalks. street curbs. floors.or surfaces.

Lays blocks or bricks following blueprints. plans or drawing.

Determines work requirements and sequence of masonry/tiles assignments through review of work orsers. plans. or drawing.

Lays out work using chalk lines. plumbbobs. tapes. squares. and levels.

Mixes cement using hoes. cement -mixing. and /or hand tools.

Cuts or breaks bricks and concrete using hammers. Dowered abasive saws. Daving breakers. drills and/or hand tools.

Mold expansion joints and edges using edging tools jointers. and Estimates materials.

I HEREBY. TO CERTIFY WITH ALL MY KNOWLEDGES AND BELIFE. THAT THE INFORMATION ABOVE ARE TRUE AND CORRECT

ARNEL A RESOLME.

Applicant.