Photo

Hazel D. Casurao Quantity Surveyor

United Arab Emirates
AutocadDrivingMS OfficePrimavera

HAZEL D. CASURAO
Mobile No.:   +63 919 4715060
+63 945 1677375

Brgy. Sauyo, Quezon City
Philippines

Email Address:  [email protected]
[email protected]

POSITION APPLIED:  QUANTITY SURVEYOR

OBJECTIVES
1.   Seeking new challenges in Quantity Surveying and Cost Estimating which effectively utilizes my work experiences.
2.   Looking to join a progressive organization that has need for a Quantity Surveyor and offers opportunities for advancement.

WORK EXPERIENCES

Company Name                   :  NORTHCROFT QATAR
Mackeen Building, Grand Hamad St.
Doha, Qatar
Position                                 :  Sr. Quantity Surveyor
Duration                                :  April 15, 2017 to January 31, 2018
Client                                     :  CCC (Depot 1- Short Term Contract),
Fujita (Qatar Rail Project),
Midmac-Yuksel JV (Lusail Development Primary                                                            Infrastructure) Construction Package CP4

Work Description:
Conducted quantity take off and re-measurement of Bill of Quantities (Pre-contracts) for Client’s final approval.
Prepared Bill of Quantities (Pre-contracts).
Measured, valued, submitted and negotiated contract variations with Client’s Commercial Consultant.
Maintained a schedule of submission and responses for approvals and variations.
Updated variation log and ensure that proper records are being maintained on site.
Maintained all QS documents and logs/registers as applicable.
Prepared and submitted cost proposals to the Client, as required.
Coordinated with all company departments as required for the execution of the project.
Conducted quantity take off and estimates on various stages of the project, as required by the Contract Administrator and Project Manager.
Prepared detailed itemized BOQ and cost estimates, as required by the Contract Administrator.
Prepared and submitted cost analysis for the project, repairs and other works, as required by the Contract Administrator.
Arranged to extract accurate quantities from tender and other drawings, for each component of the project.
Arranged to re-check and re-verify quantities as required.

Company Name                   :  QUANTUM GLOBAL SOLUTION / QQSS
Prisma Building, Al Muntazah
Doha, Qatar
Position                                 :  Quantity Surveyor
Duration                                :  February 1, 2014 to April 14, 2017
Client                                     :  Midmac-Yuksel Joint Venture
Projects Undertaken           : Lusail Development Primary Infrastructure
Construction Package 4 (CP4) – Road A1, Road A6,
Marina Interchange and Southern Interchange
(Lusail Real Estate Development Company)

Work Description:
Measured, valued, submitted and negotiated contract variations with Client’s Commercial Consultant.
Maintained a schedule of submission and responses for approvals and variations.
Updated variation log and ensure that proper records are being maintained on site.
Maintained all QS documents and logs/registers as applicable.
Prepared and submitted cost proposals to the Client, as required.
Coordinated with all company departments as required for the execution of the project.
Conducted quantity take off and estimates on various stages of the project, as required by the Contract Administrator and Project Manager.
Prepared detailed itemized BOQ and cost estimates, as required by the Contract Administrator.
Prepared and submitted cost analysis for the project, repairs and other works, as required by the Contract Administrator.
Arranged to extract accurate quantities from tender and other drawings, for each component of the project.
Arranged to re-check and re-verify quantities as required.

Company Name                   :  LEIGHTON CONTRACTORS (PHILS) INC.
Makati City, Philippines
Position                                 :  Quantity Surveyor / QS Engineer II
Duration                                :  January 2, 2012 to May 31, 2013
Projects Undertaken           : Zuellig Building Project
Davao Power Plant

Work Description:
Prepared and submitted sub-contractors’ interim payment certificates and final accounts.
Valued completed work for sub-contractors’ interim payments certificates.
Evaluated sub-contractors’ claim.
Reconciled with sub-contractors’ QS for final payments.
Arranged to re-check and re-verify quantities for sub-contractors’ final payments, as maybe required.
Prepared sub-contract documentation for post contract inquiries and order confirmation.
Arranged to extract accurate quantities from BOQ for sub-contractors’ scope of works, as may be required.
Arranged to prepare itemized BOQ for sub-contractors, according to scope of works, as may be required.
Checked and verified sub-contractors’ proposed unit rates and quantities for variations and additional works.
Prepared and submitted variation costs and claims to the Consultant.
Prepared and submitted monthly Progress Claim and Forecast Claim to the Client.

Company Name                   :  ABDULLAH AL MUFTAH TRADING & CONT. CO
Doha, State of Qatar
Position                                 :  Quantity Surveyor
Duration                                :  June 8, 2007 to August 12, 2011

Projects Undertaken           : Catholic Community Center, Doha, Qatar
Inter-Denomination Christian Church, Doha, Qatar
Residential Development (B+G+6), Doha, Qatar
Residential Compound at West Bay, Doha, Qatar
B+G+1 AL Manaa Villa, Doha, Qatar
New Car Park Area, Messaeid, Qatar

Work Description:
Prepared and submitted variation costs and claims to the Main Contractor.
Performed quantity take-off from drawings and compare with site measurements, for BOQ comparison.
Prepared site daily report, as required by the Consultant.
Maintained a schedule of submission and responses for approvals, inspections & variations.
Prepared and submitted all measured works, as required by the Project Manager.
Maintained all QS documents and logs/registers applicable.
Coordinated with all company departments as required for the execution of the project.
Conducted quantity take off and estimates on various stages of the project.
Prepared cost proposal, as required.
Prepared and submitted cost analysis for the project, repairs and other works.
Arranged to extract accurate quantities from tender and other drawings, for each component of the project.
Prepared detailed itemized BOQ.
Arranged to re-check and re-verify quantities as required.
Arranged to prepare technical submission and documentation to Client and Consultant.
Provided all necessary help for timely submission of tender.

Company Name                   :  MUNICIPAL ENGINEERING OFFICE
Catbalogan City, W. Samar
Philippines
Position                                 :  Engineer I
Duration                                :  July 2004 to May 2007
Projects Undertaken           : Road project (DAR/ADB/ARC project)

Work Description:
Prepared Program of Work of various Municipal and Special projects.
Coordinated with the Local Project Office Engineer for the implementation of the subproject based on the approved construction schedule, plans and specifications.
Supervised subproject implementation full time of the DAR/ADB/ARC project.
Monitored project accomplishments.
Prepared monthly accomplishment reports, logbooks and other related documents for review of LPOE.

Company Name                   :  NATIONAL IRRIGATION ADMINISTRATION
Borongan, Eastern Samar
Philippines
Position                                 :  Engineer B (Planning In-charge)
Duration                                :  November 1996 to June 2004
Projects undertaken            :  Dolores Irrigation Project
Communal Irrigation Projects

Work Description:
Supervised and prepared the feasibility study reports of proposed irrigation projects.
Prepared Program of Works for costs and estimates.
Monitored project cost, for monthly submission.
Prepared and submitted Program of Work for irrigation projects (construction) and pre-engineering activities.
Supervised data gathering for pre-engineering activities.
Prepared and submitted monthly accomplishment reports of pre-engineering activities and Pump Irrigation Development Projects.
Prepared and submitted other monthly and annual reports.
Prepared and submitted the 5-Year Irrigation Development Plan.

Company Name                   :  NATIONAL IRRIGATION ADMINISTRATION
Catbalogan, Western Samar
Philippines
Position                                 :  Engineering Assistant A
Duration                                :  November 1994 to August 1995

Work Description:
Conducted agro-economic survey, evaluation and analysis of data, and profile write-up of proposed irrigation project.
Prepared feasibility study reports of proposed irrigation projects.
Prepared and submitted monthly accomplishment reports of pre-engineering activities.
Prepared and submitted Program of Work for pre-engineering activities.
Supervised data gathering for pre-engineering activities.
Prepared and submitted other monthly and annual reports.
Prepared and submitted the 5-Year Irrigation Development Plan of NIA-WSPIO.

EDUCATION / PROFESSIONAL LICENSE
Registered Civil Engineer
(PRC License No. 71116 s 1994)
Bachelor of Science in Civil Engineering
University of San Carlos
Cebu City
Philippines

TRAININGS AND SEMINARS

FUNDAMENTALS OF FOUL WATER (SEWER) PLANNING & DESIGN
Philippine Institute of Civil Engineers, Qatar Chapter
International Chapter No. I-03
Doha, Qatar
21 July 2017

SEMINAR ON PREPARATION OF CONSTRUCTION CLAIMS
Philippine Institute of Civil Engineers, Qatar Chapter
International Chapter No. I-03
Doha, Qatar
21  April 2017

CIVIL ENGINEERING PROFESSION COMPETENCY COURSE
Philippine Institute of Civil Engineers, Qatar Chapter
International Chapter No. I-03
Doha, Qatar
03 March to 07 April 2017

VARIATION IN CONSTRUCTION CONTRACT
CEBS Training Centre
Doha, Qatar
29  January 2017 to 01 February 2017

PROFESSIONAL CERTIFICATE IN QUANTITY SURVEYING
CEBS Training Centre
Doha, Qatar
9     September 2016 to 9 December 2016

SEMINAR ON TREATED SEWAGE EFFLUENT (TSE)
PLANNING AND DESIGN
Philippine Institute of Civil Engineers, Qatar Chapter
International Chapter No. I-03
Doha, Qatar
29 July 2016

QUANTIFICATION AND COSTING IN CONSTRUCTION
CEBS Training Centre
Doha, Qatar
15  June 2016 to 22 July 2016

TECHNICAL AND COMMERCIAL BID PROPOSALS
3 Fold Education Centre
Doha, Qatar
16  April 2016

SEMINAR/WORKSHOP ON QUANTITY SURVEYING FUNDAMENTALS
AND QATAR STANDARD METHOD OF MEASUREMENT
Philippine Institute of Civil Engineers, Qatar Chapter
International Chapter No. I-03
Doha, Qatar
15 March 2016

USAGE OF APPLIED EARNED VALUE MANAGEMENT IN PROJECT
MANAGEMENT INFORMATION SYSTEM
3 Fold Education Centre
Doha, Qatar
29  January 2016

COST ESTIMATING AND BUDGETING
3 Fold Education Centre
Doha, Qatar
19  December 2015

SIMPLIFIED PLUMBING DESIGN AND CONTROL SYSTEM FOR PLUMBING, DESIGN AND IRRIGATION
Philippine Society of Mechanical Engineers, Qatar Chapter
Doha, Qatar
21 August 2015 to 28 August 2015

COST ENGINEERING
Madras Management Training Institute,
Doha, Qatar
28 December 2014 to 11 February 2015

CONSTRUCTION COST ESTIMATING AND ANALYSIS
National Engineering Center
University of the Philippines
Quezon City, Philippines
26 June 2013 to 28 June 2013

MEMBERSHIP

Member (PICE ID No. 213), Philippine Institute of Civil Engineers, Qatar Chapter
Member, Filipino Tennis League, Qatar

SKILLS

MS Word, Excel, Power Point & Internet – Advance
AUTO CAD –  Intermediate
Primavera (P3) –  Intermediate
Quantitative analysis –  Advance
Driving (with valid Philippine & Qatar Driving Licenses)

LANGUAGES SPOKEN
English
Filipino/Tagalog
Waray-waray

PERSONAL DATA

Date of Birth              :   18 April 1971
Nationality                 :   Filipino

Education

June 1988 / March 1993 Bachelor of Science in Civil Engineering at University of San Carlos

Experience

April 15, 2017 / January 31, 2018 Sr. Quantity Surveyor at Northcroft Qatar

Work Description:
” Conducted quantity take off and re-measurement of Bill of Quantities (Pre-contracts) for Client’s final approval.
” Prepared Bill of Quantities (Pre-contracts).
” Measured, valued, submitted and negotiated contract variations with Client’s Commercial Consultant.
” Maintained a schedule of submission and responses for approvals and variations.
” Updated variation log and ensure that proper records are being maintained on site.
” Maintained all QS documents and logs/registers as applicable.
” Prepared and submitted cost proposals to the Client, as required.
” Coordinated with all company departments as required for the execution of the project.
” Conducted quantity take off and estimates on various stages of the project, as required by the Contract Administrator and Project Manager.
” Prepared detailed itemized BOQ and cost estimates, as required by the Contract Administrator.
” Prepared and submitted cost analysis for the project, repairs and other works, as required by the Contract Administrator.
” Arranged to extract accurate quantities from tender and other drawings, for each component of the project.
” Arranged to re-check and re-verify quantities as required.

February 1, 2014 / April 14, 2017 Quantity Surveyor at Quantum Global Solution

Work Description:
” Measured, valued, submitted and negotiated contract variations with Client’s Commercial Consultant.
” Maintained a schedule of submission and responses for approvals and variations.
” Updated variation log and ensure that proper records are being maintained on site.
” Maintained all QS documents and logs/registers as applicable.
” Prepared and submitted cost proposals to the Client, as required.
” Coordinated with all company departments as required for the execution of the project.
” Conducted quantity take off and estimates on various stages of the project, as required by the Contract Administrator and Project Manager.
” Prepared detailed itemized BOQ and cost estimates, as required by the Contract Administrator.
” Prepared and submitted cost analysis for the project, repairs and other works, as required by the Contract Administrator.
” Arranged to extract accurate quantities from tender and other drawings, for each component of the project.
” Arranged to re-check and re-verify quantities as required.

January 2, 2012 / May 31, 2013 QS Engineer II at Leighton Contractors (Phils) Inc

Work Description:
” Prepared and submitted sub-contractors’ interim payment certificates and final accounts.
” Valued completed work for sub-contractors’ interim payments certificates.
” Evaluated sub-contractors’ claim.
” Reconciled with sub-contractors’ QS for final payments.
” Arranged to re-check and re-verify quantities for sub-contractors’ final payments, as maybe required.
” Prepared sub-contract documentation for post contract inquiries and order confirmation.
” Arranged to extract accurate quantities from BOQ for sub-contractors’ scope of works, as may be required.
” Arranged to prepare itemized BOQ for sub-contractors, according to scope of works, as may be required.
” Checked and verified sub-contractors’ proposed unit rates and quantities for variations and additional works.
” Prepared and submitted variation costs and claims to the Consultant.
” Prepared and submitted monthly Progress Claim and Forecast Claim to the Client.

June 8, 2007 / August 12, 2011 Quantity Surveyor at Abdullah Al Muftah Trading and Cont. Co

Work Description:
” Prepared and submitted variation costs and claims to the Main Contractor.
” Performed quantity take-off from drawings and compare with site measurements, for BOQ comparison.
” Prepared site daily report, as required by the Consultant.
” Maintained a schedule of submission and responses for approvals, inspections & variations.
” Prepared and submitted all measured works, as required by the Project Manager.
” Maintained all QS documents and logs/registers applicable.
” Coordinated with all company departments as required for the execution of the project.
” Conducted quantity take off and estimates on various stages of the project.
” Prepared cost proposal, as required.
” Prepared and submitted cost analysis for the project, repairs and other works.
” Arranged to extract accurate quantities from tender and other drawings, for each component of the project.
” Prepared detailed itemized BOQ.
” Arranged to re-check and re-verify quantities as required.
” Arranged to prepare technical submission and documentation to Client and Consultant.
” Provided all necessary help for timely submission of tender.

July 2004 / May 2007 Engineer I at Municipal Engineering Office

Work Description:
” Prepared Program of Work of various Municipal and Special projects.
” Coordinated with the Local Project Office Engineer for the implementation of the subproject based on the approved construction schedule, plans and specifications.
” Supervised subproject implementation full time of the DAR/ADB/ARC project.
” Monitored project accomplishments.
” Prepared monthly accomplishment reports, logbooks and other related documents for review of LPOE.

November 1996 / June 2004 Engineer B at National Irrigation Administration

Work Description:
” Supervised and prepared the feasibility study reports of proposed irrigation projects.
” Prepared Program of Works for costs and estimates.
” Monitored project cost, for monthly submission.
” Prepared and submitted Program of Work for irrigation projects (construction) and pre-engineering activities.
” Supervised data gathering for pre-engineering activities.
” Prepared and submitted monthly accomplishment reports of pre-engineering activities and Pump Irrigation Development Projects.
” Prepared and submitted other monthly and annual reports.
” Prepared and submitted the 5-Year Irrigation Development Plan.

November 1994 / August 1995 Engineering Assistant A at National Irrigation Administration - Western Samar

Work Description:
” Conducted agro-economic survey, evaluation and analysis of data, and profile write-up of proposed irrigation project.
” Prepared feasibility study reports of proposed irrigation projects.
” Prepared and submitted monthly accomplishment reports of pre-engineering activities.
” Prepared and submitted Program of Work for pre-engineering activities.
” Supervised data gathering for pre-engineering activities.
” Prepared and submitted other monthly and annual reports.
” Prepared and submitted the 5-Year Irrigation Development Plan of NIA-WSPIO.