ROMUALDO V. TIQUIA, BSCE
0653 Alido Phase1, Virgen Delas Flores,
Baliuag, Bulacan, 3006
Philippines
Cel. No. +639391805943 / +639988828647
Home: +63447664597, Philippines
Email: [email protected],
OBJECTIVE
To apply my knowledge and utilize my acquired professional skills in the development, direction, and execution of construction projects and ensuring customer satisfaction and to be have an excellent contribution to the progress of the company.
CAREER PROFILE
Competent, diligent & result oriented civil engineer professional in the field of supervision, project coordination & project execution with a solid background in design and works preparation.
Prepare Project Baseline Schedule and Detailed Plan in Primavera.
Prepare construction schedule of materials, labor & equipment
Estimating and preparing quantity survey covering tender preparations, quantity take off, variation order, progress billing, valuation accomplishment and invoicing
Review the technical documents from vendors & subcontractor and managing all subcontracting works (contract, progress monitoring & control)
Preparing and submitting weekly & monthly progress report.
Proven effective in construction management, a meticulous and systematic worker with good organization skills, focused on cost efficiency and progress.
Hardworking and can work under pressure with minimum amount of supervision.
Working independently or as part of a team and highly motivated to provide an excellent result on time.
WORK EXPERIENCE
JULIUS BERGER NIGERIA PLC, 15 Ijora Causeway, Lagos, Nigeria
Technical Office Engineer / Planning Engineer / Scheduler / Quantity Surveyor (09/2016 – 02/2019)
Project
Rehabilitation, Reconstruction and Expansion of Lagos – Ibadan Dual Carriageway Section 1 (Lagos – Shagamu) 44 kilometers
Proposed 20 Storey Head Office Development (Lagos Famfa oil Tower)
Rehabilitation of 77 km long carriageway from Lagos to Abeokuta
Duties & Responsibilities :
Preparing project execution plans and construction sequence
Preparing and submitting to the client the weekly progress report & weekly photo
Do planning for new incoming projects incorporating the engineering design, procurement aspect, and construction project to create a master program schedule
Loading of resources – materials, labor, plant and machinery needed to carry out a construction project according to the BOQ, drawings, plans, and technical specification
Preparing and submitting to the Client the actual weekly man-hours with direct and indirect man-hours
Preparing and submitting to the client the Monthly Report which include of all engineering and procurement status, schedule and progress Summary (plan & actual), document control register, HSE statistic, cost and contract, equipment report and progress photograph
JULIUS BERGER NIGERIA PLC, Bonny Island, Port Harcourt, Nigeria
Planning Engineer / Scheduler / Head Quantity Surveyor (05/2009 – 08/2016)
Project
EPCC of Revamp of NLNG MOF Jetty 2 Facilities Project
EPCC of Marine Control Building & VTIMS Project for Nigeria LNG Limited
EPC of an Airfield (Bonny River Terminal Airstrip) for Nigeria LNG Limited on Bonny Island
RA 238 Rotator Apartment 3 storey building (10 buildings)
EPC of RA Hospital Laboratory Extension
Bonny Integrated Business Complex Phase 1 Site Preparation and Jetty Phase 1
Clubhouse Extension Modification and Expansion
Civil Works for Lighting Upgrade NLNG Jetty 1 & 2
Duties & Responsibilities
Do planning for new incoming projects incorporating the engineering design, procurement aspect, and construction project to create a master program schedule
Loading of resources – materials, labor, plant and machinery needed to carry out a construction project according to the BOQ, drawings, plans, and technical specification
Weekly updating all activities and scheduling the progress of the project comparing the schedule % complete versus performance % complete (plan % versus actual %)
Preparing and estimating the tender document
Preparation of claims change and extra orders
Preparing and submitting monthly valuation (value of work done) to the Client
Preparing and submitting to the Client the actual weekly man-hours with direct and indirect man-hours
Preparing and submitting to the client the Monthly Report which include of all engineering and procurement status, schedule and progress Summary (plan & actual), document control register, HSE statistic, cost and contract, equipment report and progress photograph
I.T.B. NIGERIA LIMITED, 1684 Sanusi Fafunwa St. Victoria Island, Lagos P.O. Box 60336, Ikoyi, Lagos, Nigeria
Planning Engineer / Scheduler / Quantity Surveyor (07/2006 – 03/2009)
Project
Milan Intercontinental Hotel 24th storey building
Waves Office Projects10th storey (4 building)
Ocean Parade Phase II 12th Storey (4 building)
UACN Apartment 7th storey (2 building)
Le Meridien Hotel 16th storey building
Duties & Responsibilities
Preparing master schedule and detailed schedule for the new project which includes activity ID, activity name, original duration, baseline project start, baseline project finish, activity logic and total float
Loading of resources – materials, labor, plant and machinery needed to carry out a construction project, plans, and technical specification.
Creating schedule of rates items (SOR), rate analysis (Global & Site Level) and resources rate estimate
Monitoring site progress through inputting actual date of activity start and finish, actual percentage work done, actual expenses, and actual resources consumption.
Updating and scheduling the site progress status and directly reported to the Cost Control Manager.
Recording daily resources consumption (materials, labor, tools & equipment)
Inputting daily requisition which linked directly to inventory section
Preparing weekly and monthly report such as resources contribution, cost breakup, cost variance, resource consumption, daily progress, monthly program, materials requisition, and material job cost.
Preparing quotations, work orders, measuring work and billing for subcontractor
ARABIAN OIL AND GASFIELD SERVICES LLC, P.O. Box 2795, Ruwi, P.C. 112 Sultanate of Oman
Site Engineer / Quantity Surveyor (02/2001 – 03/2005)
Project
Construction of administration building & warehouse
Equipment foundation for pumps, transformers, hypo chloric generators and tanks foundation
Cable trenches, slab works, stair and flat form, and other accessory offsite works
Building construction and chemical storage at Oman Cement Corporation
Construction twin villa of Saada Al-Aufy
Ministry of Defense car park construction
Maintenance projects such as steel structures, concrete structures, safety fences, and all other works categorized as maintenance work.
Duties & Responsibilities
Attending project progress site meeting with the clients and/or consultants
Taking appointment to the clients for the new project’s inquiries
Preparing quotation for new projects and estimating bill of quantity (BoQ) includes cost of materials, labor, equipment and overhead cost
Daily supervising and monitoring the status of the site
Preparing and submitting weekly and monthly report to the Project Manager (i.e. progress of every activity, summary progress percentage, man-hours report, cost report, etc.)
Quantity survey and estimating of new change orders
Do monthly invoicing on progress completed work
AL-ZEERA INTERNATIONAL POOLS, P.O. Box 346, Manama State of Bahrain
Site Engineer / Quantity Surveyor / Sales Engineer (09/1994 – 12/1999)
Project
Semi Olympic pool for H.H. SHK Hamad Bin Salman Al Khalifa
Three swimming pools with Jacuzzi for Nasser Hassa Compound
Seven swimming pool for Abdul Nabi Compound
Elevated Pool Al-Qaed Apartelle
Semi Olympic overflow type to Mustafa Jalali
Hospital construction, expansion and renovation of Dr. Osama Almoayyed
Construction of artificial lagoons and landscaping works for Col. Salman Zayani
Duties & Responsibilities
Submit weekly and monthly transparent report to the Director of Operation about the progress of the project
Attend project site meeting and appointment with clients and/or consultants
Responsible in Project production and quality monitoring
Responsible in completion and turn-over of the project to the client
Responsible in commissioning and demonstration of the project
Responsible in after-sales maintenance of the project
Design structures and hydraulic for water filtration systems of swimming pools, fountains, artificial lagoons, waterfalls, water walls, water features and other associated facilities
Landscaping design and construction
Estimate and prepare quotation for swimming pool and SPA Construction, water feature and renovation work
Prepare list of manpower and their scope of work for everyday work schedule
Procure and controlling of materials, tools, equipments, and chemicals
Marketing and sales of products and services of the following categories: SBD Products for concrete repair and restoration, Industrial Coating Application, Mathios décor stone and refractories, Hayward and Certikin Products such as Pumps, Heat Pump, Blower, Filters, Chlorinator, Electric and Gas Heaters, Underwater light, Fountains, and Water Chillers
CEEMM Construction Corporation, 2259 Pres. Quirino Ave. Paco, Manila
Site Engineer / Estimator (10/1987 – 08/1994)
Project
Construction of warehouse and canteen building at San Miguel Corporation
Boiler & Control House at Pure foods Corporation
Installation of Gen Set House and associated equipment at Philippine Long Distance Telecommunication
Construction of elevated water tank, caustic soda tank and piping works at Polyphosphate Corporation
Installation of antenna tower for Globe and Smart Communications, Incorporation
Pipelines repainting & other associated works at Petron Refineries in Limay, Bataan
Maintenance Works at Caltex Refineries & Caltex Main Office
Maintenance Services at Lungs Center Hospital of the Philippines
Duties & Responsibilities
Manage and supervise construction of the manufacturing facilities such as the Production building, Administration building, Canteen building, Generator house, Warehouse building, roads and drainage, rip rapping, elevated water tank, deep well drilling, water distribution system, electrical distribution system and tower antenna
Estimating the Bill of Quantity (BOQ) of materials
Prepare program of work such as Bar Chart, PERT-CPM, Manpower Distribution and Cash Flow Diagram
Preparing project costing and scheduling of payments
Inspection and Payment approval of the progress billing presented by the sub contractor prior for payments processing
Quality control of materials to be applied/purchased for the project
Supervise, monitor and prepare weekly progress report
Coordinate with the resident inspector regarding work schedule
SKILLS
Excellent knowledge of Primavera P6 software and Microsoft Project Professional, AutoCAD / AutoCAD Civil 3D (Quantity Survey) and Julian – MTA Equipment
Excellent knowledge in Microsoft Office, Excels 2016, Word 2016, Outlook 2016 & Web Base ERP Solution
Good attention to detail with good time management skills
Good knowledge of construction
Good scheduling skills
Project Control, Tracking & Measurement
Excellent problem-solving skills
Good financial and numeracy management skills
Highly organized
Able to multitask efficiently and effectively
Great interpersonal skills
Leadership skills
EDUCATION
1982 – 1987 College Degree Baliuag University, Baliuag, Bulacan
Bachelor of Science in Civil Engineering
1985 – 1985 Special Course National Manpower & Youth Council, Guiguinto, Bulacan
Industrial Electricity
1978 – 1982 Secondary Mariano Ponce High School, Baliuag, Bulacan
1972 – 1978 Elementary Sta. Barbara Elementary School, Baliuag, Bulacan
Passed – Civil Engineering Board Examination, Civil Engineer Registration No. 0064426 issued September 1992
Passed – Trade Test Building Electrician
SEMINARS / COURSES ATTENDED
2018 Basic First Aid Nigerian Red Cross Society, Shagamu, Nigeria
2018 Primavera P6 Professional Advanced Rel 16 Ed 1 Oracle University, Online Course
2018 Primavera Advanced Training P6 Rel 16 Julius Berger Nigeria Plc, Abuja, Nigeria
2014 Advanced Project Management in Primavera P6 Rel 8.3 First Fossil Nigeria Limited, Abuja, Nigeria
2010 Platinum Safety Award Julius Berger Nigeria Plc., Bonny Island, Nigeria
2009 Primavera Project Management Advanced Course 106 Total Technology Consultants Ltd., Abuja, Nigeria
2006 Project and Contract Management EKO Hotel and Suites, Lagos, Nigeria
2005 AutoCAD version 2005 UIST, Baliuag, Bulacan, Philippines
1993 Computer-Aided Structural Analysis and Design Quality Computer System, Inc., Manila, Philippines
1992 Computer-Aided Construction Project Management Quality Computer System, Inc., Manila, Philippines
1987 Seminar on Seismic Analysis APRC, Manila, Philippines
REFERENCES
Mr. Thomas Christl Mr. Peter Fausel
Project Manager Project Manager
Julius Berger Nigeria PLC Julius Berger Nigeria PLC
Lagos, Nigeria Lagos, Nigeria
Phone: +234 813 109 5179, Ext. 1604 Phone: +234 810 204 3901, Ext. 1688
Email: [email protected] Email: [email protected]
Mr. Alfredo Gatus
Head Quantity Surveyor
Julius Berger Nigeria PLC
Lagos, Nigeria
Phone: +234 703 930 7964, Ext. 1695
Email: [email protected]
I hereby certify that all written information above are true and correct to the best of my ability and belief.
ROMUALDO V. TIQUIA
Civil Engineer / Site Engineer
Planning Engineer / Scheduler
Quantity Surveyor / Estimator
Technical Office Engineer
College graduate and passing Philippines Regulation Commission on national board examination as professional civil engineer
Passing oral & written trade test examination as 3rd class building wiring electrician