Curriculum Vitae
Melchor M. Celis
PHIL’S ADDRESS : 244 San Miguel, San Simon C-2015,
Pampanga, Philippines
E-mail add: [email protected]
Mo.# 0063-905-142-2992 (Philippines)
00971-50-1732-987 (Abu Dhabi, U.A.E)
Driving License: Philippines & Qatar
DATE OF BIRTH : 06 January 1968 NATIONALIY: Filipino
PASSPORT NO : EC2410623 DATE OF VALIDITY: 13 Oct. 2019
PLACE OF ISSUE : Manila, Philippines
EDUCATION ATTAINMENT
1984 – 1989 Bachelor of Science in Civil Engineer ( B.S.C.E )
D.H.V.C.A.T Bacolor, Pampanga, Philippines.
Bachelor of Science in Geodetic Engineer ( B.S.G.E )
D.H.V.C.A.T Bacolor, Pampanga, Philippines.
Quantity Surveyor (Civil Construction Estimating)
MicroCADD Technology Quezon City, Philippines.
AutoCad 2000 with Color Rendering (Certificate of Completion)
MicroCADD Technology Quezon City, Philippines.
LICENSURED EXAMINATION UNDER
PROFESSIONAL REGULATION COMMISSION OF THE
PHILIPPINES ( P.R.C )
Registered Civil Engineer of the Philippines
Registered Geodetic Engineer of the Philippines
Member-Assoc. of Philippine Safety Engineer
JOB DESCRIPTION, DUTIES
AND RESPONSIBILITIES
1. Quantity Surveyor (Civil)
2. SAFETY AND QUALITY RESPOSIBILITY.
WORKING EXPERIENCE
( MINIMUM 18 YRS. EXPERIENCE )
DATE / POSITION COMPANY
Quezon Road, San Simon, Pampanga
Mo. No. 0905-1422-992
POSITION CONTRACTOR
2.AUGUST 2009 DESCON ENGINEERING
TO OCTOBER 2014 P.O Box 46821, Abu Dhabi, United Ara,Emirates.
Tel. # 00971-02-555-5807
POSITION SR. QUANTITY SURVOR
3.FEBUARY 2008 ADCC-Joint Venture (Aktor, Al-Darwish
TO MAY 2009 Engineering, Cimolai Construcziones & Cybarco).
P.O Box 9213 Doha, State of Qatar.
Tel. # 00974-256-2888
POSITION QUANTITY SURVEYOR
4.MAY 2005 UP J & P LLC ( Joannou & Paraskevaides
TO FEBRUARY 2008 Group , Building & Civil Engineering Contractor.)
P.O Box 2536, Abu Dhabi, U.A.E
Tel. # 00971-02-622-1533 /
00971-02-883-1500
POSITION QUANTITY SURVEYOR
5.SEPTEMBER 2001 UP ABB Contracting Co. Ltd
TO MARCH 2004 P.O Box 91926, Riyadh 11643,
Kingdom of Saudi Arabia.
Tel. # 00966-01-265-0090 / 265-2396 Fax.# 00966-01-265-2077 C.O.C # 15771
C.R # 1010028640
POSITION QUANTITY SURVEYOR
6.APRIL 1996 UP TO IMAD COMPANY FOR TRADING &
AUGUST 2001 CONTRACTING
P.O Box 677, Al-khobar 31952, Saudi Arabia.
Tel. # 00966-03-864-7562 / 895-3176 / 894-2169
Fax # 00966-03-864-3887
C.R. # 2051014970
POSITION QUANTITY SURVEYOR
7.FEBRUARY 1990 UP TO MOHAMMAD AL-MOJIL GROUP (Construction Division).
MARCH 1996 P.O Box 11, Dammam, Saudi Arabia.
Tel. # 00966-03-842-5079
Fax # 00966-03-842-1111
CR. # 3174
POSITION QUANTITY SURVEYOR
8.APRIL 1989 UP TO PNCC – PHILIPPINE NATIONAL CONSTRUCTION CORPORATION.
JANUARY 1990 Edsa Cor. Reliance St., Mandaluyong,
Metro Manila, Philippines.
Tel. # 0063-2-631-8431
POSITION QUANTITY SURVEYOR
PROJECT ACCOMPLISHMENT
UNDER GLOVBAL INDUSTRIAL AREA. (Quezon Road San Simon, Pampanga)
CONSTRUCTION OF 500 UNIT WAREHOUSES INCLUDING ACCESS ROAD & PERIMETER FENCE.
20 Billion pesos warehouse project. Construction 500 unit warehouses including massive backfilling & excavation, massive masonry & concreting works, massive structural steel fabrication & erection, massive insulation & roofing works, massive drainage & water supply works, access road works plus massive fencing works.
UNDER ADCC-Joint Venture. (Aktor, Al-Darwish Engineering, Cimolai Construcziones & Cybarco)
AIRCRAFT MAINTENANCE HANGAR CP-26 PHASE-26 CONTRACT NO. 002010. (PROJECT MANAGEMENT OF EASTERN BECHTEL LTD., OWNER/CLIENT OF NDIA NEW DOHA INTERNATIONAL AIRPORT DOHA, QATAR).
3 Billion Qatar riyal airport project. Construction of single but biggest & largest aircraft maintenance hangar in the world near shore line, design to accommodate 8 units of super jumbo double Decker airbus A-380 passenger air lines. Construction that includes 2 meters dia. & 1.5 meters dia. massive bore pilling, massive excavation, massive structural reinforce concrete, massive structural steel erection, architectural/finishing works, drainage/water line works, concrete/asphalt road works, mechanical & electrical works.
UNDER AD J & P LLC. (Joannanou & Paraskevaides Group, Building and Civil Engineering Contractor).
OGD-111, ONSHORE GAS DEVELOPMENT PROJECT PHASE-111 CONTRACT NO. 25113.(PROJECT MANAGEMENT OF BECHTEL LTD., OWNER / CLIENT OF GASCO HABSHAN, ABU DHABI, U.A.E).
2.5 billion dollars gas plant project. Construction of gas plant such as structural steel pipe racks, out door foundation, sub-station building, instrument equipment building, control building, office building, villas, pipe laying / installation, electrical cable tray and support, evaporation pond and infrastructure (asphalt road, street lighting, drainage, manhole, duct bank and perimeter fence).
EMIRATES HANGAR, CONSTRUCTION OF 7 UNIT OF AIRCRAFT MAINTENANCE HANGAR PHASE-11, CONTRACT NO. 2006008 (PROJECT MANAGEMENT OF EMIRATES ENGINEERING, OWNER/CLIENT EMIRATES AIRLINE DUBAI, U.A.E)
3.5 billion dirham airport project, Construction 7 unit of aircraft maintenance hangar design to accommodate the maintenance of super jumbo double Decker airbus A-380 passenger air lines. Construction that includes bore pilling, massive excavation, massive structural reinforce concrete, massive structural steel erection, architectural/finishing works, drainage/water line works, asphalt road works, mechanical and electrical works.
UNDER ABB Contacting Company Ltd.
BERRI POWER PLANT 230 KV. POWER SUB-STATION SUPPLY TO
JUBAIL UNITED OLIFIN CHEMICAL PROJECT J.O # 2230501 (PROJECT MANAGEMENT OF FLOUR DANIEL / ARABIA LTD.)
Construction of 230 kilo-volts power supply to Jubail United Petrochemical Co. civil works such as rebar/concreting of 350 out door foundation ( for bus bar ), electrical man-hole, duct banks, 1.5 km. perimeter fence, asphalting of sub-station area, patrol road, perimeter drain channel, evaporation pond and asphalt side slope.
UNDER IMAD COMPANY Trading and Contracting.
EXPANSION OF SEWAGE TREATMENT PLANT SAFWA, CN. # 45836/00 BI/JO # 2789/27890 SAUDI ARABIA, (SAUDI ARAMCO PROJECT).
Construction of 7 reinforce concrete sewage tank with a capacity of 250,000 gallon each and a total of 7,000 cu.m of concrete including structural steel shed, pipe racks and support, street lighting, cable tray and support, asphalting road, under ground utility, embankment slope protection and other.
CLAY FILTER EXPANSION AT NORTH JEDDAH BULK PLANT CN.# 4387/00, BI/JO. 4765/4752 (SAUDI ARAMCO PROJECT).
Construction of structural steel shed with a total of 700 tons of structural steel, 18”dia. and 12”dia. pipe laying, including pipe racks, support for mechanical and electrical.
SECURITY ACCESS UP-GRADE OF RABIGH REFINERY, CN.# 45915/00 BI/JO. 3766/37660 (SAUDI ARAMCO PROJECT).
Construction of reinforce concrete security building, computerized control refinery gates / turn stiles, structural steel space frame, road asphalting and fence monitor around refinery with a total of 15k.m. in length.
BULK PLANT MODERNIZATION PROJECT CN.# 44354/00, BI/JO 3759/37595 YANBU CITY, SAUDI ARABIA ( SAUDI ARAMCO PROJECT )
Modernization and conversion of 18” dia. pipe line in refinery and bulk plant truck loading such as structural steel pipe support/bridge, cable tray support, cantilever traffic light support, structural steel platforms, control building, finishing, including mechanical and electrical.
WEIGH SCALE RELOCATION AT YANBU BULK PLANT PHASE-1, CN.# 44354/00, BI/JO-1900/69276. (SAUDI ARAMCO PROJECT).
Construction of reinforce concrete truck weigh scale and building, duct bank, including mechanical, electrical and other.
UNDRER MOHAMMAD AL-MOJIL GROUP( Construction Division ).
EXPANSION OF GASOLINE STORAGE TANK RASTANURA REFINERY PROJECT, CN.# 47567/, BI/JO. 5567/55671 (SAUDI ARAMCO PROJECT).
Construction of 3 gasoline storage tank with a capacity of 500,000 barrels, reinforce concrete matt foundation, structural steel wall tank, 24”dia. / 18”dia. pipe laying, pipe racks/support, platforms, cable duct bank, cable tray/support, office and control building.
EXPANSION OF OFFSHORE FOR LOADING AND UNLOADING VESSEL RASTANURA REFINERY PROJECT CN. # 48685/00, BI/JO.# 4885/48850 (SAUDI ARAMCO PROJECT).
Construction of 18”dia. and 12”dia. service fuel offshore pipe line, offshore file driving, reinforce concrete pipe support/racks, cable tray support, structural steel service platform and control building.
SULAYIL BULK PLANT PROJECT CN. # 49455/00, BI/JO. 4995/49950,
RIYAD, SAUDI ARABIA (SAUDI ARAMCO PROJECT).
Construction of new bulk plant with a total area of 20 hectare such as fuel storage tank, sub-station, instrument equipment station ( IES ), control station, loading island, structural loading island shed, structural steel pipe rack/support, electrical rack/support, evaporation pond, underground utility ( duct bank ), street lighting, perimeter fence, patrol roads and infrastructure project ( drainage line, water line, manhole, asphalt road, car park, road marking, & weigh scale bridge ).
POWER PLANT RIDADH PROJECT CN.# 88400/01, BI/JO. 8895 RIYADH, SAUDI ARABIA (SEC / ERB PROJECT).
Construction of 350,000 megawatts power plant such as reinforce concrete out door foundation, bore pilling, structural steel building, electric tower, sub- station building, control station building, bust bar, cable tray support/racks, perimeter fence, perimeter drain channel and infrastructure ( asphalt internal road, drainage / water line, duct bank, man-hole, street lighting, road marking land escaping ).
EXPANSION OF CHEMICAL PROCESSING PLANT CN.# 10185-00, BI/JO 1099/10995, YANBU INDUSTRIAL AREA, SAUDI ARABIA ( SABIC PROJECT ).
Construction of 3 chemical storage tank with a capacity of 200,000 barrels each. Reinforce concrete matt foundation, structural steel tank, laying of 18”dia. / 12”dia. pipe, structural steel pipe racks / support, under ground utility ( duct bank, truss block & man-holes ) office building and control building.
CONSTRUCTION OF 150 K.M MOUNTAIN ROAD, TUNNELS AND BRIDGES FROM KHAMIST MUSYAT TO REPUBLIC OF YEMEN
(MINISTRY OF COMMUNICATION PROJECT) SAUDI ARABIA.
Construction of 51 phase of reinforced concrete bridges with a minimum of 150 mts. In length and 21 phase of tunnels on mountain base. Bore piling, installation of pre-cast concrete con-box bridge section, road back filling, mountain slope side cutting by heavy equipment & blasting, road side slope protection, ditches, Irish crossing, man-holes, street lighting, road traffic sign / marking and road asphalting.
UNDER PNCC ( Philippine National Construction Corporation )Edsa Mandaluyong City, Manila, Philippines.
U.S MILITARY BASE IN OLONGAPO CITY, PHILIPPINES (OWNER/CLIENT BY UNITED STATE OF AMERICAN GOVERNMENT).
Construction of airport terminal, aircraft runway, aircraft maintenance hangar, tunnels, underground utilities, monitor tower, asphalt patrol road water/drainage system, electrical and mechanical .
METRO RAIL TRANSIT UNDER PNCC AND HANJIN KOREA JOINT VENTURE
(PHILIPPINE GOVERNMENT PROJECT)
Construction of 20km. metro rail transit along edsa from Quezon city to baklaran including large excavation, bore pilling, basement, passenger station, rebar and concreting (footing & column), installation of pre-cast concrete girders, mechanical and electrical works.