Photo

Jessie Javier Taong Architectural Inspector

Pagsanjan Laguna Philippines

COMPREHENSIVE RESUMÉ

PERSONAL DATA:

 

Name :            Mr. Jessie Javier Taong

Address :         # 21 San Luis Road Brgy. Cabanbanan, Pagsanjan Laguna

Philippines 4008

Mobile # : 09560350948

Email Add:      [email protected]

Position Desired:   QA QC Architectural Inspector / Site Architect

Nationality:      Filpino

Civil Status:     Married

Religion:          Christian

Age:                 45 years old

Sex:                 Male

Specialty:        Architectural Designing & Detailing Using Autocad  Latest  Version

Member:         Saudi Council Of Engineers – 55015

Approved by:   Saudi Aramco – QC Archt”l. / Civil Inspector ( Feb. 21, 2016 )

 

EMPLOYMENT HISTORY:

 

COMPANY:    Saudi Arabian Bemco Contracting Co. Ltd.

P. O. Box 3143, Jeddah 21471, K. S. A.

POSITION:     QA / QC Inspector Architectural / Civil

14 January 2016 To Present

PROJECT:     Jizan Iintergrated Gasiification Combined Cycle Project Package 1 & 2 &

Buildings, Saudi Aramco Project, Economic City Jizan, KSA

Project Cost:   33.5 Million Saudi Riyal

 

DUTIES & RESPONSIBILITIES:

Available on Site during construction to guide for quality requirements.

Conduct internal inspection.

QC Inspector is responsible of his assigned area for Quality Control.

Coordinate with Construction for scheduled inspection and notify in case of delay

and cancellation.

Coordinate with Third Party for his assignment Area Testing.

Issue pro-active Log Book Entry to avoid violation.

Reports all violations to Construction and issue NCR.

Coordinate to Technicas Reunidas ( TR ) for Internal Inspection.

Attend Final Inspection with Tecnicas Reunidas ( TR ) and ARAMCO.

 

COMPANY:    Saudi Arabian Bemco Contracting Co. Ltd.

P. O. Box 3143, Jeddah 21471, K. S. A.

POSITION:     QA / QC Inspector Architectural / Civil

28 April 2014 To 12 January 2016

PROJECT:     Saudi Arabian National Guard Villa Project ( 2500 Units )

Buraida Al Qassim, KSA

 

DUTIES & RESPONSIBILITIES:

Going through all the IFC drawings, approved quality procedure, method statements,

Inspection and testing plan prior to start the project.

Daily coordination with the third party testing laboratory finalize the correct schedule of

testing, at least one day before, to raise inspection request to client.

Preparation and maintaining of all documentations and files related to inspection.

Coordination with third party testing laboratory technicians to arrange daily test and ins-

pection to be witnessed by the client.

Preparation of quality verifying documents ( checklist ) and getting survey report from

survey department ( to be attaché with inspection request ).

Daily Coordination with Client inspector to give the correct schedule of inspection at

least one day before to the client, and also follow-up to get the commented RFI from

the client.

To attend all the inspection or testing with the Client inspector and not to leave the site at

any cost when the client inspector is doing any inspection. And also make sure that the

client inspector brings the original RFi at site and sign immediately after inspection.

Daily coordination with the construction personnel to know the correct schedule of

Inspection, at least one day before to raise inspection request to client after conducting

the internal inspection.

Daily coordination with QC data encoder / Document Controller to prepare the inspection

Request, at least one day before, to submit inspection request to client.

Daily coordination with Site Engineer / Data Encoder to provide the correct status of

Inspection and to re-schedule the inspection ( if any ) or cancelation of inspection.

Daily monitoring and surveillance for all the on going construction activities and record

If found any quality discrepancy.

Coordination with SBG material store department to schedule the internal and client

Inspection when any materials arrived at site stores.

Submitting Daily QC Reports to QC Manager related to QC daily activities, inspections

status ( Updated RFI Summary ) non-conformance etc.

 

 

COMPANY:    Construction & Contracting Enterprises, Ltd. ( CCE )

P. O. Box 250991, Riyadh 11391, K. S. A.

POSITION:     Site Architect / Planning Engineer

20 January  2012 To 27 January 2014

PROJECT:     Information Technology And Communication Complex – Convention Hotel

( ITCC) Package 2

Al Nakheel  P.R. Turki Bin Saud Street Opposite of SASO Bldg. Riyadh KSA

 

DUTIES & RESPONSIBILITIES:

Control the overall construction Supervision of the Project.

Implement the project within the required time, budget and high level of technical quality.

Supervise and monitors the construction on site such as civil, structural and architectural

To ensure that the works is progressing in accordance with the plans, specifications,

budget and quality standard.

Directly engaged in coordinating, consulting and communicating with the Construction

Manager and Project Manager regarding the Status and Progress of the Project.

Attend Construction Meetings to identify possible problems that might occur during the

course of construction and its recommendation for corrective actions.

Prepare daily, weekly and monthly  progress report.

Directly coordinate and monitors the day to day activities of the site construction.

Review drawings and documents analyze change order and cost proposal.

Ensure that all works performed  strictly in accordance with the Approved  Drawings

and Specifications.

 

 

 

 

COMPANY:    Construction & Contracting Enterprises, Ltd. ( CCE )

P. O. Box 250991, Riyadh 11391, K. S. A.

POSITION:     Site Architect  / QA-QC Inspector Archt’l. Finishing

11 Jan 2010 To 19 Jan 2012

PROJECT::    Communication and Information Technology Commision  ( CITC )

Al Nakheel  P.R. Turki Bin Saud Street Opposite of SASO Bldg. Riyadh KSA

 

DUTIES & RESPONSIBILITIES:

Responsible for Site Inspection in accordance with the standard specifications

of Saudi ARAMCO.

Conduct inspection with respect to the Approved Plan for all Architectural & Civil works.

Inspection of CMU wall and Plastering activities in Zone #1, 2, 3 & 4 as per IFC /

approved shop drawing & details.

Monitor concrete placement activities, checking surface preparation, line, level, compac-

tion & finishing tolerance.

Inspection of Gypsum board ( wall / ceiling ) and Acoustical ceiling activities at site.

Preparation of FIR / MIR for inspection submission to Zuhair Fayez ( Consultant ) and

Follow-up for approval.

Check and inspect the Materials stored at site as per Manufacture data sheet.

Check and control Sub-contractor activities.

Report  to QA/QC Manager for non – conformities.

Action on MKA Reports and assist QA/QC Manager for closing the same.

Coordinate with Electro-Mechanical discipline.

Review approved Technical Queries (TQ) for any modification and changes.

Monitor FIR log.

 

COMPANY:    Al Rafidain Co. (  RAFCO ) W.L.L.

Old Al Rayyan Road, P.O. Box 831, Doha Qatar

POSITION:     Project  Architect  / Coordinator

May 31, 2007 To October 25, 2010

PROJECT:     Qatar Foundation, Education City

International Bank of Qatar, Head Office

Doha Islamic Bank, Salwa Road

Singapore Embassy, West Bay

Alfardan Twin Tower, City Center

Barclays Bank, Qatar Financial Centre

Qatar Petroleum, Al Maha Complex

GHD Clients People Performance

City Plaza Building, al Sadd

 

DUTIES AND RESPONSIBILITIES:

Make site verification and measurement on actual site conditionon the given project.

Directly engaged in coordinating with the Project  Manager / Owner to the Project

undertaking.

Responsible in preparation / checking of shop drawings needed  for execution of the

work.

Control site supervision activities provision related to the Architectural works.

Prepares project schedule of materials take-off .

Supervised actual construction of the work discipline.

Supervises execution of daily work activities and ensure within the plan and specification

Prepares accomplishment reports.

Perform other duties that may required.

 

COMPANY:    SKI Construction Group Inc.

17F Philamlife Tower, 8767 Paseo de Roxas, Makati City

PROJECT:     Trinoma Mall / North Triangle Commercial Center

Edsa / North Avenue, Quezon City, Philippines

POSITION:     Archt’l. Field Engineer

November 2005 To May 28, 2007

 

GEN. JOB FUNCTION:

The position typically reports to the Construction Superintendent. Directly responsible for

the actual supervision of construction of civil / architectural / structural and earthworks.

 

DUTIES AND RESPONSIBILITIES:

Reviews plans, specifications and other project documents.

Supervised actual construction of the work discilpline assigned, such as Civil /

Architectural / Mechanical etc.

Directly engaged in coordinating, consulting and communicating with the Project

Consultant to the project undertaking.

Assist Foreman and other employees or personel  in technical aspect of work.

Oversees proper implementation of plans and deals with the subcontractors activities.

Prepares accomplishment reports.

Monitors manpower and equipment status.

Observes and maintains safety procedures on site.

Prepares project Schedule of materials take-off.

Supervises execution of daily work activities and ensure within the plan and specification

Participate in the implementation of the Organization’s Environmental, Occupational

Health and Safety Program.

Performs other duties that may assigned from time to time.

 

POSITION:     Proj. Quantity Survey Engineer / Designer

April 2005 To October 2005

GEN. JOB FUNCTION:

The position typically reports to the Office Engineer. Directly responsible for quantity

surveying. Also responsible for the coordination with the various suppliers pertaining

to delivery of materials, inspects delivered materials in conformance to approved

submittals and inspection.

 

DUTIES AND RESPONSIBILITIES:

Quantity Surveying.

Preparation of cost proposals for various change order.

Coordination with central purchasing regarding material requisition to be used in the proj.

Coordinating wit the different suppliers regarding the delivery of materials.

Inspection of materials delivered on site in conformance to approved submittals

and inspection.

Conduct attends site visits to different plants.

Assign cost code to materials request.

Coordinates with field supervisors regarding materials needed for their works schedule.

Prepares evaluation of billing of different subcontractor and suppliers.

Sourcing of other to ensure continous supply of materials on site.

Prepares evaluation of cost proposals for cost control.

Monitors incoming / outgoing documents for proper coordination to all nominated /

direct subcontractor.

 

COMPANY:    Jeff James Incorporated

Fabricator of Quality Architectural & Industrial Stainless Steel Products

Fuentes Compound Darangan Binangona Rizal, Philippines

POSITION:     Project Coordinator / Archt’l. Autocadd Designer

October 2002 to April 2005

JOB DESCRIPTION:

Responsible in preparation  / checking of shopdrawing needed for the execution of work.

Direct communication / contact to client regarding on project to signed and approved

by the owner.

Make site verification and measurement base on actual site condition on the given proj.

Make final shopdrawings  to be signed and approved by the client / owner.

Make ridings, cutting list and materials checklist on the given approved project to be

brought down to production for fabrication.

Make Sure that all the specification are followed on the materials checklist and

checking the quality of workmanship.

To deliver quality installations accordance with the contract documents & requirements.

Constant monitoring and inspection on production up to installation works.

 

 

 

COMPANY:    Sta. Clara De Montefalco Parish

C. Raymundo Avenue / Mercedes Avenue

Barangay Caniogan, Pasig City, Philippines

POSITION:     Project Architect  / Designer

January 2001 to October 2002

JOB DESCRIPTION:

Responsible in preparation of complete shopdrawings for Architectural & Stuctural detail.

Perform autocadd works from preliminary, spot details to final plans / drawings.

Responsible for checking and supervision in accordance with plans prepared by the

Architects and Engineer.

Coordination with proper personel for the evaluation and deliveration pertaining to

quantities derived for control and monitoring.

Organised and set meetings with the Design Architect, Structural Engineer & The Parish.

Direct reporting to the Parish Priest regarding the accomplishment, status reports,

existing problems and recommending solutions.

 

 

COMPANY:    Cityville Industrial Developer Inc.

Rm. 604 Medalla Building Mc. Arthur Avenue / Edsa Cubao Q.C. Philippines

POSITION:     Project Architect  / Designer

January 1999 to December 2000

JOB DESCRIPTION:

Preparation of As-Stake Plans for evaluation and refinement of design.

Delegation of other Technical  Engineers for other shopdrawing to them.

Monitor site conditions and actuations and make necessary adjustment and more.

Refinement of drawings / designs and quantity involve or charges which Consultant.

Coordinate with the various Operation personnel for Quality Control and Monitoring.

Monitor performance of the Contractor / Subcontractor.

Assisted in the billing and progress reports preparation.

Prepared attachment of drawings and computation for justification and  for checking.

Planning and involved in the preparation of work schedules.

Performed other duties that may be required.

 

 

COMPANY:    Ayala Alabang Village Association ( AAVA )

Narra St. Ayala Alabang Village, Muntinlupa City, Philippines

POSITION:     Plans Construction Monitoring Inspector

October 1995 to April 1998

JOB DESCRIPTION:

Implementation of AAVA Deeds Restriction, rules, regulation and other per-construction

Requirement. Compliance monitoring of approved plans and building construction by the

Homeowner / builder in the village accordingly.

 

DUTIES & RESPONSIBILITIES:

To conduct regular field monitoring inspection of finished houses and under construction

( new, renovation, repair, landscape etc.) within the designated area of phase 1, phase

2A & 2B, phase 8A, 8B & 8C.

To monitoring the cleanliness and restoration of common area property, vacant lot,

utilities, and existing trees along palanting strip.

To check permits for construction mobilization, usage of vacant lot & common property,

canteen and tapping of utilities.

To receive and check the complete set of building plans for approval in accordance

with AAVA deeds restrictions, rules and regulation prior to the release of approved

plan copy of owner & contractor.

To keep updated field / status reports, records and other documents pertaining to house

constructions.

To attend inquiries, complains of the homeowner / builder etc. and undertake necessary

action / solution on the assigned phases.

To make assessment  fees for the construction permit ( bond deposit ) canteen permit,

fine / penalties & other charges.

To process the computation and prepare the RCP ( request  for check preparation ) for

Refund of construction & canteen bond deposit on the assigned  phases.

To keep safe and use properly the assigned vehicle ( Nissan Sunny Pick-up CJC-224 ),

Equipment ( hand held radio ), Drafting instrument, office supplies etc provided by AAVA

To render Drafting works and Design execution for premilinary and final presentation

and other services from time to time as may needed.

 

 

COMPANY:    Extensive Woodworking Inc.

Km. 15 Dalandanan Valenzuela, Bulacan, Philippines

POSITION:     Architectural Designer / Coordinator

June 1993 to October 1995

JOB DESCRIPTION:

Responsible in the preparation of complete  Shopdrawings for Architectural plans &

details. As Job-Captain it is my duty to supervise our workers and to sure the systematic

and orderly flow of activities. Monitoring, checking and inspection.

 

EDUCATIONAL ATTAINMENT:

 

COLLEGE:     Technological Institute Of The Philippines                       1998 – 1993

20th Avenue Cubao, Quezon City

COURSE:       B. S. ARCHITECTURE

SEMINAR & TRAINING ATTENDED:

( MIESCOR ) Meralco Industrial Engineering Corporation

Philippine Nuclear Power Plant, Napot Point, Morong Bataan

Safety Leadership Training ( Philippines )

Upgrading knowledge in Welding Connection ( Non-Destructive Testing )

 

Autocadd Release 14 – September to December 1998

Microcadd Technologies Company, 5th flr. Dona Consolacion Building

602 General Santos Street, Cubao Quezon City

 

Autocadd Release 13 – June to August 1997

Interface Computer College,Ground Floor SM Southmall

Zapote Alabang Road, Las Pinas City

 

Philippine Institute of Architects ( P. I. A. )

Corporate Member – June 1993 to Present

59-A East Drive Barrio Capitolyo, Pasig City

 

Society of Junior Architect ( S. J. A. )

Member – August 1998 to January 1993, T. I. P. Q.C. Chapter

 

 

_________________________________

MR. JESSIE JAVIER TAONG

SSS No. 33-1978198-1

TIN No. 192-729-674