DETAILED WORK EXPERIENCE:
YANBU ARAMCO SINOPEC Refining Co. (YASREF) Position: MECHANICAL MAINT. CRAFT SUPERVISOR
P.O. Box 32223, YANBU Industrial City 41912 KSA Department: Maintenance Dept. Gasoline Complex
April 2014 – October 2017 Utilities & SRU Division
Company Profile: Production of Petroleum Products
Type: Permanent Employment
RESPONSIBILITIES:
Ø Leads in schedules and directs activities of assigned personnel engaged in rotating equipment maintenance work in Supervises various maintenance, testing & overhauling jobs on rotating equipment & auxiliaries; such as. Pumps, compressors, turbines, blowers, fin-fans, mixers, etc.
Ø Typical operations include dismantling of rotating equipment, inspecting internals, assessing equipment condition for parts replacement / repair, reassembling & test-checking.
Ø Investigates cases of inadequate performance & repetitive malfunction of rotating equipment & auxiliaries; consults with operating personnel on problems related to rotating equipment; and recommends solutions/improvements.
Ø Also, inspects critical rotating equipment; such as, centrifugal, reciprocating compressors, turbines, feed pumps, gas engines, etc. and ensures their trouble free operations.
Ø Assumes full responsibility for the role as envisaged by Safety, Health Environment Management System (SHEMS).
Ø Ensures proper implementation of work procedures & standards. Also, initiates requisitions for spares & materials required of rotating equipment maintenance jobs; and ensure their economical utilization. Ensures routine maintenance of equipment & tools.
Ø Lead the installation, fabrication, repair, cleaning and testing of a wide range of stationary equipment in the plant, such as heat exchangers, columns, vessels, reactors, boilers and furnaces, static reformers, tanks and associated pipe work systems etc. Includes monitoring work execution and providing guidance to ensure conformity to statutory and company regulations and adopting practices commensurate with The Company’s HSE manual.
Ø Provides work direction to assigned Contractors’ Fabrication Technicians involved in the fabrication activities in the fabrication workshop, repair of static equipment in the assigned Plant area. Raises report of all activities referring particularly to resources, specific tools, details of materials and spares required to carry out the works.
Ø Participate in the planning for the execution of major equipment turnaround or shutdowns. Prepare work list, reviews requests from operations or technical services personnel and assists in the development of an overall work plan for the shutdown.
Ø Participate in the testing and startup of repaired equipment.
Ø Assists in the receipt of the materials and spare part through the onsite inspection of delivered materials and may, as necessary, check the system operation of alternatively supplied spare parts. Provide written reports on materials not acceptable
Ø Close PM and CM Work Orders in SAP Maintenance Management.
___________________________________________________________________
RMP-2 Petron Oil Refinery Project Position: PIPING SUPERVISOR – GOHT, NHT & HPU
DAELIM Philippines Inc. LIMAY, Bataan Department: Construction Department
November 2012 – January 2014 Company Profile: EPC of Oil & Gas Refinery Type: Contract Employment
RESPONSIBILITIES:
Ø Supply of information to the Sung Do the Sub-Contractor on the main design principles of the facilities and works and the issue methodology of the technical documentation.
Ø Supply of all technical information and clarifications to the Contractors.
Ø Supply to the Contractors of all comments to secure the correct installation of equipment.
Ø Checking that the Contractors are using the valid revision index of technical documents and eventual supply of any missing revision.
Ø Checking that any new technical document or any revision is issued to the Contractors.
Ø Participation to Weekly coordination meetings with the Contractors
Ø Review and approval of Contractor’s submitted documents.
Ø Request from the Contractors to supply red marked-ups or as-built documents upon the completion of
Any works.
Ø Checking of the conformity of construction versus the technical documentation (drawings, technical
and standard.
Ø Participation to safety on site like Tool Box meetings.
Ø Review test packs and Supervision of testing.
Ø Checking line & prepare punch lists for balance materials not installed and close punch lists after the work has been done, follow up material needed in the Warehouse.
Ø Monitor Hydro testing activities and check Test Pack for all lines and coordinate with the contractor to minimize delay of work.
Ø Review 3D Model using NAVIS for location and connection of Piping to Equipment.
Ø Prepare Manpower reports and Progress reports for Piping in Pipe rack and Equipment.
____________________________________________________________________
(LIS)-TECHNIP/HATCH- KNS Mining Project Position: PIPING SUPERVISOR – AREA 500
Siege de KONE BP 679-98860 KONE Department: Construction Department
Nouvelle CALEDONIE (New Caledonia) Company Profile: Nickel Mining
November 2011 to June 2012 Type: Contract Employment
RESPONSIBILITIES:
Ø Monitor daily activities of McDowell/McConnell the Sub Contractor for A/G Piping Installation.
Ø Review 3D Model using Bentley Navigator for location and connection of piping to Equipment.
Ø Prepare Manpower reports and Progress reports for Piping Installation in Diesel Storage Tanks, Diesel Day Tanks, Treated Fuel Tanks, Firewater and Potable Tanks.
Ø Supply of information to the Contractors on the main design principles of the facilities and works and the issue methodology of the technical documentation.
Ø Supply of all technical information and clarifications to the Contractors.
Ø Supply to the Contractors of all comments to secure the correct installation of equipment.
Ø Checking that the Contractors are using the valid revision index of technical documents and eventual supply of any missing revision.
Ø Checking that any new technical document or any revision is issued to the Contractors.
Ø Information to the Contractors on the obligation to get the approval of Field Engineering through a
Concession Request (CRQ) for any deviation to a project procedure, a technical specification, an IFC Drawing.
Ø Participation to Weekly coordination meetings with the Contractors.
Ø Review and approval of Contractor’s submitted documents.
Ø Request the Contractors to supply red marked-ups or as-built documents upon the completion of
any works.
Ø Checking of the conformity of construction versus the technical documentation like Method of Statement, Drawings, Job Safety Analysis.
Ø Participate in Tool Box Meetings.
Ø Participate in HSE awareness like DSTI, Observation Cards and Safety Walk.
Ø Participate in Line checking for Prepare punch lists for balance materials not installed and close punch lists after the work has been done, follow up material needed in the Warehouse.
Ø Monitor test package activities and check Test Pack for all lines and coordinate with the contractor to minimize delay of work.
(LIS)-TECHNIP/HATCH- KNS Mining Project Position: WORK PACK COORDINATOR – AREA 400
Siege de Kone BP 679-98860 KONE Department: Construction Department
Nouvelle Caledonie (New Caledonia) Company Profile: Design, Engineering & Construction
November 2010 to November 2011 Type: Contract Employment
RESPONSIBILITIES:
Ø Reporting to the Deputy Construction Manager, the CWP Coordinator is responsible for the development and release of Construction Work Packages (CWP’s).
Ø Work in close cooperation with Construction Superintendents and the Lead Planner, but will also be required to coordinate with staff from area’s including Safety, Contracts, Material Control and Engineering, in order to ensure readiness of CWP’s.
Ø Implement system to release, maintain and close-out CWP’s and related information. Ensure CWP system reflects the most recent schedule, and quantity information.
Ø Check in MARIAN system the Material PO Nos. Commodity Code, Identity Code, ETA, Coordinate with Material Coordinator to anticipate material needs in construction daily activities and in 3 months look ahead schedules.
Ø Plan the dependencies of CWP’s to ensure logical and practical release of work. Coordinate with engineering team to ensure battery limits of IFC drawings and MTO’s coincide with CWP structure.
Ø Produce CWP’s with input from Construction and Engineering personnel, providing all information required to execute construction.
Ø Plan and carry out regular readiness checks to identify incomplete items, and follow up actions to ensure delays to release of CWP’s are minimized.
Ø Facilitate and document release of CWP’s to Superintendents and Contractors, Check Method of Statement and Job Safety Analysis. Review 3D Model using Bentley Navigator to verify PDS-Pipe, Line No. and PDS-Equipment.
Ø Provide regular detailed reporting of CWP document progress, and CWP construction progress. Coordinate and document closeout of CWP’s, ensuring works has been done and all items closed out prior to accepting completed works from Contractor.
Ø Work closely with pre-commissioning team to understand limits of construction scope in terms of testing and completion, and ensure these scope boundaries are clearly identified in CWP.
___________________________________________________________________
SHARQ Eastern Petrochemical Co.
P.O Box 10035 JUBAIL Industrial City 31961 KSA
April 2009 to July 2010
Position: TURNAROUND MAINTENANCE PLANNING ENGINEER
Department: Maintenance Support Division
Company Profile: Processing and Production of HDPE, HHDPE,
LDPE, LLDPE
Type: Contract Employment
RESPONSIBILITIES:
Ø Coordination and communication among Operation, Maintenance, Site Support (Engineering), SMO, Warehouse, and store as required maintaining Plant Maintenance Master Data for Ethylene Glycol Plant.
Ø Maintain Plant maintenance master data such as Functional Location Structures, Equipment Records, Bill of Material (BOM), Task list etc.
Ø List down the new notifications using SAP. Verify Database to be presented in the meeting.
Ø Leading meeting & discussing all jobs in detail with Operation, Maintenance Supervisors and Inspection Engineers.
Ø Take the status of corrective & PM jobs as per schedule. Discuss the emergency raised by Operation, inform jobs differed due to emergency.
Ø Convert the new notification into order arrange resources. Plan jobs according to availability of resources, schedule and re-schedule all the planner jobs.
Ø Visit Plant job locations and assess job content in terms of craft requirement safety and environment hazard potential identification.
Ø Identify non-availability resources and create PR for the direct charge material and services.
Ø Discussing the Technical aspects with Engineers and Supervisors by referring manuals, drawing and walk through and prepare scope of work.
Ø Follow-up on ETA of direct charge material, Services and coordinate for expedite P.O. Coordinate for meeting with Vendors and Contractors.
Ø Describing in detail the scope of work and job plans, inspection requirement, safety procedures, waste disposal procedures and specialized craft requirement to contractors.
Ø Check Operation confirmations in SAP on daily basis and take measures to identify operation which are differing from the schedule, operation differed have to be re-schedule to actual.
Ø Write Technical reports, retrieve and compile Maintenance reports from the SAP system, analyze Maintenance performance indicators, Update weekly report in weekly basis.
______________________________________________________________
TOTAL E and P
AKPO Project
Office HHI – Offshore Div.
1, Jeonha-Dong, Dong – Gu
Ulsan, South Korea 682-792
Feb. 2008 to Feb. 2009
TOTAL E & P Indonesia
TUNU Project
Jl. Yos Sudarso, Balikpapan 76123
East Kalimantan – Indonesia
Feb. 2007 to Feb. 2008
Position: PROJECT ENGINEER
Department: PMT
Company Profile: Fabrication of Platforms
Type: Contract Employment
Position: PROJECT ENGINEER
Department: PMT
Company Profile: Fabrication of Platforms
Type: Contract Employment
RESPONSIBILITIES:
Ø Review 3D Model using SPR and check in PDMS, extract isometric drawings imported to AutoCAD 2005, and extract BOM to MARIAN. Check for clashing between Piping and Structures in SPR.
Ø Check Quantity of Piping and Structures in Packing Lists. Verify the Piping and Structures Material Specs.
Ø Check Pipe Spooling Drawing for Fabrication and use Spool Gen V5 and import to AutoCAD and edit. Check Intermediate Data File (IDF), report any fault in the design to Project Manager. Check Isometric Drawing and Connection Details of Structures and edit by means ACAD 2006. Verify the Line Material Class and Line Design Data were correct.
Ø Using MARIAN System check Material Specification, Material codes available in Warehouse.
Ø Be responsible for project and construction activities as directed by the Topsides Fabrication Manager including the engineering change management process and tracking of key deliverables to the contractor.
Ø To participate in and support HSE initiatives across TOTAL E & P Subcontractor teams to ensure cultural alignment and best possible HSE outcomes.
Ø Assist with monitoring the compliance to the Fabrication Contract and TOTAL E & P Project Division Procedures (where applicable), escalating and participating in the resolution of issues with the nominated contractors, suppliers, TOTAL E & P Project staff.
Ø Provide input into regular Project Control Estimate and Schedule updates.
Ø Participate in the decision making process to ensure problems and issues are resolved expeditiously and intervene when required to ensure the required standards are achieved and outcomes are to the mutual satisfaction of both parties (contractors and TOTAL E & P).
Ø Participation in and coordination of formal engineering reviews and assessments.
Ø Assist with monitoring the Subcontractor contractors to ensure that they are performing their activities in accordance with the requirements of the contract. This will include developing a strong working relationship with the contractor to ensure all project targets are met and the design change process is strictly adhered to.
Ø Participate in the review, monitoring and audit all fabrication and construction activities to ensure Subcontractor work are in accordance with the project specification and contract requirements.
Ø Monitor contractor monthly construction progress is in line with the actual work done and against progress claims.
Ø Assist in Variation Orders management through change order procedure developed for the project.
Ø Coordinate contractors to ensure all Mechanical Completion and Commissioning works are completed prior to handover to Operations.
Ø Prepare the input to the weekly and monthly reports to ensure accurate reporting to Fabrication. Assist in the project
through proper risk management techniques.
ABV ROCK GROUP KB (Swedish Co.)
Site 6 ABHA /Site 7 MADINAH KSA
Kingdom of Saudi Arabia
May 2001 to Dec. 2006
Position: PIPING DESIGN ENGINEER
Department: Engineering
Company: EPC of Biggest Tunnel Project of Oil Storage Facilities for SAUDI ARAMCO
Type: Contract Employment (1yr Renewable)
RESPONSIBILITIES:
Ø Review specifications Process Data Sheets, Piping Material Specifications (PMS), Piping & Instrumentation Diagrams (P&ID’s), Plot plans, General Arrangement (GA) drawings.
Ø Verify plant layout, stress analysis, isometrics, BOM, capacity, pressure requirements and other requirements.
Ø Check the preparation of piping layout and design; obtain inputs from other engineering disciplines through the document, i.e. mechanical data sheets, foundation sizing, equipment layout, instrument specifications and other necessary data. Guide the preparation of pipe wall thickness calculations and Reinforcement Pad (RP) calculations.
Ø Preparation and evaluation of plot plans, engineering drawings and technical documents issued for Internal Design Checks (IDC’s) and the integration of other engineering discipline data inputs.
Ø Evaluate Outline Drawings, Quality Control Dossiers for equipment delivered.
Ø Review and Check the article numbers, quantity, size, model, part numbers and tag numbers of permanent material.
Ø Edit Piping Design Softcopy from Foster and Wheeler by ACAD 2000 and 2003 According to Design Changes.
Ø Review each Unit Area by using Smart Plant Review and separate process line, utilities and firewater lines.
Ø Check P&ID for any design change. Perform inspection regarding the material specification of pipes to be installed according to service.
Ø Review Equipment Data Sheets and sent back to Vendors if there’s any missing data that is required in Commissioning and resolve any Supplier Design Data differ between Foster and Wheeler.
Ø Check & Evaluate all Bulk Material or Equipment Purchase Order in Accordance to Technical Procurement Specification (TPS).
Ø Preparation/review of engineering deliverables, fabrication interface, progress monitoring, interface with client and other departments including quality assurance/quality control.
Ø Technical Coordination with the designers in preparation of detailed piping calculations, and drawings which conforms to applicable specifications and codes.
Ø Review the Technical Procurement Specification or TPS, if equipment delivered is in correct design and specification.
______________________________________________________________
BPCORP./KVAERNER ENGINEERING/MAINTENANCE
PPDC MARIVELES, Bataan Philippines
April 1997 to April 2001
Position: MAINTENANCE ENGINEER
Department: KVAERNER of UK Maintenance Alliance
Company Profile: Petrochemical Plant (Polyethylene)
Type: Permanent Employment
RESPONSIBILITIES:
Ø Responsible in monitoring to all rotating equipment such as Pump, Turbine, Air Compressors, Blowers and other process equipment for Preventive Maintenance.
Ø Responsible for Overhauling of Control Valves, Cleaning of Vessels, Columns, Heat Exchangers, Ejectors, Reactor Cleaning, Boiler and other mechanical equipment for preventive maintenance.
Ø Attend maintenance department meetings on weekly and monthly schedule. Direct reporting to maintenance superintendents regarding equipment status spare parts availability, equipment breakdown and other documentation reports as per ISO 9002 standards requirements.
Ø Evaluate the flow of operation by checking production results, inform subordinates, and report equipment breakdown. Implement procedures and work instructions and improvement on tools management.
Ø Monitor overhauling, assemble and disassemble of rotating equipment and brought to workshop for repair. Coordinate with workshop supervisor for troubleshoot and replacement of defective spare parts.
Ø Assist a group of mechanical technicians in reinstallation of pumps and motor, turbines, blowers, compressors and other rotating equipment.
Ø Coordinate with spare parts store, verify replacement of parts if available, if not, give the size, model, part number and specification to purchasing department to issue purchase order for the needed parts.
Ø Check and monitor alignment of pumps and motor, compressors and turbines, perform line checking from suction and discharge nozzles to the other end.
Ø Check internal of Columns, Vessels, Reactors, Tanks, Heat Exchangers, Pre-heaters together with BPC Operation for Corrosion.
Ø Assist JGC Commissioning Engineer in preparing water tube boiler for Hydrazine boiling out check all instruments installed as per P & ID, check for leaks during Pressure Test. Test run Induced Draft Fan as per required air intake, set Pressure Relief Valve at its required pop up pressure.
Ø Assist turbine and instrument air compressor vendor for initial starting, check alignment of turbine to air compressor. Start turbine test run according to Operation and Maintenance Instruction Manuals. Check Local Control Panel if all operating system are working properly.
______________________________________________________________
M. AL-MOJIL GROUP(MMG)
P.O. Box 11, DAMMAM 31411, K.S.A.
January 1995 to March 1997
Position : ENGINEER (Mechanical & Piping)
Dept. : Engineering Department
Company : EPC of Oil & Gas Refinery
Project : RAS TANURA ARAMCO Upgrade 1, Saudi Arabia
Type : Contract Employment (1yr Renewable)
RESPONSIBILITIES:
Ø Check all Piping Plot Plan drawings, Isometric drawings, report any discrepancies to BUGSHAN STONE and WEBSTER our client. Verify that the engineering design meets the intent application of ARAMCO specification and standards.
Ø Review field change order for additional works, and prepare cost estimate of materials, labor, equipment, and consumables.
Ø Review Weld Maps, Shop Welds, Field Welds, Joint number on Isometric Drawings, Review Mechanical Installation Drawings.
Ø Perform Design Change Layout for Pipes by means of CAD Rel.12 check Pipe standards and Line Specification for client approval.
Ø Review Equipment Plan drawings and Crane position, Check Assembly Drawings and verify in Warehouse Yard.
Ø Monitor installation of pipes and equipment at site, coordinate with piping foreman for daily activities. Assist Supervisor to implement ARAMCO standards like SAES and SAMSS.
Ø Prepare a detail flushing and Test Diagram on P & ID for installed process lines. Coordinate with supervisors and for implementation.
M. AL-MOJIL GROUP(MMG)
P.O. Box 11, DAMMAM 31411, K.S.A.
June 1992 to December 1994
Position : ENGINEER (Mechanical & Piping)
Dept. : Engineering Department
Company : Engineering and Construction
Project : Arabian Extra Light ABQAIQ, ARAMCO
Type : Contract Employment (1yr Renewable)
RESPONSIBILITIES:
Ø Review tender bid documents and drawings, works plan to determine with contracts requirements and scope of work for projects to be estimate. Prepare quantity material take off, as per given piping and equipment drawings. Call supplier for unit cost of each material. Estimate total man-hours for the project, labor cost, and equipment cost.
Ø Check all Issued for Construction drawings, report any discrepancies to ACEC Design Team. Verify that the engineering design meets the intent application of ARAMCO specification and standards.
Ø Review Design Change Notice for additional works, and prepare cost estimate of materials, labor, equipment, and consumables.
Ø Review Weld Maps, Shop Welds, Field Welds, Joint number on Isometric Drawings, Review Mechanical Installation Drawings.
Ø Mark-up P & ID for as-built drawing. Perform inspection regarding the material specification of all pipes that will be installed and provide report to be submitted to our client.
Ø Monitor installation of pipes and equipment at site, coordinate with piping foreman for daily activities.
Ø Review Equipment Plan drawings and Crane position, Check Assembly Drawings and verify in Warehouse Yard.
Ø Assist Supervisor to implement ARAMCO project standards like SAES and SAMSS.
Ø Prepare a detail Flushing and Pressure Test diagram on P & ID for implementation, coordinate with Supervisors.
______________________________________________________________
ENGINEERING EQUIPMENT INC.
LIBIS, Quezon City, Philippines
August 1988 to June 1992
Position: SR. COST & ESTIMATE ENGINEER
Department: Engineering Department
Company: EPC of Oil and Gas Refinery
Project: CCRU and SRU at PETRON Bataan Refinery
Upgrade, Philippines
Type: Permanent Employment
RESPONSIBILITIES:
Ø Review the ITB (Invitation to Bid) documents submitted in the proposals stage, issue inquiry requisitions, review techno-commercial vendor offers, prepare equipment, material and man-hour estimates.
Ø Review contract requirements for project execution , identify requirements and scope of work; review specifications Process Data Sheets (PDS), Piping Material Specifications (PMS), Piping & Instrumentation Diagrams (P&ID’s), Plot plans, General Arrangement (GA) drawings.
Ø Verify scope of work, budgeted man hours, quantities, total of deliverable and format of delivery, time schedules, plant layout, stress analysis, isometrics, and bill of materials, capacity, pressure requirements and other requirements.
Ø Monitor and control project Man-hour requirements during project progress, identify variations between Contract and proposal. Take corrective action as necessary. Create Manpower charts for task assignments, establish target completion dates, and ensure target dates are achieved. Maintain project schedules, ensure allotted man hours, deadlines and cost requirements are strictly adhered to. Recommend cost effective measures to reduce overall package costs.
Ø Coordinate material take off (MTO) activities, identify irregularities, discrepancies and shortfalls take corrective action as required. Administer the preparation of Purchase Requisitions for the procurement of equipment and materials. Review vendor quality plans, ensure vendor equipment’s compatibility and compliance with the scope of client specifications. Coordinate with procurement, ascertain expedite of materials and equipment to site.
Ø Interface and regularly meet with client and vendor representatives, conduct internal staff meetings, ensure the progress of project in accordance to schedule, allotted man hours and budgeted costs. Coordinate with projects and planning departments on schedule related issues.
Ø Check all construction drawings and mark any comments, report any fault in the design to Japan Gas Corporation (JGC) our client. Verify that the engineering design meets the intent application of specification and standards.
Ø Review field change order for additional works, and prepare cost estimate of materials, labor, equipment, and consumables.
Ø Evaluate and resolve engineering problems as they arise. Perform detailed engineering studies as required, oversees collection of as built data and drawings.
Ø Mark-up P & ID for as-built drawing. Perform inspection regarding the material specification of all pipes that will be installed and provide report to be submitted to our client.
Ø Monitor installation of pipes and equipment at site, coordinate with Piping Superintendent for daily activities. Assist supervisor and foreman to implement project standards and material specification.
EDUCATIONINFORMATION
COURSE COMPLETED : BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING (5 Yrs. Course) Graduated on October 1987
COLLEGE SCHOOL NAME : TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES Manila City, Philippines
TRAINING & SEMINARS
MENTOR CERTIFICATION PROGRAM WORK PERMIT PROCEDURE
Conducted by: YASREF Training & Development Division Conducted by: YASREF Training & Development Division
YANBU Technical Institute YANBU Technical Institute
Dates: March 20 to 24, 2016 Dates: March 26-27, 2016
CONSTRUCTION SAFETY INDOCRINATION PROGRAM YASREF SPF EDDMS VIEWER COURSE
Conducted by: LABSPEAK Safety Management Inc. Conducted by: ATHEEB Integraph
DAELIM Training Center Alangan Limay, Bataan at RMP2 Site YANBU Training and Development Division
Dates: January 25, 2013 Date : August 27, 2014
CONSTRUCTION SAFETY LEADERSHIP PROGRAM MECHANICAL SEAL TECH FROM BURGMANN
Conducted by: Koniambo HSE Department Bataan Polyethylene Corporation
Room Type Z Vavouto Camp Kone, New Caledonia PPDC Complex Batangas II, Mariveles Philippines
Dates: July 20, 21 & 22, 2012 Dates: December 12, 2000
SAFETY INDUCTION COURSE
ABV Rock Group KB
Site 6 & 7, Abha & Medina Kingdom of Saudi Arabia
Dates : May 28, 2001 and October 14, 2003
BASIC SAFETY SUPERVISORY COURSE
Conducted by Loss Prevention Dept. MMG & ARAMCO
Dates : May 28 – June 04, 1993
HSE AWARENESS WORKSHOP
Conducted by Bataan Polyethylene Corporation
PPDC Complex Batangas II, Mariveles, Philippines
Dates : March 06 to 10, 2000
PERT/CRITICAL PATH METHOD
Conducted by Engineering Equipment Inc.
Mangahan Street Libis Quezon City, Philippines
Dates : March 25 to 27, 1992
INTEGRATED ENGINEERS DEVELOPMENT PROGRAM
Conducted by: Engineering Equipment Inc.
Mangahan Street Libis, Quezon City, Philippines
Dates : April 02 to September 02, 1990