Photo

nerissa mayubay magsombol SeniorExecutive Quantity Surveyor cum Contract NERISSA MAYUBAY MAGSOMBOL, BSc CE, AssocPICQS, AIQS(Affil.), AssocRICS

Singapore
CASH FLOWClaims ManagementConstruction technology and Environmental ServicesContract AdministrationContract ManagementContract PracticeCost EstimateCost ManagementDesign economics and cost planningFinal Account and Close-out ReportInterim Payment and Change ManagementProcurement and TenderingProject Financial Control and ReportingProvisional & PC Sum)Quantification and Costing of Construction WorksQuantity Surveying Skills: Commercial Management of ConstructionValue Engineering/Valuing Change (Variation and Change Orders

NERISSA MAYUBAY MAGSOMBOL, BSc CE, AssocPICQS, AIQS(Affil.), AssocRICS

Address:                        Block 286a, Toh Guan Road, Singapore, 601286

Email:                            [email protected]

Mobile                           +65 8817 2183

Linkedin:                       https://www.linkedin.com/in/nerissa-m-1352b9105

Skype ID:                      rizzamay_2183

Passport:                        P4546510A

S-Pass:                          G5343070N

Birthdate:                       14-05-1983

Summary

·       A graduate in Bachelor of Science in Civil Engineering.

·       Having 14 years of experience in the construction industry particularly in day to day construction activities.

·       With more than 12 years of Quantity Surveying experience, from Design, Engineering and Construction Companies and Civil Engineering Contractors.

·       Projects handled in ranges of Residential & Commercial Buildings and Offices, Shopping Malls, Retails & Entertainments, Tunnels & Railways, Petrochemical Plant, Advanced Technology Facilities, Life Sciences & Chemicals, Semiconductors, Data Centers & Regional Specific Business, Cleanroom Technologies & Controlled Environments, Restaurants, HDB’s, Condominiums, Offices with respect to Civil, Structural, Architectural, Interior Design and Fit-outs, Mechanical, Electrical and Plumbing Works and Civil Infrastructures.

·       An array of experience in pre and post contracts administration and management, commercial management & other Quantity Surveyor skills, covering an array of responsibilities including but not limited to; contract review and negotiation, procurement and tendering, contract management, cost management, change management, claims management, risk management, and contractual claims & dispute settlement, project financial control and reporting, cost estimate and value engineering

·       A general understanding of different Form of Contracts (FIDIC, NRM, POMI, SIA, PSSCOC, REDAS, PAM, JCT, NEC, BESPOKE) that gives an edge in interpreting contractual entitlements and obligations and raising any technical or financial concerns.

·       An Associate RICS, RICS Assessment of Professional Competence (APC) Candidate, Affiliate AIQS, Associate PICQS, and Associate

CIQS

·       Have successfully completed 3 PICQS Structured Trainings for Quantity Surveying

·       Proficient in Microsoft Office, SAP and ERP and Globe3 ERP Cost Reporting and Procurement Software, PPCS (Project Portfolio Control System) v2.0, AutoCAD,  Planswift, Autodesk Design Review, and other QS software as CATO CAD Measure and Enterprise, STAAD, Adobe Acrobat Pro. With general knowledge on SAP Ariba Procurement Software, Tenderlink and Trimble Estimating Software

 

Work History

 

L&RUI CONCEPT GROUP PTE LTD

Clemenceau Avenue, Singapore, 239922

July 01, 2019 – Present
SENIOR EXECUTIVE, QS CUM CONTRACT

(A professional and dynamic Interior Design and Fitting-Out Specialist team, for Office, Retail, Recreation, Institution, and F&B. Being client oriented, it understand the long term needs and wants of our customers. In L&Rui, we align with this objective to maintain our business partners through continual improvement, cost competitiveness and quality system initiative.)

KEY ROLES:

(1)     Report directly to Head of Department.

(2)     QS Responsibilities:

·         Run through all BOQ submitted by sales to contract for costing.

·         Sourcing for material and costs

·         Preparing plans, contracts, budgets, bills of quantities and other documentation

·         Call for vendors to submit tender for projects

·         Providing advice and forecasts about costs

·         Consolidate, evaluate and negotiate on submitted costing from vendors

·         Appoint successful vendors for projects

·         Preparing and submitting pre-cost and post-cost of projects.

·         Preparing Purchase Order for vendors after project costing are finalized and approved  by the QS Manager

·         General quantity surveying duties such as pre/post contract duties, taking-off quantities, cost control, variations, finalization of cost and tender administrative duties.

·         Evaluation & certification of contractor’s claim.

·         Assists in preparation of tenders submission and pre-tender pricing verification.

·         Prepare monthly progress claim and necessary cost analysis reports.

(3)     Contract responsibilities include:

·         Manage and lead the QS team in contract documentation

·         Examine contract matters for tendering and projects

·         Manage tendering process, analyze and evaluation of tenders

(4)     Supporting and working with Sales, Finance, Operations and Design teams, internally and externally as appropriate.

(5)     Have the obligation to ensure that Company interests are observed at all time.

(6)     Attending team meeting and sharing best practice with colleagues.

(7)     Other project related duties as required.

(8)     Other ad hoc assignment as instructed by management as required.

(9)     Includes understanding project goals, deadlines, financial boundaries to allocate best resources, scheduling project deadlines, and general coordination.

PROJECTS:

•          ID & Fit-out Works for CFS ST Office at OCBC Centre Level 25 = SGD 157,000.00

•          ID & Fit-out Works for Orchid Country Club Staff Lounge = SGD 48,342.00

•          ID & Fit-out Works to Group OT&T Office at OCBC Centre Level 26 = SGD 110,248.00

•          ID & Fit-out Works at Team Lead Room For Education Department at Level 2 for DUKE-NUS Medical School at 8 College Road = SGD 231,776.00

•          ID & Fit-out Works of Staff Canteen and Lounge for Orchid Country Club = SGD 120,855.00

•          ID & Fit-out Works to for UNIQLO Vincom Pham Ngoc Thach Store = SGD 3,139,432.08

•          ID & Fit-out Works to 9 Storey Meander Hostel at Vietnam = SGD 1,372,075.55
ALRIC DESIGN-BUILD INTERIORS PTE LTD

Yishun, Singapore, 768768

November 01, 2018 – Feb 28, 2019
CONTRACTS MANAGER

(Interior Fit-out – Conceptual Design & Development, M&E, Planning, Procurement, Site Execution, Maintenance for commercial, industrial and residential industries)

KEY ROLES:

(1) Formulate the procurement strategy for the construction contracts, including the engagement of consultants, contractors and suppliers, for the Company’s portfolio of projects, to increase the profit margin.

(2) Monitor preparation of cost plans by clients/consultants and facilitate approval of budget.  Work closely with finance on cost control for project budget. Review consultants’ designs, plans, specifications, bills of quantities and other documents.

(3) Protect and limit the Company’s liability and exposure while managing tendering process. Oversees the sourcing and preparation of information for participation in tender including measurement, quotations, costing report and submission of tenders.

(4) Attends site show round to understand the project requirements. Guides in the efforts of seeking clarifications with respective consultants regarding the discrepancies in the scope of work and drawings and ensures the replacement of addendum, drawings

(5) Responsible for the preparation of tender bid for Management’s approval. Obtaining client’s and their consultants’ concurrence on company’s proposed resolution to the technical issues during tender stage.

(6) Leads efforts in the preparation of BQ which involves quantity take-off, materials sourcing, measuring and estimating material and labour costs used in the tendering process, and other QS Jobs. Good understanding and interpretation of Conditions of Contract.

(7) Lead and manage execution of Contract Document. Advise and prepare contractual correspondences writing during project execution. Review and interpret Contract Documents with recommendation for contractual dispute.

(8) Advise and administer Extension of Time claim. Source, negotiate and procure trade packages in compliance with requirement and time schedule including drafting of Subcontract Document

(9) Ensures that procurement functions are carried out in a highly ethical manner and all decisions are made on objective and defendable grounds. Initiate, assist and lead in contractual and Variation management and documentation.

(10)  Set up, administer and update projects budget on monthly basis. Monitor and manage progress claim

submission, payment response and finalize project account. Co-ordinates the work with team members,      allocates tasks and provides effective supervision.

PROJECTS:

•          PRJ-0029-0004-19 – ID & Fit-out Works for Paradise Dynasty Restaurant At #03-08 Paya Lebar Quarter Mall = SGD 573,100.00

•          PRJ-0029-0049-18 – ID & Fit-out Works for Beauty In The Pot Restaurant At #B2-224-226 Jewel Changi Airport Singapore = SGD 1,116,240.00

•          PRJ-0156-0045-18 – ID & Fit-out Works for Beauty In The Pot Restaurant New Extension At 176, Orchard Road, #05-14 Centrepoint Singapore 238843 = SGD 172,990.00

•          PRJ-0203-0053-18 – ID & Fit-out Works for Hawker Express At Jewel Changi Airport = SGD 52,900.00

•          PRJ-0204-0055-18 – ID & Fit-out Works for 5 Room Apartment = SGD 41,895.00

PROPOSALS:

•          TN-0182-0054-18 – Proposed Mechanical & Electrical Works for Food Fish Farming HUB on Lot 1853A MK 12 and 1890X MK 12 At Neo Tiew Crescent (Lim Chu Kang Planning Area) = SGD

10,755,749.00

•          TN-0200-0046-18 – ID & Fit-out Works for Thai Express Restaurant at Jewel Changi Airport = SGD 444,704.00

•          TN-0201-0047-18 – ID & Fit-out Works for Shangri-La Gourmet Pte Ltd At Jewel Changi Airport Project = SGD 2,851,043.00

•          TN-0202-0052-18 – Supply, Deliver, Installation and Commissioning of iDisplay System for Thomson-East Coast Line (TEL) = SGD 662,200.00

•          TN-0207-0003-19 – Proposed Erection of 2-Storey Envelope Control Detached Dwelling House with an Attic, a Basement and a Swimming Pool on Lot 99707X MK15 at 7 Jalan Senandong (Bukit Timah Planning Area) = SGD 6,929,597.00
M+W SINGAPORE PTE LTD

International Business Park, Singapore, 609929

July 15, 2013 – October 31, 2018
SENIOR QUANTITY SURVEYOR

(A Global Leader in design, engineering and construction of high-tech facilities and major complex projects) (Services includes Consulting & Planning, Design & Engineering, (Pre-) Construction & Project Management, Services, Maintenance & Installation)

KEY ROLES:

I am a Project Quantity Surveyor (PQS) working in pre and post contract quantity surveying services.

In charge of overall commercial matters covering:

(1)Commercial Management of Construction – preparing cash flows, financial reports, establishing the budgets, forecasting and budget allocations, procurement and subcontracting, financial management, and payment applications for sub-contractors and client

(2) Contract Administration – Dealing with payment provisions, completion issues and final accounts, Manages Change Procedures, Cost Control and Cost Claims, Issuing Field Instructions, certificates of payments, and Involvement with dispute avoidance.

(3) Contract Practice – Carrying out contract mechanisms for the financial management aspect, such as change procedure, valuations, loss and expense and final account, LOI, LOA, insurances, retentions, bonds, LD’s, practical completions and final accounts

(4) Procurement and Tendering – Carrying out contract mechanism and manage the tendering process and negotiation processes and ensure effective negotiation and clarification during tender meetings.

(5) Project Financial Control and Reporting – preparing and monitoring the monthly cost report, budget forecast, cash flows, change orders, provisional sums, loss and expenses, risk and opportunities of the project.

(6) Quantification and Costing of Construction Works – by applying the country standard method of measurement in Valuation of changes and variations and carrying out costing of construction works by methods in projects under SIA, PSSCOC, REDAS and FIDIC.

(7) Design Economics and Cost Planning – Doing the Pre-Contract Cost Estimates, Cost Plan and Cash Flows, from the quotations and proposals from various contractors and incorporate them to the cost comparisons, including the internal estimates.

(8) Construction Technology and Environmental Services – Advising on design with significant impact on cost which also considers the budget but not compromising the design and quality, and ensure the process from start to end, good quality service.

(9) Prepares Overall Monthly Summary of Cost Reports for All M+W Singapore Projects.

(10) To assist the Procurement Manager on the procurement process, evaluation of     contractors/vendors/suppliers, managing suppliers and to ensure the pre-qualification procedures and templates were strictly implemented.

(11)    Prepares Overall Monthly Summary of Cost Reports for All M+W Singapore Projects.

(12)   Generating New Project Numbers, Generating New Proposal Numbers, Maintaining the Sales Orders, Creating Purchase Requisitions, Creating Purchase Orders, Invoice Approvals, Invoice Overviews, Invoice Transactions, Sales and Distributions Updates, Cost Reports Overviews, Budgets, Commitments, Accruals and Actuals, Budget Planning, and Forecast to the SAP & PPCS System.

DELIVERABLES:

-Prepare and Finalize Tender Documentation

-Prepare and Finalize Finance Documentation

-Prepare and Finalize Contract Documentation

INTERFACES:

-Client Project Team

-Project Consultant Team

-M+W Group Management and Project Team

-Subcontractors, Vendors, Suppliers and Service Providers

-M+W Head Office including Finance Team and Procurement Team

PROJECTS:

•          6810 – EPC – Mead Johnson Nutrition (LSC Food & Nutrition) = SGD 211,137,393.23

•          6870 – Hook-up Installation – Micron Semiconductor Asia Pte. Ltd. (ATF Semiconductor) = SGD 350,461,896.29

•          6872 – EPCM – Biocon Malaysia (LSC Pharmaceutical) = SGD 1,752,965.33

•          6896 – Design & Build – Rolls Royce Singapore Pte Ltd (HTI General Industries) = SGD 9,417,397.56

•          6888 – EPC – Roche Singapore Technical Operations Pte Ltd (LSC Pharmaceutical) = SGD 25,842,014.03

•          6915 – EPC – United Microelectronics Corporation (ATF Semiconductor) = SGD 2,472,825.00

•          6916 – EPC – Siltronic Samsung Wafer Pte. Ltd. (ATF Semiconductor) = SGD 2,117,575.20

•          6919 – Installation/Fit out – REC Cells Pte Ltd (ATF Photovoltaics) = SGD 2,578,692.34

•          6925 – EPC – Pacnet Services Global (S) Pte. Ltd. (ATF Data Centre) = SGD 49,378,175.31

•          6953 – EPC – United Microelectronics Corporation (ATF Semiconductor) = SGD 11,744,023.44

•          6985 – Installation/Fit-out – REC Solar Pte. Ltd. (ATF Photovoltaics) = SGD 9,593,311.66

•          86037 – Hook-up Installation – Siltronic Silicon Wafer Pte. Ltd (ATF Semiconductor) = SGD 1,000,620.28

•          86070 – Installation/Fit-out – Rolls Royce Singapore Pte Ltd (HTI General Industries) = SGD 3,722,095.52

•          86087 – Studies & Consulting – Viet-Lao Chemical and Rock Salt (LSC Chemicals) = SGD 2,177,232.00

•          86089 – Installation/Fit out – Systems on Silicon Mfg Co. Pte Ltd (ATF Semiconductor) = SGD 7,723,930.00

•          86097 – Installation/Fit out – United Microelectronics Corporation (ATF Semiconductor) = SGD

1,374,200.00

•          86101 – Engineering & Design – M+W Shanghai Co. Ltd. (ATF Semiconductor) = SGD 2,465,935.00

•          86110 – Detailed Engineering – Systems on Silicon Mfg Co. Pte Ltd (ATF Semiconductor) = SGD 1,071,669.00

•          86158 – EPC – Siltronic Silicon Wafer Pte. Ltd (ATF Semiconductor) = SGD 1,251,629.66

•          86170 – EPCM – Siltronic Silicon Wafer Pte. Ltd (ATF Semiconductor) = SGD 3,650,000.00

•          86178 – Design & Construction – Hewlett-Packard Singapore (Pte) Ltd (LSC-Specialty Chemicals) = SGD 6,000,000.00

•          86180 – Design – Neomaterials Pty Ltd (LSC-Specialty Chemicals) = SGD 1,639,000.00

•          86188 – Engineering & Procurement – Wyeth Regional Manufacturing (S) Pte Ltd (LSC-Food & Nutrition) = SGD 1,136,136.00

PROPOSALS:

•          1105383 – EPC – United Microelectronics Corporation (ATF Semiconductor) = SGD 1,729,929.00

•          1105401 – EPC – United Microelectronics Corporation (ATF Semiconductor) = SGD 1,000,000.00

•          1105406 – EPC – Systems on Silicon Mfg Co. Pte Ltd (ATF Semiconductor) = SGD 9,000,000.00

•          1105409 – EPC – United Microelectronics Corporation (ATF Semiconductor) = SGD 1,500,000.00

•          1105498 – EPC – Mundipharma Singapore Pte Ltd (LSC-Pharmaceutical & Health) = SGD 38,073,000.00

•          1105594 – EPC – REC Solar Pte. Ltd. (ATF-Photovoltaics) = SGD 23,200,000.00

•          1105675 – EPC – STT Singapore DC Pte Ltd (DTC-Data Center) = SGD 150,000,000.00

•          1105714 – EPCM – Merck Pte Ltd (LSC-Pharmaceutical & Health) = SGD 1,465,000.00
HYODONG DEVELOPMENT CO. LTD. SINGAPORE

Jurong Island, Singapore

August 29, 2012 – July 15, 2013
PLANNING ASSISTANT & COST CONTROL ENGINEER

This was my first job upon relocation to Singapore. (Its projects include road and earth works, plant and industry facilities, tunnel and railway constructions, and overseas constructions)

(1) Maintain a cost system for projects, project cost reports and forecasts. Prepare variation analysis, costing, quantification and remeasurement, including trends and changes. Supervise the issue of PR’s as required.

(2) Log WO’s / PR’s / PO’s on tracking system. Validate, and/or audit and report costs of manpower, equipment and materials. Responsible for providing a complete Cost Engineering service to projects.

(3) Coordinate and fulfill all project-based cost requirements and management requirements. Assist in the formulation of manpower and man-hour estimates, material consumption rates, staff expenses, estimating, cost control and cost reporting.

(4) To deal with the Subcontractors regarding quotations, claims, variation orders, and other related issues. Monitoring of Concrete Casting and Rebar and other related to civil works.

(5) Follow-up on contractual events (disruptions, variations, Extension of time) and coordinate with the concerned party to evaluate the accurate impact on the contractual planning and the overall budget and escalate it promptly.

(6) Make sure that daily reports are well filled on site in order to calculate the productivity of labour and equipment.

(7) Generate initial construction schedules of assigned projects in coordination with respective department, incorporating permit sequence chart, drawing submittal logs, material submittal logs, and subcontractor preliminary schedule.

(8) Assist the General Manager/Planning Manager in preparing the project’s baseline schedule including the relevant needed project resources (Human and equipment)

(9) Assist the PM in preparing the baseline budget (resources and materials) in order to ensure project profitability and prevent unexpected expenses.

(10) Monitor the implementation of the schedule (including the progress of execution, subcontractors work, shop drawings and materials submissions, initialization and follow-up on procurement activities as well as the provision and use of resources)

PROJECTS:

•          JAC (Jurong Aromatics Complex) (Petrochemical Plant) – USD 21,315,791.00 (Civil & Structural Works – PIling/Earth Works/Concrete Works/Drainage Works/Water & Acid Proofing Works/Paving Works/Structural Works/Foundation Works)

•          LTA Singapore – C930 Downtown Line UBI MRT Station – USD 50,000,000.00 (Civil & Structural Works – PIling/Earth Works/Concrete Works/Drainage Works/Water & Acid Proofing Works/Paving Works/Structural Works/Foundation Works)
HABTOOR LEIGHTON GROUP

Dubai, UAE

July 14, 2007 – July 31, 2012
QUANTITY SURVEYOR

This was my first time job abroad, after having an almost 2 years of postgraduate work experience in the Philippines. (The Company Offers engineering and infrastructure services that include design, development, construction, and operation and maintenance; with a strong emphasis on transport-related projects. Also offers building expertise encompasses

hotel developments, commercial and retail developments, residential developments, hospitals and healthcare facilities, education and cultural developments, industrial facilities, sports facilities and government/ defense buildings)

(1) Re-measurements – To prepare, present, submit, obtain approval and finalize re-measurement quantities from drawings and actual site visits and apply the information to procurement, subcontractor and employer related activities.

(2) Main Contract Administration – Claims, Variations and Disputes Issues – To ensure the correct procedure is adopted for the contractual entitlement for variations works (Time and Money Contractual Claims), and to administer all contractual matters

(3) Arbitration and Contractual Claims – To assess ‘Risk’ items in BOQ (Bill of Quantities) or drawings and advice on remedial measures and to support Claim Team on documentation for extension of time claims and

other disputes.

(4) Subcontractor and Major Supplier Procurement Process – To ensure the correct procedure are adopted for

the identification, selection, tendering, evaluation and negotiation of bids from Subcontractors (SC) to prior to award of the Main Contract.

(5) Subcontractor and Major Supplier Procurement Management – To ensure the correct procedure is adopted for the identification, selection, tendering, evaluation, negotiation, engagement, administration, management and finalization.

(6) Main Contract Administration – Payments and Applications – To ensure the correct procedure is adopted for the application and payment for completed work, to ensure all contract works, variations and contractual

claims are valued accurately.

(7) Cost and Revenue Controls – To prepare initial Contract allowable budgets, revised Contract forecast and

 

monthly cost reports, and to monitor site expenditure and advice on risk areas or cost over-run items.

PROJECTS:

•         590 – Design & Build – Arabian Ranches – 254 Key Villas (Arabian Ranches), (Residential Development Landed) (Residential) = USD 43,478,260.87

•         596 – Design & Build – First Gulf Buildings – 7 Buildings at Al Mamzar & Al Nahda, Residential & Commercial Buildings (7 Towers with 20 floors) (Commercial & Residential) = USD 243,478,260.90

•         609 – Design & Build – Al Ghurair – Al Ghurair City Expansion, Phase II, (2 Towers w/ 21 floors each Residential & Hotel + 5 Storey Shopping Mall and Entertainment) (Commercial & Residential) =  USD 270,648,369.60

 

CERAMIC PLAZA, FEDERAL HARDWARE

Philippines

February 02, 2007 – May 31, 2007
PROJECT ENGINEER

In 2001 the first depot hardware store in Metro Manila appeared and Federal Hardware began the industry transformation to giving customers a one-stop-shop for a wide variety of building and renovation needs at reasonable prices. The products consists of Electrical, Power tools and hand tools, Builders and Lockset, Plumbing, Paints and Chemicals, Car care, Household Wares, Gardening Tools, Appliances, Sanitary Wares, Furniture.

PROJECTS:

•         New Store Branches Construction and Renovations all around Metro Manila and Luzon Areas
COLORSTEEL SYSTEMS CORPORATION

Philippines

August 15, 2005 – July 19, 2006
ESTIMATOR & IN-HOUSE PERSONNEL

For almost 25 years, Colorsteel has been providing quality and affordable roofing, decking, and cladding products. Its products and services adhere to Japanese Industrial Standards and Philippines National Standards.

PROJECTS:

•         Roofing, decking, and cladding for Residential, Commercial and Industrial Buildings
MUNICIPALITY OF BADOC, MUNICIPAL ENGINEER’S OFFICE

Philippines

April 01, 2004 – July 31, 2005
ASSISTANT DRAFTSMAN & ESTIMATOR (WORKING STUDENT)

The Municipal Engineer’s Office is primarily responsible for the issuance of Building Permits and other related permits as mandated by law particularly the National Building Code (P.D. 1096 ) and its Implementing Rules and Regulations in order to promote public safety, order and welfare towards a sustainable and sound environment catering to Floridablanca’s development.

PROJECTS:

·         Architectural, Structural, Sanitary/Plumbing, and Electrical for the Erection, construction, alteration, major repair or renovation or conversion of any building or structure (mostly residential and commercial buildings).
PROVINCE OF ILOCOS NORTE, OFFICE OF THE PROVINCIAL ENGINEER

Philippines

October 01, 2003 – March 31, 2004
ON-THE-JOB TRAINING

Officially local government in the Philippines, often called local government units or LGUs, are divided into three levels – provinces and independent cities; component cities and municipalities; and barangays.

PROJECTS:

•         Erection, construction, alteration, major repair or renovation or conversion of any infrastructure projects (mostly public highways, roads, bridges, canals and drainages).
MUNICIPALITY OF PAGUDPUD, MUNICIPAL ENGINEER’S OFFICE

Philippines

December 01, 2001 – March 31, 2002
ON-THE-JOB TRAINING

Officially local government in the Philippines, often called local government units or LGUs, are divided into three levels – provinces and independent cities; component cities and municipalities; and barangays.

PROJECTS:

•         Erection, construction, alteration, major repair or renovation or conversion of any infrastructure projects (mostly public highways, roads, bridges, irrigations, canals and drainages).
ACJ CONSTRUCTION

Philippines

April 01, 2001 – May 31, 2003
SURVEYOR,  ESTIMATOR & DATA ENCODER (WORKING STUDENT)

A Private Construction Firm in the Philippines.

PROJECTS:

·         Architectural, Structural, Sanitary/Plumbing, and Electrical for the Erection, construction, alteration, major repair or renovation or conversion of any building or structure (mostly residential and commercial buildings).
Qualifications

 

NWU (Northwestern University)

Laoag City, Ilocos Norte, Philippines, June 1999 – October 2004
Bachelor of Science in Civil Engineering
CIMT (Chicago Institute For Management Training)

Dubai, United Arab Emirates, October 2008 – November 2008
Cost Engineering

CCE001 Skills and Knowledge of Cost Engineering – 5th Edition
PICQS (Philippine Institute of Certified Quantity Surveyors)

Bayanihan Center, Singapore, July 2014 – December 2016
Quantity Surveying Structured Training (Aligned with RICS (Royal Institution of Chartered Surveyors)
 

Achievements

 

AIQS (Affil.) Post Nominal, August 2015

AFFILIATE, AIQS (AUSTRALIAN INSTITUTE OF QUANTITY SURVEYORS)
AssocRICS Post Nominal , August 2015

ASSOCIATE, RICS (ROYAL INSTITUTION OF CHARTERED SURVEYORS)
Associate CIQS Accepted, July 2015

ASSOCIATE CIQS (CANADIAN INSTITUTE OF QUANTITY SURVEYORS)
AssocPICQS Post Nominal, May 2014

ASSOCIATE, PICQS (PHILIPPINE INSTITUTE OF CERTIFIED QUANTITY SURVEYORS)
RICS APC Candidate, 2013

APC PER (ASSESSMENT OF PROFESSIONAL COMPETENCE) CANDIDATE, RICS (ROYAL INSTITUTION OF CHARTERED SURVEYORS)
Technical skills

 

•      MS Office (Word/Excel/Powerpoint/Outlook)

•      Adobe Acrobat Pro

•      (SAP- Systems Applications and Products ERP Software) Cost Reporting/Procurement Software

•      PPCS System v2.0 (Project Portfolio Control System)

•      CATO CADMeasure v15 and Enterprise

•      SAP Ariba Procurement Software
•      AutoCAD, Planswift, Autodesk Design Review

•      (ERP – Enterprise Resource Planning) Cost Reporting / Procurement Software

•      Globe3 ERP Software (ERP – Enterprise Resource Planning) Cost Reporting/Procurement Software

•      STAAD (Structural Analysis and Design Software Application

•      Tenderlink Estimating Software, Trimble Estimating Software
Personal skills

 

(1) Quantity Surveying Skills:

Commercial Management of Construction, Contract Management, Cost Management, Project Financial Control and Reporting, Contract Administration, Contract Practice, Procurement and Tendering, Claims Management, Quantification and Costing of Construction Works, Cost Estimate, Interim Payment and Change Management, Value Engineering/Valuing Change (Variation and Change Orders, Provisional & PC Sum), Cash Flow, Final Account and Close-out Report, Construction technology and Environmental Services, Design economics and cost planning
(2) Different Form of Contracts:

A general understanding of different Form of Contracts (FIDIC, NRM, POMI, SIA, PSSCOC, REDAS, PAM, JCT, NEC, BESPOKE) that gives an edge in interpreting contractual entitlements and obligations and raising any technical or financial concerns.
Community & volunteer experience

PICQS (Philippine Institute of Certified Quantity Surveyors) Singapore Chapter, May 2014 – Present
I am the PICQS CPD Committee Head Singapore Chapter

The founding of the Philippine Institute of Certified Quantity Surveyors (PICQS), Inc. is one that started from the  vision of  its Founder to make the Quantity  Surveying trained Filipinos achieve a chartered status with internationally recognized QS professional bodies.

PICQS, Inc. is an all Filipino organization comprised of Members of the Royal Institution of Chartered  Surveyors  (RICS)  Members  of  the  Australian  Institute  of  Quantity  Surveyors (AIQS), Student  and  Trainee  Members  of  the  RICS,  Chartered members  of  internationally recognized QS professional bodies, QS-trained Engineers who are working towards their QS Study,  Assessment  of  Professional  Competence  (APC)  and Assessment  of  Technical Competence (ATC) towards Chartered Membership.
Badoquenos Around The World

Badoc Ilocos Norte, Philippines

Dec 2013 – Present
Donor/Sponsor

Our mission is to serve, act and foster the youth community of Badoc, Ilocos Norte. Our focus is primarily on the provisions of educational development, growth and excellence. We are committed to serving this mission one village, one school and one child at a time.
Interest

 

Interested to explore more on the pre and post contracts administration & management, commercial management, contract review and negotiation, tender review, cost management, risk management, and contractual claims & dispute settlement.

Gain more experiences in the Construction Industries, but not limited to Residential, Commercial, Infrastructure & Civil Engineering, Industrial Plants, Advanced Technology, Life Sciences, Chemicals, Semiconductors, Data Centers, Cleanrooms, Restaurants.
To explore more and do in practice the different Form of Contracts (FIDIC, NRM, POMI, SIA, PSSCOC, REDAS, PAM, JCT, NEC, BESPOKE) that gives an edge in interpreting contractual entitlements and obligations and raising any technical or financial concerns.
Additional Informations

 

Notice Period: Immediate (can start work anytime)

Reasons for Leaving:

(1) Alric Design Build Interiors Pte Ltd = Family reason

(2)           M+W Singapore Pte Ltd                        = Resigned

(3) Hyodong Development Pte Ltd         = Resigned

(4) Habtoor Leighton Group LLC           = Relocation

Referees: Upon request

Education

01/06/1999 /16/10/2004 bachelor of science in civil engineering at northwestern university