Photo

Abel N. Nilo Site Civil Engineer

all country
1.Expertise in Supervision and Management of Pipe Laying and Land Development Works 2.  Computer Literate – MS Word & MS Excel

Civil Engineer with total 25 years of experience in supervision and management of pipe laying works including Micro Tunneling, excavation, installation of house service connections, air release valves, blow offs, fire hydrants and district meters, construction of chambers, road and drainage construction, land development and other kinds of civil works.

 

Education

June 1983 to March 1989 Bachelor of Science in Civil Engineering at Far Eastern University

Experience

May 1, 2017 to October 10, 2017 Site civil engineer at First Burhan International Company Doha Qatar

1. Supervises and monitors the following activities
 Pipe laying of Ductile Pipe ( 100mm dia. up to 400mmdia.)
 Trench Excavation
 Shut down from existing to proposed pipe
 Installation of House Service Connections, Air Release Valves, Blow Offs, Fire Hydrants, and District Meters
 Construction of all kind of Chamber
2. Ensures that the works are constructed strictly in accordance with the Contract specifications and accompanying drawings.
3. Monitors the adequacy of the equipment and human resource (manpower) requirements
4. Estimates the materials requirements
5. Coordinate to Kahramaa inspector for the inspection of the completed work and the schedule of shut down

June 22, 2013 to April 15, 2017 Site civil engineer at Alwaha Contracting & Trading Co. W.L.L. Doha Qatar

1. Supervises and monitors the following activities
 Pipe laying of Ductile Pipe ( 100mm dia. up to 400mmdia.)
 Pipe laying of HDPE pipe (125mm dia. To 500mmdia.)
 Trench Excavation
 Shut down from existing to proposed pipe
 Installation of House Service Connections, Air Release Valves, Blow Offs, Fire Hydrants, and District Meters
 Construction of all kind of Chamber
2. Ensures that the works are constructed strictly in accordance with the Contract specifications and accompanying drawings.
3. Monitors the adequacy of the equipment and human resource (manpower) requirements
4. Estimates the materials requirements
5. Prepares the Detail for the shut down and daily accomplishment reports
6. Coordinate to Kahramaa inspector for the inspection of the completed work and the schedule of shut down
7. Conduct trial hole for all underground utilities prior to start excavation for pipe laying and micro tunneling

March 22, 2011 – June 5, 2013 Site civil engineer at Boom Construction Company Doha Qatar

1. Supervises and monitors the following activities
 Pipe laying of Ductile Pipe ( 200mm dia. up to 600mmdia.)
 Trench Excavation
 Shut down from existing to proposed pipe
 Installation of House Service Connections, Air Release Valves, Blow Offs, Fire Hydrants, and District Meters
 Construction of District Meter and Sluice Valve Chamber
2. Ensures that the works are constructed strictly in accordance with the Contract specifications and accompanying drawings.
3. Monitors the adequacy of the equipment and human resource (manpower) requirements
4. Estimates the materials requirements
5. Check the inside barrel of the pipes free from dirt and other extraneous materials (including sand bedding and soils) during the jointing and the laying process, and after the pipes have been laid.
6. Prepares daily accomplishment reports

August 5, 2003 to March 8, 2011 Project Inspector. at Maynilad Water Services, Inc.

1. Supervised and monitored the following activities
 Pipe laying of PVC, HDPE, GSP, Steel Pipe, Cast Iron Pipe & Ductile Pipe
 Interconnection from existing to proposed pipe
 Installation of House Service Connection, Air Release Valve, Blow Off, Fire Hydrant, In Line Booster Pump, District Meter & Pressure Release Valve
 Construction Valve vault, Valve box and Manhole.
 Construction of New Deepwell and elevated water tank.
2. A detailed knowledge of the Contract specifications and accompanying drawings. (A thorough knowledge of the above documents is essential to ensure that the works are constructed in strict accordance with the Contract.)
3. Monitored the adequacy of the equipment and operators of the contractor.
4. Monitored the adequacy of the daily human resource (manpower) requirements of the Contractor.
5. Monitored the adequacy of the daily material requirement of the Contractor.
6. Ensured that the Contractor maintains the inside barrel of the pipes free from dirt and other extraneous materials (including sand bedding and soils)-both during the jointing and the laying process, and after the pipes have been laid.
7. Prepared Time extension and Variation order of the contractor
8. Checked the safety standard requirement before working if the contractor complies.
9. Prepared daily accomplishment report of the contractor and S-Curve.
10. Reviewed and evaluated the progress billing of the contractor.

June 2000 – March 31, 2003 Pipe Line Inspector at Philaqua Consultant, Inc.

1. Supervised and monitored of the following activities:
 Pipe laying of 400mmØ SP and1200mmØSP
 Pipe Jacking of 1200mmØSP
 Valve Replacement
 Interconnection from existing 1050mmØ SP to proposed 1200mmØ SP
 Construction of manhole and valve vault.
2. Notified the contractor when it failed to comply with any provisions of the contract including provision of a safe and healthy working environment for staff and workers.
4. Checked the workmanship of all aspects of the works.
5. Monitored the adequacy of the equipment and operators of the contractor.
6. Monitored the adequacy of the daily human resource (manpower) requirements of the
Contractor.
7. Monitored the adequacy of the daily material requirement of the Contractor.
8. Ensured that the Contractor maintains the inside barrel of the pipes free from dirt and other
extraneous materials (including sand bedding and soils)-both during the jointing and the
9. Conducted dye penetration test.

January 1995 – May 2000 Field Engineer at Linear Construction and Development Corp.

1. Supervised and monitored of the following activities:
 Land Development of Dolmar Hills Subdivision @ Marilao Bulacan
 Construction of Road( Department of Public Works and High Ways Project)
 Pipe laying
 Interconnection from existing to proposed
 Construction of valve vault and manhole.
 Construction of roads and drainage.
2. Monitored the adequacy of manpower, materials and equipment needed.
3. Prepared the material requirement for testing needed
4. Prepared the weekly accomplishment and progress billing.
5. Conducted field density test.

June 1992- April 1993 Field Engineer at Ritvit Construction Development Corp.

1. Prepared daily accomplishment reports
2. Monitored the adequacy of the daily manpower, materials and equipment
needed.
3. Supervised and monitored pipe laying and interconnection

February 1990 – May 1992 Field Engineer at Green Jade Construction Development Corp.

1. Supervised and monitored of the following activities:
 Pipe laying, looping, valve replacement, and interconnection
 Installation of new meter assembly and meter relocation
 Construction of district meter and manhole.
2. Monitored the adequacy of the daily manpower, materials and equipment
needed.