Photo

Rolando Bobis Quantity Surveyor

Philippines

CURRICULUM VITAE

 

1.
PROPOSED POSITION
:
Civil Engineer, Quantity Surveyor, Estimator
2.
NAME
:
Rolando S. Bobis
3.
DATE OF BIRTH
:
August 01, 1963
4.
NATIONALITY
:
Filipino
5.
EDUCATION
:
Bachelor of Science in Civil Engineering

Registered Civil Engineer,

PRC No. 0113411

Contact Number

 

 

e-mail address
:

:

 

:
0063 956 468  6909

0063 917 538 4834  c/o  Ruth Bobis Gutierrez

[email protected]

[email protected]

[email protected]
7.
KEY QUALIFICATION:

Mr. Rolando Bobis has over twenty (20) years of professional experience working in different construction firm as Civil Engineer, Quantity Surveyor and Estimator. His wide experience covered supervision and implementation of projects and detailed engineering and conceptual estimating for land development works, roads, parking areas, bridges, residential houses, low, medium and high rise buildings, airports, potable and fire water supply system, storm drainage system, sanitary waste water collection system, landscaping works, grandstand, cisterns, steel and reinforced concrete water tank, industrial buildings and other structures. He started out his career in small private company who engaged in constructing mass housing projects then joined in different large private company involved in constructing different structures. Then year 2006 later he started working as an overseas contract worker in the middle east and spent almost ten (10) years working in different international consulting engineering company. He is proficient and easy to excel in using different software such as Excel , Word, Power point, Auto CADD, with basic knowledge in STAAD, MS Project, Micro Station and Primavera project planner.

8.
OTHER TRAININGS:
:

a)   Structural Steel Design Using LRFD

Held AT Hive Hotel & Convention Place, 68 Sct. Tuason,

Diliman , Quezon City, Phipippines on 23-25 August 2019

By RBRA (PRC Accreditation No. 2017-013)

 

b)   STAAD Pro V8i

Held on May 06, 2012 to May 27, 2012 for 25 training hours

By MICROCADD TECHNOLOGIES COMPANY INC.

Cubao, Metro Manila

 

c)  MS PROJECT 2007

Held on Dec18, 2011 to Jan 29, 2012 for 25 training hours

MICROCADD TECHNOLOGIES COMPANY INC.

Cubao, Metro Manila

 

d)  Electrical Safety in the Construction Industry

Held on February 6, 2009

Philippine Institute of Civil Engineers

Eastern Province Saudi Arabia International Chapter 1-01,

Al-Khobar Kingdom of Saudi  Arabia

e)   Boysen Painting Seminar

Held on February 28, 2006 at Filinvest Land Inc. Office

San Juan, Metro Manila

 

f)H2S Breathing Apparatus Familiarization Course

Held at QATAR Gas Office @ Ras Laffan Qatar

Conducted by : Khalil  Dodin / Qatar Gas

Course Date: 13 – Jun – 2006

 

g)  Fire Fighting Course

Held at Qatar Gas, Ras Laffan Qatar

Conducted by : Qatar Gas Group

Course Date :  June – 2006

 

h)   Construction Project Management

Held at Quezon City, National Irrigation Administration

Conducted by: Quality Computer System Inc.

On August 20 – 21,  1999

 

i) Computer – Aided Cost Estimate

Held at  Manila on August – September  1999

Trainer: CAD Vision Engineering Technologies

 

j)   Computer  — Aided Project Management

Held at Manila on September – October 1999

Trainer:  CAD Vision Engineering Technologies.

 

k)     Computer  — Aided Design & Drafting (Auto – CADD)

Held at Manila on June – August 2002

Trainer:  CAD  Vision  Engineering Technologies

 

9.   LANGUAGE AND DEGREE OF PROFICIENCY

Speaking
Reading
Writing

English

Excellent
Excellent
Excellent

Filipino

Excellent
Excellent
Excellent

10.
1.                       COUNTRIES OF WORK
:
Philippines, Saudi Arabia and Qatar
11.
EXPERIENCES
:

FROM
:
March 11, 2017

TO
:
November 30, 2017

EMPLOYER/FIRM
:
Philippine Associated Smelting And Refining Corporation

POSITION HELD

:
Project Estimator / Senior Quantity Surveyor

Name of Project: PASAR’s Plant  Infrastructures

Client:  Philippine Associated Smelting And Refining Corporation

Isabel , Leyte

Project Description:

The scope includes upgrading, conversion and construction new part of PASAR’s infrastructure as part of support from the existing industrial plants such as Acid Plant, Extension of Smelting Building,

Concentrate Conveying, Concentrate Storage, Carbide Slag Stockyard, repair of Thickener Dewatering and New Slag Stockyard. Projects were all designed and constructed in such a way to maintain and to increase production as it plan for PASAR’s primary product the electrolytic copper cathodes the raw material used for manufacturing various kinds of electric cables and other copper products.

FROM
:
August 15, 2016

TO
:
November 15, 2016

EMPLOYER/FIRM
:
Valenzuela Solar Power

POSITION HELD

:
Project Engineer

Name of Project: Valenzuela Solar Power

Client:  Valenzuela Solar Energy Inc.

Project Description:

The scope includes area development, conversion and landscaping for the former 11 hectares unused fishpond to a solar power panel farm to generate 8.6 megawatts of electricity in Valenzuela City. These also includes site preparation and earthworks, two (2) lane access roads (constructed in a 80 mm , 50 gravel bedding on 200 mm aggregate base, and 250 mm aggregate sub-base on selected fill material and on existing ground), storm drainage systems, potable water distribution system, one (1) administration bored piled control building, five invert (5) building and microwave steel tower.

FROM
:
September 27, 2012

TO

EMPLOYER/FIRM
:

:
March 20, 2015

Fahd Alireza Engineering Consultants

Al Subeiae Bldg. Al Khobar Saudi Arabia

POSITION HELD
:
Quantity Surveyor / Estimator

DESCRIPTION OF DUTIES:

a)     Create/Prepare conceptual estimate, cost analysis and estimate planning, coordination and consolidation.

b)     Review plans, drawings and specification and responsible for the preparation of Materials Takeoff (MTO), Detailed Cost Estimate, Summary Cost Estimate and other estimating works that includes direct and indirect costs in accordance with company procedures.

c)     Assisting the development of final cost estimates, finalizing Request for Proposals (RFP) and Specifications from inception to completion.

d)     Responds to queries and other clarifications forwarded by the contractors.

e)     Prepares request for back-up quotation by sending e-mail to different suppliers.

f)       Estimate prices of all items including addendum and other change trend notice.

g)     Perform any other duties as assigned directly by the head of department or section.

FROM
:
July 04, 2010

TO
:
July 12, 2012

EMPLOYERS/FIRM
:

SOFCON-FOSTER WHEELER JOINT VENTURE

Twin Tower Bldg Al Khobar Saudi Arabia

POSITION HELD
:
Estimator/Cost Controller

DESCRIPTION OF DUTIES:

a)   Prepare estimates including direct and indirect costs using first principles and norms in    accordance with company procedures.

b)   Analyzes cost/price data from suppliers/subcontractors, with the ability to generate comparative data (historical costs and other metrics) as part of the cost/price analysis.

c)   Manages the development of estimates from inception to completion.

d)   Continuing contacts with working and supervisory level personnel in engineering, procurement, construction and other vendor community

e)   Prepares conceptual estimating, cost analysis and estimate planning, coordination & consolidation.

FROM
:
August 26, 2006

TO
:
June 01, 2010

EMPLOYER/FIRM
:
Worley Parsons Arabia

Cement Tower Building Al Khobar Saudi Arabia

POSITION HELD
:
Estimator

DESCRIPTION OF DUTIES:

a)   Prepare estimates including direct and indirect costs using first principles and norms in accordance with company procedures.

b)   Review and analyze all claims and change orders on project contracts.

c)   Prepare cost comparison and analysis of estimate submitted by the contractors.

d)   Prepare written estimate clarification (inclusions and exclusions).

e)   Prepares and maintains a directory of suppliers, contractors and sub-contractors.

f)    Providing general support to the area project team.

g)   Coordinate and liaise with personnel in other departments to discuss and formulate estimates and resolve issues.

h)   Prepare other duties that maybe assign in related to cost Estimating Works.

 

FROM
:
November 24, 2003

TO
:
April 30, 2006

EMPLOYER/FIRM
:
Filinvest Land Incorporated

P. Gomez St. San Juan Metro Manila, Philippines

POSITION HELD

:
Quantity Surveyor

DESCRIPTION OF DUTIES:

 

a)     Responsible for the preparation and distribution of Technical documents to the contractors such as invitation to Bid, Instruction to Bidders, Bid Form, List of OSM and Bill of Quantities of every proposed projects.

b)     Prepare/collate mathematical calculation of quantities of every item into clear, well-structured spreadsheets based on approved plan and Specifications

c)     Prepare Cost Estimate of Probable amount of Materials, Labors & Equipment, amount of Owner Supplied Materials (OSM) and the cost covered by the Trade Contractors

d)     Responsible for evaluation and checking of documents such as Variation and Change Orders on project contracts.

e)     Participation in the negotiation of project contracts as required

f)       Prepare and update the list of suppliers, contractors and subcontractors.

g)     Prepare other duties that may be assign in related to other cost estimating works.

 

 

FROM
:
April 15, 2003

TO
:
November 15, 2003

EMPLOYER/FIRM
:
ECE Realty and Development Corporation

Park Avenue Mansion Pasay City Metro Manila, Philippines

POSITION HELD
:
Civil Estimator/Quantity Surveyor

DESCRIPTION OF DUTIES:

a)     Study and review all the scope of works as assigned

b)     Prepare materials take-off and it’s cost from tender drawings, including Actual Cost, Bid Cost, Budget Control Cost, Cost Breakdown, Additional and Change Order Cost

c)     Prepare cutting list of rebar, back up by tender drawings as per structure when required

d)     Providing full estimating services to ongoing projects and studies

e)     Prepare and update the list of suppliers, contractors and subcontractors

f)       Perform all duties (related to the nature of the job) assigned by the Project Manager

 

FROM
:
July 08, 2002

TO
:
January 31, 2003

EMPLOYER/FIRM
:
People’s Asia Pacific Construction Corporation

#277 Tomas Morato Avenue Metro Manila, Philippines

POSITION HELD
:
Estimator/Quantity Surveyor

DESCRIPTION OF DUTIES:

a)     Prepare/collate  mathematical calculation of quantities of every item into clear, well-structured    spreadsheets based on approved plan and Specifications

a)     Review and analyzes all claims and change orders on project contracts

b)     Providing full estimating services to ongoing projects and studies.

c)     Prepare bar bending schedule as when required

d)     Attend site review and pre bid meetings where required

e)     Perform all duties (related to the nature of the job) assigned by the Project Manager

FROM
:
April 22, 1993
TO
:
December 30, 2001
EMPLOYER/FIRM
:
GRUPPO CHK Industries

#43 Rincon Road Malinta Valenzuela Metro Manila, Philippines
POSITION HELD
:
Project Engineer
DESCRIPTION OF DUTIES:

a)   Responsible for the supervision of projects in carrying out various activities based on approved   plan and specification

b)   Submit a report to the Project Manager regarding the status of projects, and some information needed to organize and control all the available resources in order to achieve maximum productivity

c)   Provide an estimate for labor cost to serve as control tools in providing the data for weekly accomplishment report

d)   Participate on every pre-bid meeting and bidding competition for future projects.

e)

FROM
:
August 02, 1989

TO
:
April 15, 1993

EMPLOYER/FIRM
:
Flash Builder Incorporated

POSITION HELD
:
Senior Project Coordinator

DESCRIPTION OF DUTIES:

a)     Responsible for the purchasing and estimating work and to provide feedback in response to Field Engineer’s call regarding day to day problem at worksite such as materials and equipment needs

b)     Provide an estimated Materials take-off on every assigned projects for procurement purposes

c)     Participate on every pre-bid meeting and Bid competition for future projects

d)     Undertake accurate materials take-off

e)     Review and analyze all claims and change orders on project contracts

f)      Providing full estimating services to ongoing projects and studies.

FROM
:
August 08, 1988

TO
:
November 27, 1988

EMPLOYER/FIRM
:
Advance Tech Construction (Mass Housing Project)

POSITION  HELD

:
Project Engineer/Material Control Engineer

a)     Responsible for the supervision of projects in carrying out various activities from site layout to the time of finishing the projects

b)     Conduct a series of checks and inspection during construction at site

c)     Prepare bar bending schedule before and during site construction

d)     Support Project Control efforts on a project in the areas of budget extractions, change order estimating, and progress base generation

e)     Responsible for the preparation of materials requisition based on studied construction program indicating the quantities, methods, schedule, of deliveries and their rate of use

f)       Responsible for the documentation of all materials arriving at site to be in right place and in sufficient quantities

g)     Provide layouts of storage areas, time and method studies of materials requirements, frequent quality and quantity checks

h)     Submit daily report related to all critical materials and equipment needed at site.

 

12
OTHER PERSONAL IDENTIFICATION:

Philippine Professional Regulation Commission (PRC) Number
:
113411

PRC I.D. Number
:
2258809

Saudi Council of Engineers Accreditation Certificate Number
:
164983

Social Security System (SSS) I.D. Number
:
03-9078124-6

Tax Account Number (TIN)
:
130-862-829

PhilHealth Number
:
19-025114291-6

Voter’s ID Number
:
PH01-0000A-H0163RSB10000

Philippine Driver’s License Number
:
N03-95-195555

Passport Number
:
P4444713A

Issued on
:
September 20, 2017

Valid until

Issuing authority
:

:
September 19, 2022

DFA Manila

I Mr. Rolando S. Bobis, solemnly declare that the information I have given in the foregoing application is true, complete and correct and I make this solemn declaration conscientiously believing it to be true and knowing that it is of the same force and effects as if made under oath.

 

Rolando S. Bobis

Date: Sunday, September 01, 2019