CURRICULUM VITAE
1. Main position exercised: Electromechanical Engineer:
2. Last name :MAHMOUDIA
3. First Name(s) : Meziane
4. Date of birth : 1971/04/24
5. Nationality : Algerian
6. Family Situation : Married, Father of Two Children
7. Address : 05 Road Arezki Aït Ider El Mouradia, Algiers Algeria
8. Education:
Institution:
National Examination Board at High School of Azeffoun Tizi-Ouzou
Date:
from 09/1988 to 07/1991
Title(s) and university degree(s), diploma(s):
High school diploma. N°62722
Institution:
UMMTO University of Tizi-Ouzou
Date:
from 09/1997 to 07/2001
Title(s) and university degree(s), diploma(s):
Diploma of applied studies in electronics option industrial control.
End-of-study memory “Study and execution of a data acquisition center on 16 Bits”
9. Other training
• Chemical and electrical hazard training OPREBAPTH, Algiers.
10. Language proficiency, rated 1 (basic knowledge) to 5 (perfect proficiency)
Langage
Reading
speaking
writing
English
4
3
4
French
5
4
5
Arabic
4
4
4
Kabyle
Maternal
11. Membership in professional associations: None.
12. Other capabilities: Engineering, HV Power, MT and BT, instrumentation, Process of drinking and waste water.
13. Current Position: Technical and Sales Manager.
14. Employee of current company: COSIDER CANALISATIONS ET TRANSPORT ENERGIE since 03 year(s), permanent employee since 10 October/2016
15. Key qualifications:
• Qualifications 1: Studies and/or execution, control and supervision in the following sectors: transfer of drinking water, Wastewater, Irrigation, Gas, and Electricity (simple or complex installations).
• Qualifications 2: Participation in the implementation of drinking or waste water treatment plant projects using the activated sludge process.
• Qualifications 3: Other qualifications by field
ü Remote Management: Studies of radio remote management systems.
ü Cathodic protection: Control and follow-up of the supply, installation, testing and commissioning of final and provisional
ü Equipment:
Electric power: Low Current Engineering (CFO- CFA). Technical analyses of files and specifications. Pre-commissioning check-listing of electrical parts and instrumentation.
BT. Electricity, HV MT, LV to grids 4-20mA
Wiring work for industrial electrical cabinets, drawing, electrical equipment, wiring and single-wire on AutoCAD, x-relay, and caneco.
ü Control, Command and instrumentation.
ü Electro mechanics: regulation equipment, Curative and preventive maintenance programs for the sewage treatment plant lift and discharge stations, drinking water treatment plants.
Supervision of maintenance work of pumps with impellers (wheels, mechanical seals, stuffing press, bearing), dosing pumps (membranes, suction and discharge valve, anti-pulsation balloon).
Operation of electromechanical and programmable automaton equipment.
Diagnoses and controls faults according to safety rules. Creates new assemblies from execution plans.
Electrical diagrams, modifies and cables of electrical cabinets. Electrical connection and commissioning of electromechanical equipment (Three-phases motors, motorized valves, water pumps, sludge pumps, submersible pumps, cranes, forklift and handling trucks, etc. Industrial and public lighting.
ü Process:
dimensioning of electrical and electromechanical equipment and ultrasonic instrumentation for level, Ph, conductivity, turbidity, pretreatment products, and flow rates.
Sizing of plant and waste water equipment (water and sludge banks), and drinking water treatment plant equipment
Country
Date: from (month/year) to (month/year)
Algeria
Since 09/2001 to date 21/10/2019
16. Overview of work experience (projects):
Date:
from (month/year) to (month/year)
Country
Algeria
Society
Company COSIDER CANALISATIONS ET TRANSPORT ENERGIE
Position
Technical and Sales Manager position
Description
– • Project Title: Headquarters of the Directorate General Hydraulic and Energy Division
o provide technical monitoring of projects
• Project Description:
– Transfer, Reinforcement, and Drinking Water Treatment.
– Studies and Works of the achievements of Wastewater treatment and treatment plant.
– Construction of 400/220/60/30 kV HV substations and transmission of electricity via overhead lines and underground connections.
• Description of the tasks:
– Preparation of tenders for national and international tenders in the field of drinking water and waste water, transfer and sewerage networks, very high electricity generation and transport, High, and Medium voltage.
– Monitoring of projects in progress in the sectors mentioned above.
– Verification of site attachments, preparation of balance sheet situations, partial and general statements
Date
From 01/02/2016 To 30/09/2016
Lieu
Bejaïa Algeria
Society
NEE Spa Project Management Office for the Customer: Algerian Des Eaux
Position
electromechanical engineer.
Description
• Project title: Monitoring, control and approval of the studies and works to strengthen the drinking water supply in the municipalities of Sétif and Bordj-Bou-Arreridj from the Tichy-Haf Dam Algeria:
• Description of the project:
– Section N°1 “Completion of a 63000m3/d TICHI HAF processing plant”
– Section N°2 « Common section of pipe DN1000 DN 900 DN 800 et DN 700 en BPAT et acier BORDJ BOUARRERIDJ – SETIF ET BRANCHE OUEST- BORDJ BOUARERIDJ»
– Section N°3 “East Branch: Selected”
• Description of tasks
– Analysis, verification and validation of execution plans and follow-up of achievements in accordance with the Specification Contract to the Specifications and Standards in force.
– Monitoring of installation work of online equipment (VS, VE, VD, over speed… Remote management by radio frequency, Cathodic protection system… etc., functional analysis of the hydraulic chain and profiles of the transfer lines.
– Analysis, verification and validation of the installation and electrical plans of the equipment used to carry out the work, operating instructions, technical memories for the construction of a drinking water treatment plant, and a floating barge to feed the corridor and monitor construction work on site.
– Analysis, verification and validation of execution plans and follow-up of execution of construction work for 11 pumping stations and 12 drinking water storage tanks as well as the electrical and remote management systems
– Analysis, verification of studies and plans of the PID drinking water treatment process system, instrumentation, and corridor telegestion.
– Verification of partial and overall attachments and counts of the supply and installation of electrical hydro mechanical equipment, instrumentation, telegestion, etc. etc.
– Monitoring of the performance in accordance with the Contract, the rules and standards in force.
Date
From 15/08/2014 to date 27/12/2015
Lieu
City of ARRIS Wilaya de BATNA Algeria
Society
Grouping of monitoring offices CTH/ Sources/sources International on behalf of the Client: National office of d’Assainissement (ONA)
Position
electromechanical engineer.
Description
• Project Title: Monitoring, Controlling and Approving Studies and Work
• Project description: Completion and operation of the ARRIS STEP 63000 EQ/H.
• Description of tasks
– Monitoring of the performance in accordance with the Contract, the rules and standards in force.
Date
From 18/06/ 2014 To 04/08/ 2014.
Lieu
wilaya of Oran Algeria
Society
Cosider Pipes on behalf of the customer: National Office of irrigation and drainage
Position
electromechanical engineer.
Description
• Project Title: Work Tracking and Approval
• Project description: Realization of two pumping stations from the STEP EL-KARMA, the in wilaya of Oran. And an irrigation network of the perimeter of the M’LETA plain (5064 Hectares).
• Description of tasks
– Analyses of electro-hydro mechanical equipment and electrical equipment at pumping stations
– Analyses of electro-hydro mechanical equipment and electrical equipment for irrigation networks.
Date
From 05/09/2013 To 25/12/2013
Lieu
Algiers
Society
: office of engineering AGC, GHE, SASMI Group Algeria
Position
Independent consultant in charge of activities
Description
• Project Title: Audit & Approval of the AEP Tichy-Haf Transfer Project Record and Final DGD.
Technical Advice for the Review and Implementation of Cathodic Protection for 8″ Gas Distribution Pipeline 40 km.
Study and engineering of fire protection system in a power plant in the wilaya of Boumerdes
• Project Description: Freelance Exercises
• Description of task:
– Finalization of pending files on the projects mentioned above.
Date
From 01/03/2013 to 15/07/2013
Lieu
BEJAIA at the East of Algeréra
Society
SARL HYDROPLUS on behalf of Customers: DHW; ONA; NAFTAL; SEACO
Position
Technical and Production Director
Description
• Project title and Description of the project: Preparation of technical offers for bids, supplier consultations, for works of (pumping stations, purification stations and irrigation networks), team manager. Reception of hydro mechanical, electrical, hydro-electromechanical, and remote management equipment
• Description of tasks
– Analysis of national and international tender specifications for the water sector.
– Engineering team leadership for bid preparation.
– Management of projects in progress.
Date
From 01/04/2010 to 31/12/2012
Lieu
Wilaya of BEJAIA
Society
Grouping Egis international/Bceom/AGC on behalf of the client: National Agency of dams and Transfers (ANBT)
Position
Electrical Mechanical Engineer:
Description
• Project title: Studies, control and monitoring of the execution and construction of treatment and transfer works for the supply of drinking water and industrial water in urban areas
o located on the Akbou-Bejaia corridor from the TICHI-HAF Dam.
• Project description: laying of supply pipes (87 Km), construction of eight (08) reservoirs with pumping stations (1500 m3-20.000 m3), construction of a treatment plant with a capacity of 120.000 m3/d, and an intermediate chlorination station of 70,000 m3/d staffing of the remote management system, and a cathodic protection system.
• Description of tasks
– Monitoring of performance in accordance with the Contract, the rules and standards in forc
– Analyses of electro-hydromechanical equipment and electrical equipment at pumping stations.
– Analysis of process studies and instrumentation of drinking water treatment plants by gaseous clore with a capacity of 120.0000 m3/J intermediate chlorination plants Approvals of data sheets Suppliers -Supply of line equipment on transfer line.
– Monitoring the studies and achievements of the cathodic protection system of the AEP transfer pipes –Steel and BPAT
– Monitoring the studies and implementation of a system of remote management of the transfer and the AEP processing process
– Collaboration in the design of the project monograph.
– Analysis, verification and validation of execution plans and follow-up of achievements in accordance with the Contract and Standards in force.
– Monitoring of installation work of online equipment (VS, VE, VD, Overspeed… Remote management by radio frequency, cathodic protection system… etc., functional analysis of the hydraulic chain and profiles of the transfer lines.
– Analysis, verification and validation of the installation and electrical plans of the equipment for carrying out the work, the operating instructions, the technical memories for carrying out a water treatment plant
– Analysis, verification and validation of the execution plans and follow-up of the execution of the construction works of 11 pumping stations and 12 drinking water storage tanks as well as the electrical and remote management installations of the system
– Analysis, verification of studies and plans of the PID Drinking Water Treatment Process system, instrumentation, and remote corridor management.
– Verification of partial and global attachments and counts for the supply and installation of electrical hydro mechanical equipment, instrumentation, remote management, etc. etc.
– Monitoring of the performance in accordance with the Contract, the rules and standards in force.
Date
From 03/12/2008 to 02/12/2009
Lieu
City of Baraki Wilaya Algiers
Society
VATECH/WABAG Gmbh on behalf of the customer: National Office de Assainissement (ONA)
Position
Electrical and instrumentation engineer:
Description
• Project title: Rehabilitation and operation of the Algiers Wilaya Wastewater Treatment Plant (STEP BARAKI) 900,000 Eq/Hab
• Description of the project:
– Rehabilitation of the wastewater treatment plant (STEP BARAKI) of the wilaya of Algiers 900.000 Eq-hab
Phase I: WWTP Rehabilitation.
Phase II: Operation of WWTP for 2 years.
• Description of the tasks:
1. Rehabilitation Phase:
– Disassembly of electromechanical equipment and cabinets of the old technology (Telemechanics) to be able to replace with equipment and material Siemens.
– Analysis of contractual document plans, operating instructions, process and customer requirements.
– Reception on the project site of equipment, heavy water and mud treatment systems.
– Analysis and verification of the plans and execution of the civil engineering which will receive the installation of heavy equipment, lifting screws, bridges, filters, transformers air compressors, electrical cabinets and various pumps water sands, and sludge.
– Contribution to the installation of the various hydro-mechanical, electromechanical, electrical and instrumental equipment in wastewater and mud treatment systems.
– Collaboration in the semi-industrial and industrial commissioning of the various works in two water and sludge sectors.
2. Rehabilitation Phase:
– Collaboration in the implementation of operating procedures for the contractual term of the STEP
– Introduction to the operation of the operator’s various teams.
Date
From 03/04/ 2006 to 30/06/ 2007
Lieu
TFT- Ain Amenas-HASSI MESSAOUD
Society
Sarpi SPA (joint venture ABB/ Sonatrach) on behalf of the client: SONATRACH
Position
Electrical and instrumentation engineer:
Description
• Project Title:
– Extension of the GR1 & GR2 gas pipelines from Alrar to Hassi-R’mel S.C/ GAZ, each 400 km, and construction of a compressor station at the TFT cut-off station.
• Description of the project:
– Increase in capacity for GR 1 and GR 2 pipelines. From 1350 000 Nm3/h to 2583 000 Nm3/h. to the national gas dispatch centre CNDG HASSI R’MEL point of arrival (GR1/ GR2 gas pipeline point of departure: Illizi; equivalent to 1000 km).
• Description of tasks
– Collaboration in the analysis of studies and assembly of electrical, electromechanical and instrumentation equipment of gas stations. Development of plans on Autocad and Autocad-Mep and supervision of electromechanical and electrical work.
– Cabling, Mounting of BT cabinets, control and control stations, on extensions of compressor and pumping stations GR1/GR2 pipelines. Electrical works and assemblies: electrical building control building system SCADA remote monitoring and intrusion prevention auxiliary networks and fire protection system.
From 02/04/2005 to 30/02/2006.
Date
Lieu
Gué Constantine, Algiers and Setif.
Society
ABB UTILITIES subcontractor on behalf of the customer: Sonelgaz/ GRTE
Position
Responsible for electrical works and instrumentation
Description
• Project Title: Renewals of Sonelgaz dispatches.
• Project description: Construction of the building for the improvement of the national electricity and gas dispatching.
• Description of the tasks:
– Collaboration to the study and the realization of the new dispatching.
Date
From/05/2004 to/03/2005
Lieu
Clean-up micro-stations of the wilaya of Tizi-Ouzou
Subcontractor HYDRO-TREATMENT DHW TIZI-OUZOU- DEVELOPMENT PROGRAMMES OF THE WILAYA TIZI-OUZOU
Electrical and instrumentation engineer
Society
Project Title:
– Rehabilitation and renovation of sewage treatment plants in Tizi-Ouzou and neighboring towns DHW TIZI-OUZOU- DEVELOPMENT PROGRAMMES
Position
Electrician engineer
Description
• Description of the project:
– Rehabilitation and renovation of 4 treatment plants delivered in 1980, and rehabilitated in 2005.
1. Step Candle Bridge: 12000 Eq/H
2. Step Boukhalfa 25000 Eq/H
3. DRAA BEN KHEDDA Step: 25000 Eq/H
4. Step Tademaït: 13,500 Eq/H
• Description of tasks
– Equipment diagnostics in place.
o Disassembly of electrical equipment and instrumentation to be replaced.
o Collaboration in semi industrial commissioning and dismantling of electromechanical equipment and cabinets of the old technology (Telemechanics) for be able to replace with Siemens equipment and equipment.
– Contribution to the installation of various hydro-mechanical, electromechanical, electrical and instrumental equipment of the two water and mud treatment systems.
– Collaboration in the semi-industrial and industrial commissioning of the various works on two wastewater and sludge sectors of the 4/6 micro-stations.
Date
From/07/2001 to/04/2004
Lieu
Algiers
Society
ETPHB CHABANE on behalf of the client: OPGI Hussein Dey
Position
Site Technical Manager, Electrical and electromechanical maintenance and maintenance Equipment (mobile crane; tower cranes; compactors, retro-loaders, etc.)
Description
• Description of the project: building of 348 PROMOTIONAL LOGMENTS
• Description of tasks
– Maintenance and repair of rolling stock
– Verification of the conformity of the work in terms of customer satisfaction.
17. Miscellaneous (e.g. publications):
No professional publication relating to the field of activities cited.
Literature: The Protagonist of the life : Baudelaire’s edition, Lyon France,
My texts are published in several literary and poetic magazines and anthologies, namely Florilège, Etrave,
18. ATTESTATION
I, the undersigned, conscientiously certify that the above information accurately reflects my situation, qualifications and experience.
MEZIANE MAHMOUDIA