Photo

Majid Hasan Syed SENIOR INSTRUMENT TECHNICIAN

Pakistan Majid Hasan Syed
Calibrationcommissioning. RepairconstructionControl valveDocumentation. Manpower managementElectricalElectronicsHydraulicInstallationInstrumentationLoop-testingMaintenanceP-Cad Designing for PCB.Pneumaticprocurement. R and DProject Managementprototype assemblingRepairingsolderingtesting. AutoCAD designing

I have to perform very well in plant as a Senior Supervisor / Senior Instrument Technicians for 10+ years in onshore oil and gas experience operations & maintenance, very good Refinery, loop checking, pre-commissioning and commissioning on large oil & gas projects, shutdown experience, Total years of experience: 18 Years; Oil and Gas Experience is: 10Years, maintenance, repair and calibration of variety of electronic, pneumatic and electrical instrumentation, Maintenance (PM/CM) / Construction, Shutdown / Turnaround Experience in Oil and Gas, Refinery, Power, BMR, Revamp, EPF and Project Management.commissioning, start-up, construction, upgrading, and modification. I have the necessary theoretical knowledge and hands-on experience on all kinds of electrical and electronic circuitry including pneumatics controls, relay logic, PLCs. to SCADA & DCS systems. I also have experience with Onshore & Field Instrumentation. Besides I am familiar with area classification and construction code, recommendations laid down by the International Standard and Societies.

Education

1989 to 1991 Intermediate of Science (Twelve Years Study) in 1991 HSC Pre Engineering at Govt.Degree science college malir karachi

Intermediate of Science (Twelve Years Study) in 1991. Major Subject Math’s, Physics and Chemistry.

Jan 1992 to Dec 1992 One year Diploma in Industrial Electronics at Petroman Training Institute division of PERAC

One year Diploma in Industrial Electronics, from Sindh Board of Technical Education, Karachi in 1993. Petroman Training Institute division of PERAC, Karachi.

23 Oct 1994 to 29 Jan 1995. Specialized Engineering Program in Electronic Instrumentation Maintenance at Petroman Training Institute division of PERAC

Specialized Engineering Program in Electronic Instrumentation Maintenance. Held in Petroman Training Institute, from 23 Oct- 29 Jan 1995.

Experience

08 Dec 2012 to 10 July 2016 SENIOR INSTRUMENT TECHNICIAN at CC Energy Development Oman

I have joined this organization as SENIOR INSTRUMENT TECHNICIAN in commissioning to plant maintenance phase look forward and execution of PM jobs for production separator, Tank gauging system, heater treater H2S unit shipping pumps, TVP analyzer, auto grebe sampler, and BVS station. Also preparing planning of PM jobs for plant maintenance. Working with FOX India, Siemens S7 control and automation system. Designed and documentation for workshop setup including Electrical, mechanical and Instrumentation department. Tools, equipment arrangement, working & calibration benches preparation. Designed develop a database for equipment spare parts and maintenance schedule as plant requirement. Extensively involved in plant Upgrading Modification, Commissioning and New EPF Construction or Expansion.

from 14 Apr 2011 to 02 Dec 2012 SENIOR INSTRUMENT TECHNICIAN at PETROLEUM DEVELOPMENT OMAN

Plant Maintenance job in PDO YIBAL OMAN. Working as a SENIOR INSTRUMENT TECHNICIAN with Special Technical Services L.L.C. Strictly fallow Permit to work systems (PTW PERMIT HOLDER), Startup Assistant & Maintenance of Rotating Equipment such as Turbine, Compressor, Pumps, and Process related Equipment’s. Working in CCR and Field, well familiar and using PLC, DCS, PEFS, FLD, ILD such as Instrument Layouts, Instrument Hookups, Instrument JB / Marshalling / IO Termination Panel Wiring drawings, Logic Narrative, Logic Diagrams, Cause & Effect Matrix, Complex Control loops. Working on Fire & Gas System., Honeywell TDC 3000(FSC), Delta V Foundation Field, Vibration monitoring system 3500 & 3300.
On my performance, I get a chance to Standalone handling the upgrading project of five Solar Turbine Fuel Gas Seal Oil Fire and Gas System with Emerson Delta V DCS Control System, Inspection Functional Testing as Client and Commissioning Start up assistant.
SAFETY AWARENESS:
Handsome SAFETY Training (HSE and PTW system) against personal safety as well as plant safety. Safe working Procedure (According to work permits). Having Firefighting training, Special training on safety topics like H2S, Housekeeping, Firefighting, Use of Personal Protective Equipment (PPEs), Acid handling, Confined spaces, emergency handling, Noise pollution, and First Aid, etc.

01Jan 2010 13Apr 2011 INSTRUMENT TECHNICIAN at KESC THERMAL POWER STATION

SHUTDOWN JOB FOR TURBINE #2, #3, #4 AND #5.
Worked as an INSTRUMENT TECHNICIAN
Control Systems: ABB Pro Control 30 & V Five.
Control Valve Calibration, servicing activity during Yearly Overhauling of Turbine. Preventive and corrective maintenance of Instrumentation, Four Wire Pressure Transmitter, Flow Transmitter, and Typical Power Plant Temperature Loop Testing and Calibration. DCS and V Five Loop testing. Shut dawn Maintenance Call out and Startup Emergency Call out Duty.

21 July 2008 to 31 Dec 2009 SENIOR SUPERVISOR INSTRUMENT at DESCON ENGINEERING LTD

PROJECT: REFURBISHMENT 115K BPD REFINERY
CLIENT: BOSICOR PAKISTAN. (Byco: http://www.byco.com.pk/)
Contractor: DESCON ENGINEERING
As a “SENIOR SUPERVISOR INSTRUMENT”
Inspection, Refurbishment, Calibration and Job execution for the construction of 115k BPD refinery.
Inspection of instrument and equipment that remove from Gulf Refinery, Melbourne, U.K
It’s an honor to me I have played key role to establish the site facility and workshop set up for the construction of Pakistan Biggest oil refinery under the supervision of a senior manager. Activities are repair, servicing, calibration, machining, overhauling, welding, hydro-testing of control valve, PSVs, pneumatic/electro-pneumatic control panels. Manpower management and monitoring for the best output of the site facility. Designs develop the standard operation procedure and handling all jobs related activities. Dealing with vendors, suppliers, and sub-contractors.

18th Oct 2007 to 3rd Dec 2007 E&I INSPECTOR at MOODY INTERNATIONAL

PROJECT: REHMAT-3 TI-IN PROJECT
CLIENT: PETRONAS CARIGALI PAKISTAN.
Contractor: PCL (Pipe Link Construction)
As an “E&I INSPECTOR”
Inspection Monitoring and Job execution for the construction of Gas wellhead TI-IN Project in witch Installation of Intech RTU panel, Alderley Wellhead Control Panels (WHCPs), Rosecrrogien Methanol injector and corrosion inhibitor, Gas scrubber, Diesel Generator, and BP Solar panel. PSVs, Control Valve, Pressure Flow and Temperatures Inspection, Hydro testing, Calibration, Installation, Electrical/Instrument Cable Laying, Termination, Hook-up, Field Calibration, and Loop Checking.
Cable Tray, Instrument Support, Mechanical Support Fabrication, and Installation. Using P&ID and Isometric for Instrument Marking. Measurement of cable, Cable Route and Cable Tray also Tubing Measurement for Invoicing Verification.

Feb 2007 to May 2007 INSTRUMENT TECHNICIAN at FAUJI FERTILIZER BINQASIM LTD

PROJECT: BALANCING MODIFICATION REVAMPING
As an “INSTRUMENT TECHNICIAN” Modification Revamping and Construction of Benfield + LP boiler Hydrogen Recovery Unit + SYN Gas Chiller, Air Blower with Modicon PLC and Infi 90 DCS. CCR to Field Installation Termination Loop testing and Functional Testing.

Aug 2006 to Feb 2007 INSTRUMENT TECHNICIAN at DESCON ENGINEERING QATAR L.L.C.

PROJECT: QATAR GAS3&4 ONSHORE PROJECT
CLIENT: CTJV (CHIYODA-TECHNIP-JV/QGX)
Contractor: Descon
As an “INSTRUMENT TECHNICIAN”
Construction & Installation for EARLY PRODUCTION FACILITY.
Installation of Substation Cable Laying, Manpower & Job Monitoring. Loop Checking, Hock up and Field Calibration.

Apr 2006 to May 2006 SUPERVISOR INSTRUMENT at SYSTAMATIC ENGINEERING SERVICES

PROJECT: Makori I
CLIENT: MOL PAKISTAN OIL AND GAS B.V.
Contractor: PCL (Pipe Link Construction)
As a “SUPERVISOR INSTRUMENT” With SES.
Construction & Installation For EARLY PRODUCTION FACILITY, Installation of Separator, Heat Exchanger, Degasser, Scrubber, Glycol Regeneration Package, HP/LP Flare System and Gas Dehydration System. Cable Laying termination and loop testing. Generator & Lighting System Cabling, CCR Termination, PSVs, Control Valve, Pressure Flow and Temperatures TX Calibration, Hydro testing, Installation, Termination, Hook-up, Field Calibration, and Loop Checking.

10 JAN 2005 TO 28DEC 2005 SUPERVISOR INSTRUMENT at NATIONAL REFINERY LTD

PROJECT: Lube II Revamp
CLIENT: NATIONAL REFINERY LTD.
Contractor: ENAR Petrotech Services (Private) Limited
As a “SUPERVISOR INSTRUMENT” With ENAR Petrotech Services (Private) Limited.
Project Management For Installation Of Lube Oil Revamp Refining Project, National Refinery Limited. In This Project, Our Scope Is That to Installation of Sub Station Dilchill Crystallizer, Dehydrator, Rotary Vacuum Dewaxing Filter & Field / Control Room Instrumentation, Calibration, Hookup, Installation, Termination Loop testing & Commissioning.
Calibration and Hydro-testing of Control Valves with DVC Positioner. Calibration and Functional Testing of Level Switch Pressure Switch, Level-Troll, PT, FT, and TT.
Cable Tray, Instrument Support, Mechanical Support Fabrication, and Installation. Using P&ID and Isometric for Instrument Marking. Measurement of cable, Cable Route and Cable Tray also Tubing Measurements.

24 AUG 1999 to 05 JAN 2002 INSTRUMENT TECHNICIAN at KUWAIT OIL COMPANY

Working as an INSTRUMENT TECHNICIAN. With Almere Tech. Services. (ATSCO) For Maintenance Contract in Kuwait. http://www.almeer.com.kw/

Control Systems:
Honeywell TDC 3000.
ABB Advant Controller 400 Series.
Electronic gas Engine Control, Cooper-Bessemer.

Job Description & Responsibilities:
During this job, I was engaged in the following jobs.
WorkShop Experience: Calibration of pneumatic and electronic process control instruments. Cleaning, Servicing assembling, overhauling Pressure Testing of Control valve Actuators such as Glob Valve, Ball Valve, Butterfly Valves. Calibration of PT, FT, TT, and LT. Servicing of ESD Valve. Troubleshooting and repairing of microprocessor-based control or logic PCB’S.
Field Experience: Maintenance of Wellhead instruments prepared the wellhead for Rig & after that reinstallation of SCADA instruments and equipment. Commissioning of seawater injection wellhead instruments.
Process & Plant Experience: I have work on different sub-division of oil gathering centers, like gas condensate recovery (gas compressor) crude dispatch pumps (turbine-driven), crude/gas separator and oil heater. Also, work on the Ruston gas turbine of Booster station.
Prepares schematics, drawings, sketches, and reports to reflect changes or alterations. Perform all scheduled preventative maintenance as required by a plant computer maintenance management system (CMMS / MMMS).