Photo

ravisankar k Deputy General Manager Construction & Planning

Europe Africa Australia NEwZealand Canada
MS Office. Trainings:  CII EXIM – TQM AUDIT  DESIGN OF MACHINE FOUNDATION BY DR.BHATIA  RT & UT – Level II from ISNT.  PRIMEVERA – Engineers CADD center & KLG Systel.  Safety Awareness.NISA & ANSYSPrimavera.  Operating System & packages: WindowsStadd & GT Strudl  Project Management Software: MS ProjectsTechnical/System Skills:  Technical packages: AUTO CADUnix

Profile:

§  Commitment to Safety: Dealt tallest structures like Natural Draught Cooling Towers, Chimney, Transfer / Junction Towers, Bunker Bay Structure. During this period had a career record of Zero Accident. BHEL is certified for ISO 14001 & OHSAS 18001. Beyond Best Safety Practices like Usage of Safety nets, Safety permits like height, excavation, Also, implemented Execution Laydown Practice.

§  Adhering to Quality Assurance for Concrete, Soil testing, Gradation of Aggregates, Cement testing and also adhering to Field Quality Plans.

§  Involved in quality assurance of Steel Structures like sweep camber checking, weld thickness inspection, ISNT qualified NDT(Level II personal) testing evaluation like Liquid penetration testing, Ultrasonic Testing & Radiography.

§  Execution: Starts from tallest Structures like ‘Natural Draught Cooling Tower (NDCT) beyond 147mtr.  Recent 175mtr NDCT for 1x800MW Coal Fire Thermal Power Project’ at Kothgudem TPS for TSGENCO been completed in 18months record time. 275Mtr high Single & Multi Flue Chimney with Steel Flue cans/ Acid Resistance Bricks.

§  Foundations housing rotating equipment like Turbo Generator (TG ), Fans , Mills, Crushers etc.

§  Civil works for Pretreatment Plant (PTP) / Water Treatment Plant (WTP), RO-UF DM plant, Side Stream Filtration, Chlorination System, Ozonisation Bldg, Earthen Embankment & RCC Raw Water Reservoir.

§  Civil works of Effluent/Waste Water & Sewage Treatment Plant(ETP/WWTP/STP).

§  Civil works of Fossil Fuel (Coal Based / Lignite) Boiler Foundations Equipped with Alstom Pressure Parts, Electro Static Precipitator, Mill Bunker Bay, Main Power House / TG Hall, Boiler Feed Pump, Primer Air, Forced Draught, Induced Draught Fan Fdns, Mill Fdns, etc including Transformer Yard & Switch Yard with Control Room.

§  Structural Steel Fabrication & Erection including Quality Assurance of Fabrication & Erection of TG hall, Bunker Structure, Circulating Water Pump House, Boiler Structure, CHP & AHP, CW PH Sluice Gates, Screens etc.

§  Soil Stabilization using dynamic compaction, Stone Columns, Driven Cast-in-situ piles at Pradip Site, Site levelling & Grading, Pavement, Bitumen Top Roads, Cement Concrete Roads, Strom Water Drains, etc.

Civil works of Coal Handling Plant (CHP) Structure comprising Belt Conveyor/Gallery Structure, Crusher House, Wagon tippler Structure, Track Hopper, Stacker Re-claimer etc.
Total System of Ash Handling Project including Earthen Embankment Ash Pond.
Lead in Civil & Structural Steel works for combined cycle Gas Turbine Power Project like Air Cooled Condenser, Air Cooled Heat Exchanger, Gas Turbine Foundation, Gas Booster Foundation & Structure, and Heat Recovery Steam Generator Foundation etc.
Architectural works including AC ducting, Lighting System, Plumbing, Ventilation system, Fire Protection system, Service Over Head Tank, etc
Also involved in Design coordination of Coal Handling, Main Plant Structures, Non_plant Structures, Also been as Detailing Checker for the fabrication drawings prepared in Tekla /Auto Cad etc. Agency like DESEIN, Tata Consulting Engineers, Fichtner, STEAG, DCPL, Dastur & Co, L&T, PROMAC, were handled.