MUHAMMAD BILAL: Industrial and Manufacturing Engineer
Personal Information Profile Maintained By: Himself
Gender: Male
Address: House# 74, Sector 14, Block F, Street # 3, Orangi Town, Karachi, Pakistan
Email Address: [email protected]
Nationality: Pakistani
Contact Number: (+92)335-2614339
Skype: bilal42094
More about me: A smart working, reliable, enthusiastic Industrial engineering professional who has extensive professional experience of +4 years at mid management level in manufacturing industries with esteemed professional training CSSGB (Certified Six Sigma Green belt) and PMP (Project Management Professional)
Specialties: Process Improvement, Project Management, Equipment Procurement & Installation, Supply Chain, Production Planning ,CAPEX & Production budgeting .
Academics
Degree Specialization Institute CGPA / % Year
Bachelors in Engineering Industrial & Manufacturing NED University CGPA 3.3 2012-2016
Intermediate Pre-Engineering Govt. Dehli College 81% 2009-2011
Matriculation Science Islamia English Model School 82% 2009
Training & Certifications:
- PMP; Project Management Professional
- SSGB; Six Sigma Green Belt
- Lean Manufacturing
Skills
- MS Office
- Minitab
- MS Project
- SAP
- Auto Cad
- Pro E
- CATIA
- Team Player
- Problem Solving
- Decision Making
- Quantitative Analysis
- Project Management
- Method Engineering
Professional Experience
Pirani Group of Companies
(SUPER POWER MOTORCYCLE, Aluminum alloys manufacturer and aluminum die casting parts manufacturer )
Nature of Business
Manufacturer of OEM Motorcycles, Aluminum alloys making, Aluminum die casting parts
Position: Deputy Manager (Production Engineering and Planning)
Duration: (October’18 – Present)
Primary Functions: Production Engineering
- Developing of efficient systems that integrate workers, machines, materials, information, and energy to make quality product on time and meet demand.
- Maintain safety and 5’S environment by enforcing procedures, safety rules, work procedure, work instruction sheet and control plan.
- Complete capacity analysis to identify headcount, equipment and space requirements.
- Perform line balancing analysis to identify optimal staffing plans for production lines as demand fluctuates.
- Conducting Cp & Cpk study to find out the performance & health of machine and apply DMAIC approach to solve any problem found in there and take maintenance action.
- Develop machining tools ordering strategy with format, introduce new machining tools for reduction in cost and maximization in productivity.
- Manage installation and commissioning of equipment and machinery.
- Introduce and develop cost effective cutting tools.
- Contributes to team effort by accomplishing related results as needed
Production Planning:
- Monthly and daily production planning on the basis of available production capacity and market demand and issue plan to respective department.
- Perform cycle time study of each process and identify bottle neck operations so can plan accordingly and apply KAIZEN to reduce time.
- Perform process improvement activity via six sigma and lean methodology.
- To make ensure for the successful implementation of daily production target on time with good quality on the basis of sales forecast and optimize the company’s inventories & production cost.
- Set OEE target up to 85% and ensure it compliance.
- Determining manpower, equipment and raw materials needed to cover production demand.
- Revise Production Plans in event of sudden urgent orders from the sales department and ensure resource availability accordingly so that finished product is available and customer needs are timely fulfilled.
Major Projects & Achievements:
- Installation and Commissioning of Aluminum die casting plant and machining center for cylinder head and pistons manufacturing for Motorcycle – Furnace installation, installation of gravity die casting machine, CNC lathe and milling machine, setup arrange for quality inspections, design process layout with concept of muda, mura and muri.
- Creation of standardize storage facilities and FIFO arrangement for Local and CKD Store – Lay outing, calculation of racks for FIFO, stacker selection, procurement of heavy duty racks, design & fabrication of special purpose rollers rack.
- Assembly lines for Shock Absorber and Manufacturing lines for spring- Design process layout with concept of muda, mura and muri, reducing manpower, reducing production lead time by using VSM concept.
Agriauto Industries Limited (House of Habib Group)
Nature of Business: Manufacturer of OEM Automotive Parts
Position: Assistant Manager (Production Engineering)
Duration: (March’16 to October’18)
Primary Functions:
- Capex and Budgeting-Develop Capital Expenditure Budget (CAPEX), includes Investments related to Plant, Machineries and Equipment which ensures smooth achievement of production targets for existing and new products.
- Make feasibility for Investments in Production Plants and Machinery.
- Supervised mechanical design of facility, inspected layout, equipment arrangement and plant utilities.
- Plan, execute, co-ordinate and monitor project activities for the execution of CAPEX.
- Responsible for defining standard engineering principles and specifications to meet project requirements.
- Prepare quarter-wise financial monitoring report of CAPEX for board meeting.
- Prepare and present internal progress reports for weekly meetings.
Process Improvement:
- Perform Process Capability (Cp & Cpk) analysis for critical operations machines and leads the improvement projects for problematic processes through 6 SIGMA DMAIC strategies.
- Perform time & motion study, find bottle neck operation, lead time, muda, mura, muri, value and non-value activities.
- Take measures to eliminate unnecessary operation, re-layout of machines, line balancing, effective utilization of materials, machines & human resources, bring improvements in method, procedures and techniques, re-designing of trolleys and other handling equipment.
Equipment Procurement, Installation & Commissioning:
- Outsourcing and procurement of different Equipment (Machines, Tools & Consumables) from foreign/local Suppliers.
- Lead the Specialized Projects of Machine designing and fabrication with Sub-Contractors.
- Supplier Evaluation, price negotiation and ensure timely delivery.
- Layout Designing for installation of new equipment.
- Machine installation and commissioning with foreign Engineers/in-house team fulfilling all Quality & Productivity aspects.
- Create and maintain good relationships with vendors/suppliers.
- Make yearly service contract with supplier for repair & maintenance of machines and equipment.
Major Projects & Achievements:
- Creation of storage and FIFO facility for the inventory of CKD parts – Lay outing, calculation of racks for FIFO, stacker selection, procurement of heavy duty racks, stacker and fabrication of rollers rack.
- Installation of RO plant – Water requirement calculation, lay outing of pipe lines and water distribution, purchasing and subcontracting.
- Exhaust system for paint shop – Designing of duct line and water falling system, calculation for negative pressure and laminar flow to achieve dust free area.
- New Assembly for Gabriel Strut and McPherson Assembly – Lay outing, conversion of batch production into single piece, subcontracting with material.
- Development of Power Window Regulator for VIOS.
- Development of Door Impact Beam for VIOS.
- Development Shock Absorber and MacPherson Assembly for VIOS.
Affiliation: Pakistan Engineering Council (Regd. INDUS/3145)
Hobbies: Former high school cricket and badminton player, Movie buff that enjoys classic science fiction, adventure, action films, book reading, enjoy camping and hiking.
Reference: Will be furnished upon requirement