Photo

Raza Qutubuddin Production Engineer

Pakistan

Raza Qutubuddin

 

Address: Hno.124-A unit no.5, Latifabad, Hyderabad..

Mobile No:+92346-3814980

E-mail: [email protected]

Marital status: Single

Nationality: Pakistani

 

 

Career objective:

Seeking opportunity and challenges for professional and personal

growth to enhancemy abilities as an Industrial Engineer , where

my potentials are put to use for mutual benefits of all concerned.

 

 

Work Experience:

Dawlance –Arcelik group.

Engineer -Production ( March 2017 –  present)

Company’s website: http://www.dawlance.com.pk/

Meet Monthly Production Targets .

Apply lean manufacturing practices to reduce waste.

Coordinate with service departments to resolve manufacturing bottlenecks.

Decrease rework percentage and minimize scrap rate, by initiating related projects.

Conduct tack time calculations and value stream mapping.

to improve and maintain OEE (Overall Equipment Effectiveness).

Design layout for machine installations and process flow diagrams for better understanding.

Inspect plant, establish and implement preventive maintenance plans to ensure maintaining optimum performance.

Suggest designs and lead installations of new machines in accordance with safety standards.

Suggest continuous improvements to reduce cost, improve product quality and to achieve monthly production targets.

Review and track Manufacturing KPI including problem solving for negative trends or goals not met, with responsibility for the training of production employees.

Ensure and follow all procedures and documentation as per specified in ISO 9001:2015 system.

Ensures adherence to defined Standard Operating Procedures and safety standards as per OHSAS 18001 in order to support the organization in meeting its goal of minimizing LTAs.

Ensure adherence to environmental policies and standards as per ISO14001:2015 (EMS)

 

Areas of Expertise:

·     Continuous Improvement

·     Six Sigma Green Belt

·     Lean Six Sigma Black Belt (In progress)

·     Performance Management

·     Problem Solving

·     Continuous improvement

·      Gemba

·     5S &Value stream mapping

·     Root Cause Analysis

·     Process improvement and optimization

·     Autonomous Maintenance ,TPM

·     Line Balancing

·     Time & Motion

·     FMEA

·     Scheduling & Planning

·     Poka yoke

Industry Exposure

·     Wood industry

·     Wire drawing

·     Automobile

·     Process

·     Home appliances

·     Refrigeration
Dawlance – URIL

assistant manager ( june 2015 –  march 2017)

 

Pakistan Wire Industries Pvt. Ltd

assistant manager production ( September 2014 –  june 2015)

Company’s website:https://www.pwi.com.pk/

Suggest improvement in pickling process, conduct tests at different stages and align with quality department for better results

Introduce new testing methods for better quality

Prepare work instructions (WI’s) and provide training

Consult suppliers and vendors for any problem

Evaluate performance of different suppliers

Take follow ups from procurement department for material availability

Device a product manufacturing profile (PMP) for every product that include every specific detail and SOP’s regarding its production.

Manage and monitor the operation of the plant and provide preventive maintenance schedule in coordination with maintenance department

Propose design and alterations in machines in accordance with safety standards, prepare proposal for approval and lead its execution.

Establish quality control standards and procedures and ensure strict adherence to those standards

Eliminate the bottle necks of production

Analyze workforce utilization, facility layout, operational data and production schedules to determine optimum worker and equipment efficiencies

Conduct internal audits as per the specifications of ISO 9001-2015

Coordinate with Sales Managers & procurement officers to apply effective modification on production plan for timely production of special orders or promotional items.

Sunlight Wood Products Pvt. Ltd.

Production Engineer( March 2013-August 2014)

Company’s website:http://www.sunlightwood.net.pk/

·       Lead identification of manufacturing problems, equipment issues and eliminate waste.

·       Design and modify equipment to resolve manufacturing bottle necks.

·       Implement Kaizen, develop processes that lower operating costs and increase efficiency.

·       Evaluate production activities for better resource utilization.

·       Implement, monitor, and maintain a clean, organized department through 5S activity.

·       Assist with generation and report out of weekly/monthly reports with targets.

·       Ensure abrupt changes in production planning are communicated clearly and executed smoothly on the production floor.

·       Establish and adhere to Standard Operating Procedures and safety standards.

·       Develop effective operational strategies and implement best practices

·       Plan and schedule maintenance activities to ensure optimum performance and coordinate for any design update and improvement.

·       Design testing method and coordinate   with   Quality   Control   regarding   granulometry   of   wood   chips, internal   bonding, gelation time and quality of production to ensure timely and appropriate solutions are adopted.

·       Complete design and development projects by training labor & Supervisors to ensure better performance.

 

 

Projects
Productivity enhancement by elimination of root causes, eradication of quality defects in chip board through detailed analyses of raw material properties and granulometry reports, the project also ensured maintaining minimum WIP (Work in process) inventory by application of JIT (Just in time) Technique.

Improve pickling process, increase productivity and diversify product range for getting surface finish in drawn wire and to increase the life of dies used in wire drawing process (minimize die change over).

Increase the production capacity from 83 units/hour to 120 units/hour and to maintain this productivity after introduction of  new R600A designs.
Trainings & courses
Supply Chain Planning & Material Management in SAP ERP by IBA-Karachi.

Productivity Tools & Techniques (Basic) by APO (01 May-30 September 2016)

Productivity Tools & Techniques (Advanced) by APO (01 May-30 September 2016)

Organized and Participated, one day training program on “Quality Management Tools/Techniques” in collaboration with NPO (17 April 2012).

Organized and participated, one week course on uni-graphics cad NX 6.0 in collaboration with KTDMC (26 September 2011-October 2011).

Participated in Student Engineering Exhibition 2011 held by PAF-KIET.

Organized one week course on “MS Project” by ISO (4April-9April 2011).

Participated in one day training program on “Total Quality Management” by NPO.
Skills and interests:
Computer Skills:
SIX SIGMA methodologies (Green Belt Level)

Good technical knowledge.

Capable of designing new mechanisms and  having Interest in innovations for betterment.

Excellent report writing and presentation skills.
MS. Office

MS-Project

Uni-Graphics CAD  NX (6.0)

Catia

SAP ERP

AutoCAD

Primavera
Academics
Examination
Year
School Attended
Group
Grades
Industrial &Manufacturing Engineering
2014 -2017
NED University of Engineering & Technology
M.E
A
Industrial Engineering & Management
2009-2012
Mehran University of Engineering & Technology
B.E
74.25%

1st Div
HSC
2008
College Of Excellence For Boys
Pre-Engineering
A

77.27%
SSC
2006
St: Bona Ventures High School
Science
A+

81.88%
References:Will be provided on demand.