LAND SURVEYOR / SITE ENGINEER
CURRICULUM VITAE
PERSONAL DATA
Name : JOEL D. VELASCO
Present Address : 91 Iba, Silang, Cavite, Philippines
E-Mail Address : [email protected]
Mobile No. : +63906 5256575
Nationality : Filipino
Date of Birth : 13th March 1964
Place of Birth : Bayombong, Nueva Vizcaya, Philippines
Sex : Male
Civil Status : Married
Height : 168 cms.
Weight : 75 kgs.
Religion : Christian
Spouse : Rosalinda P. Velasco
EDUCATIONAL BACKGROUND
DEGREE EARNED SCHOOL YEAR TAKEN
Elementary Bayombong South Elementary School 1971 ~ 1977
High School Nueva Vizcaya General Comprehensive High School 1977~1981
College Technological Institute of the Philippines (B.S. in Civil Engineering) 1981 ~ 1985
EXAMINATION TAKEN
Name of Examination Date Taken Rating
Civil Engineer’s Board Examination May 28 ~ 29, 1986 75%
SHORT COURSES & TRANING ATTENDED
Name of Course & Training Date Taken
Basic Programming Course September 01 to October 15, 1988
Lotus 123 / Symphony / Quattro October 20 to November 19, 1988
Introduction in Dbase III+ / FoxBASE+ May 02 to 31, 1990
Programming in Dbase III+ / FoxBASE+ June 11 to 15, 1990
Auto Cadd October to November 2009
Construction Safety Orientation Course October 6-7, 2013
Building Construction Supervisors Safety Course February 2, 9, 16 & 23, 2014
Construction Occupational Safety & Health (COSH) February 3, 10, 17 & 24 2019
WORK EXPERIENCES
1. Name of Company : Asia Structural Developer Corporation
Name of Project : 6-22 Storey Residential Condominium with Roof Deck
Address : Marina, Paranaque City, Philippines
Position : Chief Land Surveyor cum Site Engineer
Duration : 5 July 2017 to Date
Job Description : Establishing vertical and horizontal control points to be use in the whole project site by using Total Station and Automatic Level Machine. Setting-out locations and designed elevations for excavation and finished levels of foundations, columns, tie beams, beams and slabs. Setting-out locations of Pile Caps and marking its cut-off level for all Concrete Piles. Setting the blinding and casting levels of all Pile Caps. Setting-out locations and grid lines for all columns, walls, lift walls, retaining walls, partition walls and stairs layout. Setting and marking also one (1) meter offset from the Finished Floor Line prior to all finishing works. Setting-out all the finishing works including Tiling layout works, Doors & Windows. Replication the survey setting-out and the elevation markings from ground Floor up to the Roof Deck of the building. As built survey and other survey works as required by the project manager. Supervision of all carpentry and rebar works including all the sub-contractors activities. Supervision of all site work activities including concreting works.
2. Name of Company : Self Employed
Name of Project : Construction of Residential Housing / Land Surveying
Address : Silang Cavite, Philippines
Position : Private Contractor / Land Surveyor
Duration : January 16, 2016 to June 30, 2017
Job Description : Designing Plans and constructing Residential Houses including Concrete Fences. Surveying of Private Land Properties this includes Relocation, Lot Subdivisions of the Land Property and Titling.
3. Name of Company : Loh & Loh Construction Pte. Ltd.
Name of Project : Chevron Oronite Pte. Ltd. Carboxylate Project-Civil Works
Address : No. 21 Sakra Road, Jurong Island, Singapore
Position : Land Surveyor
Duration : 2 July 2015 to 15 December 2015
Job Description : Setting-out of all control points to be used in the whole project. Setting-out locations, excavation levels and finished levels of pipe rack foundations, pipe sleepers, pipe supports, sump pits, drain valve pits and other kinds of manhole. Setting and checking the alignment and levels of anchor bolts for the pipe rack foundations. Setting-out the location and setting all the required levels in the construction of Cooling Tower for its foundations, columns, beams, slabs, concrete walls and anchor bolts and also setting-out the locations and levels for all embedded pipes. Prepares all necessary survey reports of any structures and submit to the Quality Control Department for the final inspection before concreting. Taking as-built survey and do the as-built report of all structures. Help in the supervision of workers for some activities in order to follow the survey requirements for the works.
4. Name of Company : Soil Build Pte. Ltd.
Name of Project : Proposed Public Housing-Development Comprising 9 Blocks of 13-Storey Residential building (Total 1294 Units), 1 Block of Commercial Building, 2 Blocks of MSCP / ESS / Communal Facilities & Precinct Pavilion
Address : Yishun Avenue 4 / Yishun Ring Road, Singapore
Position : Land Surveyor
Duration : 17 November 2014 to 31 May 2015
Job Description : Establishing control points (Coordinates and Elevations) to be used for the whole project by using Total Station and Auto Level. Setting-out locations of Pile Caps and marking its cut-off level for all Concrete Piles. Setting the blinding and casting levels of all Pile Caps. Setting-out the locations and grid lines for all columns, walls, lift walls, household shelters, stairs and after the casting of these structures, setting and marking also a one (1) meter offset from the Finished Floor Line. Setting-out all the finishing works including Tiling layout works. Replication the survey setting-out and the elevation markings from first Floor up to the Roof Deck of the building. As built survey and other survey works as required by the project manager.
5. Name of Company : Sumitomo Mitsui Construction Corporation
Name of Project : Lanxess PBR NdBR Singapore Project
Address : Jurong Island, Singapore
Position : Site Engineer cum Surveyor
Duration : October 3, 2013 to October 22, 2014
Job Description : Supervision of all site activities including all our sub-contractors. Supervision in the fabrication of form works for the foundation, concrete columns, beams, slabs and staircase formworks and in the installation of rebars. Supervision in the concreting works of all the said structures. Supervision of all finishing works like installation of Doors and Windows, brick works, Dry Wall Partitions, Ceiling Works and all the Tiling works. Prepare daily activities and a Request for Inspection with the Consultant’s Representative and ask for their approval for any work to be done like casting of concrete and concrete plastering to mention a few. Do Survey Works i.e. setting out of all structures, foundations, columns, walls, stiffener columns, beams, anchor bolts, location of doors and windows, wall partitions, tile works setting out, setting out of RC Drains, Box Culverts, Road setting out, Road Kerbs, fence and any other structures that needs survey works setting out and elevations. Provide reference level or elevations for excavation, blinding levels, foundation levels, structural and finishing levels of grade slabs and suspended slabs, and all other finishing works that needs elevation reference. Establishing control points Coordinates and Elevations in every area and every Floor Level for reference.
6. Name of Company : Kharafi National (Abu Dhabi, U.A.E.)
Name of Project : ADNEC Phase 4 – Capital Center – Roads, Infrastructure & Landscapes
Address : ADNEC, Abu Dhabi, U. A. E.
Position : Land Surveyor
Duration : February 1, 2011 to June 28, 2012
Job Description : Establishing control points (Coordinates and Elevations) to be used for the whole project by using Total Station and Auto Level. Coordinates and levels computation of pipe lines for their excavation and pipe laying. Setting-out Chilled Water pipe lines, Storm Water pipe lines, Sewer pipe lines, Irrigation pipe lines, Gas pipe lines, Telecom pipe lines including all their manholes and also Electrical Lighting pole foundations for their excavations and pipe laying. Layout these said pipe lines & foundations and setting their elevations & locations as per on the approved or revised drawing plan then prepare survey reports for the checking and approval of the Quality Control Engineer together with the Consultants Engineer. Setting-out road locations and setting the limit of excavation and their excavation levels. Setting levels for road base coarse, road finished levels and kerb stone top levels.
7. Name of Company : Kharafi National (Abu Dhabi, U.A.E.)
Name of Project : Sewage Treatment Boot Project- ISTP (Waste Water Treatment Project)
Address : Al Wathba, Abu Dhabi, U. A. E.
Position : Land Surveyor
Duration : July 16, 2008 to January 31, 2011
Job Description : Topographic survey of the whole project site. Establishing control points to be used in the whole project by using Total Station. Checking all survey layouts, elevations and plumbness done by our subcontractors before the execution of any works. Setting-out the location and required elevations for the different structures of the project for its excavation and backfilling. Setting-out perimeter boundary of a certain structure, the location of footings, columns, walls, grade beams, beams, grade slabs and suspended slabs, stairs, lifts, trenches, manholes, sump pits, floor drains, pipe sleeves and others that requires survey works then checking its elevations and plumbness before concreting. Setting-out of roads, pipe lines, electrical and instrumentation cable lines and setting their excavation levels. Computation of coordinates, levels, invert levels and volume of earthworks of all the above mentioned. Prepares survey reports of any work to be concreted, excavated and backfilled. Take as-built survey of any structure that was finished and prepares the as-built report.
8. Name of Company : Kharafi National (Dubai, U.A.E.)
Name of Project : Dubai World Central International Airport (Phase 1) Central Utility Complex 1& 2
(Erection for 4 Nos.-Airfield Steel Water Tanks)
Address : Jebel Ali, Dubai, U.A.E.
Position : Land Surveyor
Duration : February 2, 2008 to July 15, 2008
Job Description : Setting-out of all control points to be used in the project. Setting-out locations of Airfield Water Tanks, setting and rechecking its levels & plumbness in every course erected. Setting-out locations, plumbness & levels of structural steel pipe columns located inside the tanks, drain sump pits and different locations of pipe nozzles to be installed around the tank and on the top roof of the tank. Make markings inside & outside of the tank for the location of steel ladders and around the rim of the tank for the locations of rafters. Checking elevations around the tank before the filling of water and at 25%, 50%, 75%, 100% and after 24 hours of holding the water to check for the final settlement of the tank. Do other survey works for plumbing, electrical and for civil works that are needed as requested by my Construction Manager.
9. Name of Company : Kharafi National (Kuwait)
Name of Project : Facility Upgrade and Relocation of Underground Process Piping for GC-8 of Kuwait Oil Company
Address : Al Ahmadi, Kuwait
Position : Land Surveyor
Duration : December 12, 2006 to February 1, 2008
Job Description : Topographic surveys, as-built surveys, setting-out of all control points to be used in the project. Setting-out locations, excavation levels and finished levels of pipe rack foundations, pipe sleepers, pipe supports, sump pits, drain valve pits and other kinds of manhole. Setting and checking the alignment and levels of anchor bolts for pipe rack foundations. Setting-out different locations of Reinforced Thermosetting Resin Pipe (RTRP) pipelines and setting its excavation levels for the piping layout. Prepares all necessary survey reports of any structures and submit to the Quality Control Department for the final inspection before the concreting. Setting-out different locations for the trench excavation of instrumentation and electrical cable laying. Compute the center line coordinates of every station required and its offsets in both sides for the construction of roads and set it out on the site. Setting levels in every station for the excavation or backfilling for the sub-grade, base coarse and for the final finished level. Help in the supervision of workers.
10. Name of Company : First Kuwaiti Trading & Contracting W.L.L.
Name of Project : Facility Upgrade and Relocation of Underground Process Piping for GC-11 of Kuwait Oil Company
Address : P.O. Box 480 Al-Souk Al Dakhli-15255, Kuwait
Position : Senior Surveyor
Duration : November 28, 2005 to Sept. 17, 2006
Job Description : Topographic survey, as-built survey, setting-out of all control points to be use in the project. Setting-out location of pipe rack foundations, pipe sleepers and slit trenching for excavation. Setting and checking the alignment and levels of anchor bolts for pipe rack foundations. Provide information for the redesigning of structures if there are obstructions encountered on the actual location of the proposed pipe racks and pipe sleepers such as the elevation, coordinates, and size of pipes, cables, electrical post, etc. In Road Works, computes the center line and both sides coordinates for every station required and set it out on the site and setting its level for excavation or backfilling for sub-grade, base coarse and its final finish level. Prepares all the necessary supporting paper works, computations and survey reports then submit it to the Project Engineer before the concreting of any structures and for filling purposes. Helps supervise workers for some activities that involves in the surveying works.
11. Name of Company : Al Muftah Contracting Company
Name of Project : General Head Quarters Building, Qatar Petroleum Project
Address : P.O. Box 875, Doha, Qatar
Position : Land Surveyor
Duration : December 21, 2004 to September 30, 2005
Job Description : Topographic surveys of various projects. Setting-out of all control points needed in the project. Setting-out of all gridlines and elevations of footings, columns, lifts and walls for its excavation and concreting. Setting levels for the concreting of footings, tie beams, columns, walls, grade slabs suspended slabs and screeding levels for the finishing works for tiling and carpeting works. Tiling lay-out for all floors, toilets, pantries, & for all areas that needed design layout in tiling works. As built surveys, supervising workers and acting as supervisor. Road setting-out and setting its levels for sub-grade, base coarse, and road finish levels.
12. Name of Company : National Mapping and Resource Informatio Authority
Address : Lawton Avenue, Fort Bonifacio, Makati City, Philippines
Position : Remote Sensing Technologies II
Duration : April 08, 2003 to November 30, 2004
Job Description : Conducts reconnaissance, boundary and interior surveys in the implementation of Land Classification, Mangrove Swamp Zonification, and related surveys. Classifies and delineates lands as to suitable use, prepares land classification maps, monitors projects, and conducts validation activities. Establishing concrete monument as the indicative boundaries between the Classified Forest Lands and Alienable or Disposable Areas. Plots individual survey notes, trace and complies same and prepares preliminary complication maps of the land classification project area. Prepares summary, charts, tabulations or surveys and related data obtained in the implementation of land classification / Swamp Zonification survey. Assist the Chief of Party to prepare reports of completed projects, accomplishments and disbursements reports.
13. Name of Company : Sumitomo Construction Co. Ltd.
Name of Project : Nationwide Air Navigation Facilities Modernization Project Phase-III
Address : Air Transportation Office Compound MIA Road cor. Ninoy Aquino Ave. Pasay City, Philippines
Position : Surveyor
Duration : March 2000 to August 17, 2002
Job Description : Topographic surveys, setting-out of all control points to be use in the project. Setting-out center line of roads and setting its offsets in both sides for the excavation or backfilling and setting its levels for the sub-grade, base coarse and road finish levels. Layout all gridlines for building and locations of footings for retaining walls, riprap walls, and set elevations for its excavation and for concreting. Setting-out locations & elevations, checking the alignment and plumbness of columns, beams, elevators, grade slabs suspended slabs and roof slabs before the pouring of concrete. Setting locations, elevations and other markings needed for all kinds of finishing works. Setting-out locations and compute the volumes of cut & fill of roads and other volumes of excavations for Building Works, Drainage, Sewer, Electrical & Telecom Cable Laying Works.
14. Name of Company : Tokyu Construction Co., Ltd.
Name of Project : Ninoy Aquino International Airport ( NAIA II ) Development Project
Address : MIA Road, Pasay City, Philippines
Position : Surveyor
Duration : June 1997 to May 1998
Job Description : Establishes control points and markings needed in the project and responsible in taking care of these points for the setting and resetting markings. Establishing elevations check locations, plumbness of columns, concrete slabs and walls, CHB walls and partition walls of the project. Setting locations, elevations and other markings needed for all finishing works such as aluminum frame windows, marble walls, and floorings, ceilings and tile works and for other works of the project.
15. Name of Company : Self Employed
Name of Project : Construction of Residential Housing
Address : Silang Cavite, Philippines
Position : Private Contractor
Duration : December 1996 to April 1997
Job Description : Designing Plans and constructing Residential Houses.
16. Name of Company : PIDCO Structures International
Name of Project : Construction of Semi-Conductor Office Building
Address : Presidential Avenue, Sucat, Paranaque, Metro Manila
Position : Project Engineer
Duration : January 1996 to November 1996
Job Description : Work supervision of all projects assigned. Prepares
PERT/CPM and bar chart of the project, computes bill of materials, make weekly progress report and semi-monthly progress billing of the projects. Assists the engineering manager to compute and make the cutting list of other structural steel project and to compute the bill of materials, labor cost, and the grand total project cost for tendering Company’s project.
17. Name of Company : Thong & Thong SDN. BHD.
Name of Project : Kampung Rimba Housing Infrastructure Rehabilitation Project
Address : 2nd Floor Bangunan Halimatul Saadiah Gadong, Brunei, Darussalam
Position : Site Engineer
Duration : October 1993 to September 1995
Job Description : Supervision of all site activities such as giving and setting the designed invert and finished levels for R.C. drains, box culvert, sewerage manholes, water and telecom manholes. In road works, setting-out the locations and elevations for the excavation or backfilling and also for the sub-grade levels, sub-based, base-coarse and its road finished levels. Computing the road finished levels for every chainage based on the designed gradient. Redesigning drainage and sewerage profiles based on the existing ground levels and distances. Prepare all the necessary supporting paper works and its computations. Compute the areas and volumes of cut and fill and the materials to be used in the construction. Do some drafting works.
18. Name of Company : Self Employed
Name of Project : Construction of Residential Housing
Address : Silang, Cavite, Philippines
Position : Private Contractor
Duration : August 1992 to September 1993
Job Description : Designing Plans and constructing Residential Houses.
19. Name of Company : Forestry Development Center at University of the Philippines
Address : Los Banos, Laguna, Philippines
Position : University Research Associate II
Duration : June 1989 to August 1992
Job Description : Computer operator, survey works, making a research Project works, mapping, and cartographic works.
20. Name of Company : Zeta Beta Rho Mussaenda Foundation
Name of Project : Watershed National Park
Address : Caranglan, Nueva Ecija, Philippines
Position : Civil Engineer / Cartographer
Duration : July 1987 to April 1989
Job Description : Construction of roads and buildings and other Infrastructures such as box culverts, impounding water structures and rip rapping. Make Forestry Maps and other cartographic works.
21. Name of Company : Manila Seeding Bank Foundation, Inc.
Name of Project : Reforestation Project
Address : Dupax del Sur, Nueva Vizcaya, Philippines
Position : Assistant Survey Team Leader
Duration : June 1986 to May 1987
Job Description : Actual ground survey of proposed plantation, road construction and other infrastructure construction. Help the survey team leader to prepare the road plans, and profiles and other supporting paper works.