SUMMARY OF QUALIFICATIONS
· Work experience as an electrical engineer for more than 8 years and field service & sales support engineer for 2 years.
· Working experience with engineering design and construction activities.
· Familiar with engineering practices, codes and international standards requirements, calculation methods, and design details. (I.E: NFPA-70 – IEC or International Electric Code, NFPA-70B, Australian Standard AS/NZ.).
· Overseas assignment for request at the coal terminal expansion project at the engineering division team as an electrical & instrument designer.
HIGHLIGHTS
Certificate of achievement for the success of the contribution of the ferronickel plant expansion project by PT.Antam Tbk (Indonesia).
Is focus in the natural gas infrastructure development, natural gas transportation, renewable energy and independent power producer project.
Project:
1. CNG Gas Fired Power Plant 200 MW Project, Riau – Indonesia
Client: PT.PLN (Persero)
2. Solar Power Generation Well site Facility Project, South Sumatra – Indonesia
Client: ConocoPhillips Ltd.
3. Waste Water Treatment Plant Project, Karawang – Indonesia
Client: ABC Kraft Heinz
4. Jetty Conveyor Facilities Project, Lampung – Indonesia
Client: PT.PLN (Persero)
The EPC Company’s experience in the Engineering design, Installation and Commissioning of Instrument and Electrical systems, for Mining industries.
Project:
1. Tujuh Bukit Upgrade Cooper and Gold Smelter, East Java – Indonesia
Client: PT.Bumi Suksesindo
2. Crushing Plant Coal Project, South Kalimantan – Indonesia
Client: PT. Adaro Indonesia
This Company for heavy industrial and mining applications. Especially for the mining and mineral processing industry, power plants, cement, and steel.
Is a subsidiary of Leighton Contractors International and is a construction engineering company and mining service provider in Indonesia.
Project, PT. Freeport Indonesia Tembaga Pura Papua province, Indonesia:
1. MP72-Super Block Building Facilities.
2. MP72-Ware House Office Building Facilities.
3. MP74-Crusher Office Building.
Project, South east Sulawesi province, Indonesia (Team Expansion Project Ferronickel Plant):
1. 2×30 MW Coal-Fired Power Plant.
2. Line-4-Ore Preparation Process (involved in the commissioning team).
3. Off Gas Treatment ESF 4 of Ferronickel Plant.
4. Oxygen Plant
5. Jetty Coal Conveyor & Facilities
6. Ladle Furnace (involved in the commissioning team).
7. FeNi Halmahera Transmission Line 20kV, Buli – East Halmahera.
8. Internal Design Furnace for ferronickel.
Aurecon is an engineering, design and advisory company.
The consulting, information technology, engineering, and project and construction management to the mining, metallurgical, manufacturing, energy and infrastructure industries.
Project:
1. Abbot Point Coal Terminal, QLD X80 Expansion Preliminary Engineering
2. Abbot Point Coal Terminal, QLD X25/X50 Expansion
3. Dalrymple Bay Coal Terminal, QLD 7th Stage Expansion
Project:
1. Belgian Loan IV Project 150/66/20kV Substation, Sulawesi- Indonesia.
Client: PT.PLN (Persero) Tbk, Indonesia.
2. Mobile Skid Mounted 12.5/15MVA, 33/11kV Substation.
Client: Tanzania Electric Supply Company Ltd. (TANESCO), Tanzania.
3. 132/33KV Substation.
Client: Meghna Engineering Works Ltd, Bangladesh
4. Mobile Substation Transformer 220/63-31.5kV, 40MVA
Client: Sonelgaz Electricity Company Ltd, Algeria.
5. 2 x Mobile Substation Transformers 132/66/23.3-11.7kV 33MVA
Client: Western Power, Australia.
6. North Duri 115KV Substation.
Client: PT. Chevron Pacific Indonesia