RONNIE A. TAVAS
Email address: [email protected]
Cellular No.: +639209498207
Career Objective: Desire a position that will allow me to use my skills in the field of implementation & management for Electrical and Telecommunication in an organization that provides a balanced work-life environment.
Strengths:
– Qualified professional with 12 years extensive experience in Electrical / Telecommunication (OSP) implementation and management.
– Can perform equally effective skills in testing & commissioning, electrical and outside plant design, right of way facilitation, safety and quality standard.
– Fast-learner and dedicated in delivering team success and client satisfaction.
Additional Skills:
– Implementation, Reporting, Coordinating, Design, facilitation
– Proficient in the following:
– MS Office Applications (Word, Excel, Power Point)
– Email Writing
– Test equipment manipulation and Actual hands on
– PLC, Electro Pneumatics and Ladder diagram knowledgeable
Professional Experience:
Feb 07, 2011 to Present, Design Head, Cignal TV Inc., 8/F Net One Bldg Global Bonifacio Taguig City
Major Function:
Responsible for end to end planning, organizing, implementing, monitoring and reporting of facility provisioning activities in support of delivering customer commitments by the Institutional Sales team.
Duties and Responsibilities:
1. Closely monitor and supervise implementation of facility provisioning to customers to meet commitments and management expectations: timeliness, budget and technical specifications.
2. Manage efficiently and effectively multiple projects at one time.
3. Demonstrate efficient use of resources to complete projects and deliver customer commitments.
4. Demonstrate advanced technical knowledge on inside cabling requirements of customers.
5. Demonstrate working technical knowledge on the provisioning of pay TV services.
6. Liaise with support teams to ensure timely completion of all facility provisioning requirements to meet customer commitments.
7. Liaise with technical teams of customers to develop and implement the appropriate technical solution to deliver pay TV services to Institutional accounts
8. Demonstrate working knowledge on the products and services of the company.
9. Develop and maintain cordial relationships with internal and external customers.
10. Identifies and analyzes potential problems and provides possible corrective actions in a timely manner.
11. Conduct post project meetings to evaluate and discuss process improvements and the like with the team and solicit support.
12. Submit timely reports on project status and the like.
13. Completion of other tasks, special projects that may be assigned by Immediate Superiors as needed.
March 2009 to Present, OSP Project Manager, Wildcat / Underground Technologies, Ermita Philippines
Job Description:
– Direct reporting to Operational Manager. Responsible for Project Management and Implementation of outside Plant Telecommunication facilities (Supervision Underground works).
Duties and Responsibilities:
– Conduct joint site survey with Client and Subcontractor.
– Evaluate the composition of soil to establish what type of UG equipment needed.
– Daily site supervision and inspection to ensure the construction should be in accordance with the standards and safety practices.
– Reviews of all plans, technical specifications, design etc.
– Ensure compliance of the requirements of the drawings and specification. Observe in detail all the works in progress.
– Coordination and securing permits and other necessary documents especially during the start of construction works.
– Monitoring work accomplishment, and workmanship.
– Conduct and preside weekly coordination meeting with Subcontractor.
– Prepare necessary documents such as weekly report, Materials Inventory etc.
– Implement safety construction program for conformance with regulatory laws and project guidelines.
– Conduct testing and commissioning such as Power meter, OTDR, Continuity, Insulation test, Unbalance & Loop Resistance, Concrete test and Grounding test.
– Check / evaluate Subcontractors billing.
– Do other related works.
2007 to March 2009, Outside Plant Engineer, Globe Telecom, Makati Philippines
Job Description:
– Direct reporting to Project Manager. Responsible for Project Management and Implementation of outside Plant Telecommunication facilities (Underground and Aerial installation of Fiber Optic Cable).
Duties and Responsibilities:
– Conduct joint site survey with contractors.
– Check material estimate, implementation schedule submitted by contractors.
– Daily site supervision and inspection to ensure the construction should be in accordance with the standards and safety practices.
– Reviews of all plans, technical specifications, design etc.
– Ensure compliance of the requirements of the drawings and specification. Observe in detail all the works in progress.
– Coordination and securing of proper permitting and other necessary documents especially during the start of construction works.
– Monitoring work accomplishment, and workmanship.
– Conduct and preside weekly coordination meeting with contractors.
– Conduct joint inspection and quantity survey with contractors.
– Conduct Pre delivery inspection with the suppliers/vendors.
– Prepare necessary documents such as weekly report, Owner Supplied materials request etc.
– Coordinate with the supplier regarding requirements of the projects and verifies order as per specification.
– Implement safety construction program for conformance with regulatory laws and project guidelines.
– Conduct testing and commissioning such as Power meter, OTDR, Continuity, Insulation test, Unbalance & Loop Resistance, Concrete test and Grounding test.
– Conduct joint inspection for acceptance with the Operational & maintenance department and prepare punch list.
– Check / evaluate contractors billing.
– Do other related works.
2004 to 2007, Electrical Head, Vazbuilt Phils., Quezon City Philippines
Job Description:
– Directly reporting to Construction Manager. Responsible for Project Management and Implementation of awarded Electric Project (Housing and Industrial Project).
Duties and Responsibilities:
– Check and review Plan and Specification prior to project implementation.
– Conduct Pre-construction meeting with client and subcontractor.
– Evaluate Plan especially on Load computation, Re design if necessary.
– Prepare material take off and estimate.
– Prepare bar chart for project implementation schedule.
– Material delivery monitoring to coincide with the bar chart activity.
– Site inspection / Supervision to ensure plans and specification are follows.
– Prepare work change including material estimate.
– Perform Testing and Commissioning on the following test parameters such as: insulation test, grounding test, continuity test, unbalance and balance test, resistance test and etc.
– Perform trouble shooting for any defective circuit such as: open circuit, short circuit, grounded circuit and etc.
– Check / evaluate sub-con billing.
– Prepare weekly reports and attend weekly meetings.
– Directly reporting to Project manager for the status of project.
– Do other related works.
1997 to 2004, Site Supervisor, Comsys Phil’s., Mandaluyong Philippines
Job Description:
– Directly reporting to Construction Manager. Responsible for Project Management and Implementation of any awarded Telecommunication and Security system Project (Underground cable, Aerial cable, Cellsite Tower erection and Electrical works).
Duties and Responsibilities:
– Conduct joint site survey with client to validate the ideal route and installation.
– Prepare material estimate for purchase order request.
– Prepare implementation schedule, Bar chart, Bill of materials and Quantities.
– Secure required permits from the Government institution such as: DPWH, Municipal / City Engineering office, Barangay and etc.
– Daily site supervision and inspection to ensure the construction should be in accordance with the standards and safety practices.
– Monitoring work accomplishment prior to weekly submission of report.
– Conduct joint inspection and quantity survey with client.
– Perform testing and commissioning for the following test parameters such as: OTDR testing and Power meter testing fiber optic; continuity test, insulation test, loop resistance test, unbalance test and transmission test for Copper cable.
– Perform testing for the Concrete and Rebar sampling such as: stress test and breaking test for Rebar, break load test for Pole and Concrete pavement sampling.
– Prepare necessary documents such as work change; redline drawing, electrical acceptance test result, Bill of Quantity and etc.
– Client coordination for billing facilitation.
– Check / evaluate sub-con billing.
– Do other related works.
1996 to 1997, QA / QC Engineer, Young Shin Phil’s., Cavite Philippines
Job Description:
– Directly reporting to QA and QC manager. Responsible for inspection of Incoming and Outgoing product.
Duties and Responsibilities:
– Inspection of incoming and outgoing product.
– Check the result and reports of inspection.
– Evaluation and Analysis of product rejected by the customers.
– Evaluation and Analysis of samples submitted by contractors.
– Preparation of samples of a new product.
– Preparation of working chart and specification.
– Preparation of design fixtures for reliable testing.
– Perform parameter testing such as: insulation test, hi pot test, open and short circuit.
– Perform other related works.
Education:
Don Mariano Marcos Memorial State University
Bachelor of Science in Electrical Engineering, 1996
S.Y.: 1990-1996 (BS Electrical Engineering)
Referees:
– Engr. Jon Antonio Diomampo, Department Head, Globe Telecom
– Engr. Vergil Bargola, Project Manager, Globe Telecom
– Engr. Ciriaco Cruz, Project Manager, Globe Telecom
– Engr. Elie Dulin, Construction Manager, UTECH Phil’s.
– Engr. Imigdio Ilagan, Construction Manager, Vazbuilt Phil’s.
Personal Information:
Birth date: April 12, 1971
Civil Status: Married
Number of Dependent: Two (2)
Email Address: [email protected]
Mobile Number: +639261897214
Religion: Born Again Christian
Ronnie A. Tavas
Applicant