SONNY BOY D. BALAJONDA
ELECTRICAL ENGINEER
Permanent Address: #142 Sampaguita St. Villa Ofelia,
Cabanatua City, Nueva Ecija, Phillippines
Mobile No.: +63 9473768160
Email: [email protected]
STRENGTHS:
v Strong Overall Technical Skills
v Project Management Skills
v Good Leader and a Team Player
v Able to work in a multi-discipline and multi-cultural environment
SUMMARY OF EXPERIENCE AND QUALIFICATION:
With 10 years of thorough combined experience in Electrical and mechanical construction and maintenance projects in power plant, hotel, buildings, cement and other minerals.
Project Engineering and Management experience as follows:
v Management of engineering contractors.
v Conduct weekly meeting with the contractor and clients to coordinate the list priorities and sequence of works.
v Make a presentation to overview the scope of works and preparation ahead of time.
v Evaluate and thorough check the scope of works on site to ensure the quality of works and safety standard during execution of the project.
Engineering experience in electrical works:
v Supervision for installation of all electrical works in Power Plant, hotel and restaurant, building, warehouse, temporary facilities, cement and other industries.
v Review the electrical drawings, mechanical and civil works before execute the works.
v Supervision for installation of transformer, grounding system, substation, switchgear, MCC panel, Fire alarms system and other auxiliaries.
v Supervision for installation of electrical conduit, cable tray for power and instrumentation cables, pull boxes and manholes on main feeder lines on the ground.
v Estimate the quantity of electrical conduit, cables and other consumables required on the project.
v Supervision for installation of grounding system, cable pulling and termination for power cables, control cables, and instrumentation cables, LAN cables, Telephone cables and other auxiliaries.
v Conduct loop check that all cables are properly terminated according to the load schedule, circuit breaker, terminal block on MCC and make sure that all terminals are tightening properly.
v Check the bus bar installation and use torque wrench on bolts to ensure that all bolts connection are tightening properly.
v Conduct insulation test, grounding resistance test, resistance test of all cables, bus bar insulators, check the voltage and amperes load to MCC, meter center, and other location to ensure that all electrical works are in good condition.
v Attend coordination meetings to the clients and project management team to raise some issues and other concern to eliminate conflict on the entire construction team.
v Planning and make schedules to distribute manpower on different activities to meet the goal schedule required on the project.
v Make a proposal in case of some changes and additional work on site.
v Make a tool box meeting to raise the daily safety exercises, sequence of works and other concerns.
Engineering experience in mechanical works:
v Supervise the erections and maintenance works of electrostatic precipitator.
v Supervise the erection of pulse jet fabric filter.
v Conduct thorough inspections of mechanical and electrical equipment on electrostatic precipitator and make a recommendation report for repair and replacements of spare parts.
v Make the schedules of works and presentation to overview the scope of works and necessary tools and equipment required before shutdown.
v Ensure that the erections installations are according to the drawing and FLSMIDTH standards.
v Ensure that the safety standards are follow during execution of works.
v Attend coordination meeting with regards to issues and concerns of the project.
WORK EXPERIENCES:
FLSMIDTH -Airtech
Field Engineer
November 3, 2014 – June 18, 2016
v Flsmidth is multinational and Original Equipment Manufacturer (OEM) Company. This company provides inspection, rehabilitation, erection supervision and consultation which are dedicated on air pollution control in cement, power plant, copper and other industry.
MAJOR DUTIES & RESPONSIBILTIES:
v Erection of Pulse jet fabric filter.
v Ensure that the PT 100 sensor, heaters, level indicator and other instruments are proper installed to its location.
v Conduct inspection of internal mechanical and electrical system of Electrostatic Precipitator
v Supervise installation of alarm signal on ESP transformer and control panel.
v Make inspection report and detailed recommendation for the parts needed for Electrostatic Precipitator.
v Supervise the repair and maintenance of mechanical works in Electrostatic Precipitator.
v Troubleshoot Electrostatic Precipitator (ESP).
v Make a weekly progress report, scope of works and schedule of turnkey projects.
v Proper coordination to head office for some queries and submits control forms for approval.
v Attend the yearly coordination meeting and make presentation reports.
PROJECT INCLUDES:
v Erection of extension field in Raw Mill ESP. (Chinfon, Vietnam)
v Inspection and Maintenance Supervision, Cooler ESP, Asia Cement Corporation, (Saraburi, Thailand).
v Inspection and Maintenance Supervision, Kiln ESP (Saraburi, Thailand)
v Inspection and repair. Recovery boiler Toba Pulp (Lestari, Indonesia)
v Inspection and repair supervision, Lime Kiln 10, (IKPP, Indonesia)
v Erection of Kiln and Dry ESP, PT Antam Line Ore 4, (Pomalaa, Indonesia)
v Replacement of inlet gas Distribution screen and maintenance, Asia Cement Corp. (Saraburi, Thailand)
v Inspection and supervision, Cement Mill 3. Holcim Cement. (Bulacan, Philippines)
v Inspection and supervision, Cooler ESP, Solid Cement, (Antipolo, Rizal, Philippines.
v Supervise erection of Pulse Jet Fabric filters in Cement mill, Eagle Cement Corporation, (San Ildefonso Bulacan, Philippines.)
v Supervise upgrading Elex to FLSmidth design, Cooler ESP, APO Cement,(Cebu, Philippines)
TAI & CHYUN PHILIPPINES INC.
Senior Engineer
July 18, 2011- October 2014
v Tai and Chyun is a Taiwanese company which is doing the service in power plant, pulp and paper, biomass, cement and other industries dedicated on air pollution control. This company provides inspection, consultation, rehabilitation and maintenance supervision on electrostatic precipitator.
MAJOR DUTIES & RESPONSIBILTIES:
v Inspection of internal mechanical and electrical system of Electrostatic Precipitator of Pulse jet fabric filter.
v Troubleshoot Electrostatic Precipitator (ESP).
v Supervise repair and installation of mechanical works in Electrostatic Precipitator.
v Supervise upgrading heaters on ESP.
v Planning and scheduling of mechanical works for rehabilitation.
v Evaluate the work location and job hazard that can affect the project execution.
v Supervise workers to ensure optimum efficiency output with proper safety working environment.
v Make reports and recommendation base on findings in ESP.
v Make the scope of works and proposal for electrical works.
v Installation of Transformer, Supervision of cable pulling and modification of circuit in control panel.
v Retrofit the ESP controller, including relay, current transformer, analog meter, feedback board on transformer and other circuit to adopt the NWL controller.
v Attend the coordination meeting to organize the sequence of work.
PROJECT INCLUDES:
v Maintenance supervision for Research-Cottrell ESP, Quezon Power Limited, (Mauban Quezon, Philippines)
v Maintenance supervision for MHI Unit 2 ESP,SEM-Calaca Power Corp. (San Rafael Calaca, Batangas, Philippines)
v Rehabilitation of ABB Unit 1 ESP, SEM-Calaca Power Corp.( San Rafael Calaca, Batangas, Philippines)
v Rehabilitation of Hopper Heater at MHI Unit 2 ESP, SEM-Calaca Power Corp. (San Rafael Calaca, Batangas, Philippines)
v Maintenance supervision for Unit 1 & 2 ESP, Team Energy (Pagbilao, Quezon Philippines)
v Maintenance supervision for Unit 1 & 2 ESP, Team Energy( Sual, Pangasinan, Philippines)
v Maintenance supervision for ELEX ESP, Lafarge Cement Plant (Taysan, Batangas, Philippines)
v Maintenance supervision for ELEX ESP, Holcim Cement. (Bacnotan La union, Philippines)
v Maintenance supervision for Raw Mill ESP, Holcim Cement (Davao, Philippines)
v Maintenance supervision for Flakt & Lurgi ESP, PSAR, (Isabel Leyte, Philippines)
v Maintenance supervision for ESP at Mariwas Ceramic Tiles (Sto Tomas Batangas, Philippines)
v Trouble shooting and maintenance supervision for Thermax ESP at San Carlos Bioenergy, (San Carlos City, Negros Occidental, Philippines)
v Maintenance supervision for Unit 1 & 2 ABB ESP at Cebu Energy Development Corp. (CEDC), (Toledo City Philippines)
v Maintenance supervision for Cottrell ESP at Asia Pacific Energy Corp. (APEC), (Mabalacat, Pampanga Philippines)
v Rehabilitation for Biomass ESP at Roit-ET Green (Thailand)
v Rehabilitation for Raw Mill ESP at Holcim Cement ( Davao, Philippines)
v Supervision for upgrading 3 Phase Power Plus Transformer at Quezon Power Limited, (Mauban Quezon, Philippines)
v Supervision for upgrading 10 units of ESP controller at Unit 1 ESP (Calaca, Batangas, Philippines)
v Supervision for retrofit of 3 units NWL controller at Philippine Smelting & Refining Corporation, (Isabel Leyte, Philippines)
SPEC MASTER INC.
Project Engineer
October 15, 2007- July 14, 2011
v SPEC MASTER INC. is a consultant and Electrical contractor for power plant, High rise buildings, school, offices building and industrial projects. This company is capable to do design, estimate and supply for electrical requirements for low voltage and high voltage projects.
MAJOR DUTIES & RESPONSIBILTIES:
v Review of Electrical drawings, single line diagram, sizing of cables base on the load schedules.
v Make schedules, planning and assessment of the necessary electrical parts that is needed on the projects.
v Evaluate the electrical plan to ensure proper implementation of civil and mechanical works.
v Supervise installation of Fire Detection and Alarm Systems.
v Supervise the electrical works base on plan and specification.
v Estimate the electrical conduit, cable tray, wires, control cables and other materials required to complete the project.
v Proper coordination to purchasing office and engineering department.
v Supervise the cable pulling on main feeder line, instrumentation cables, LAN cables, telephone cable and other auxiliaries.
v Check the installation of electrical panel board, lighting, power, switches and telephone plug.
v Supervise installation of grounding system on substation and other facilities.
v Attend coordination meeting to organize the sequence of work and make proposals for additional works or any changes on site.
v Check the layout of conduit before concrete pouring on civil works.
v Conduct the insulation and resistance test for feeder line and other circuit before energizing the system.
v Check all terminations on switch gear, MCC, circuit breaker, meter center and other terminals to avoid lose connections.
v Make a progress reports to overview the status of the project.
PROJECT INCLUDES:
v Guest house, warehouse and temporary facilities in Sem-Calaca Power Corporation, (Calaca, Batangas, Philippines)
v 2-6.2 MW Diesel Generator Power Plant and 20 MVA Substations, Masbate Power Plant. (Masbate, Philippines)
v South Villas and Treetop Restaurant at Shangri-la, Boracay Resort, (Boracay Malay Aklan, Philippines)
v Hotel Alta Vista Boracay, (Boracay Malay Aklan, Philippines)
WALTER MART GAPAN NUEVA ECIJA
Engineering and maintenance staff
January 30, 2006- July 15, 2006
v WALTERMART shopping mall in Gapan Nueva Ecija is operating with department store, supermarket, fast food restaurant, Kids zone entertainment, Cinema, home and appliances center and other different tenants. The Engineering staff is responsible for
the power utilities, air handling unit, water supplied in fast food and other mall operation.
MAJOR DUTIES & RESPONSIBILTIES:
v Monitor the operation of substation and generator.
v Responsible for the maintenance and operation of lighting and air conditioning unit.
v Installation of electrical supply for new tenants and other seasonal activities.
v Troubleshoot incase of power failure and short circuit.
v Monitor the daily electrical and water consumption.
v Compute for the monthly bill of electrical and water consumption.
v Clearing perimeters inside and outside the mall.
v Make written report in case of trouble and rehabilitation.
v Review Electrical drawings, single line diagram, sizing of cables base on load schedules.
TRAININGS AND SEMINARS:
BASIC OCCUPATIONAL SAFETY and HEALTH (BOSH)
(August 28,-September 1, 2012)
INDUSTRIAL ELECTRICIAN
Meralco Foundation, Pasig City Manila
(January 15,-March 12, 2011)
NATIONAL TRANSMISSION CORP. (TRANSCO.)
Barangay Sumacab, Cabanatuan City Philippines
(April – May 2004)
BUILDING WIRING INSTALLATION
Cabanatuan City Philippines
(November 2003- March 2004)
EDUCATION:
B.Sc. in ELECTRICAL ENGINEERING
Nueva Ecija University of Science & Technology (NEUST formerly CLPC)
Nueva Ecija, Philippines
PROFESSIONAL LICENSE/CERTIFICATION:
REGISTERED MASTER ELECTRICIAN,
Professional Regulation Commission (Philippines): Reg. No. 0031930
PERSONAL INFORMATION:
Age : 39
Civil Status : Married
CHARACTER REFERENCE:
Available upon request
SONNY BOY D. BALAJONDA
ELECTRICAL ENGINEER
Permanent Address: #142 Sampaguita St. Villa Ofelia,
Cabanatua City, Nueva Ecija, Phillippines
Mobile No.: +63 9473768160
Email: [email protected]
STRENGTHS:
v Strong Overall Technical Skills
v Project Management Skills
v Good Leader and a Team Player
v Able to work in a multi-discipline and multi-cultural environment
SUMMARY OF EXPERIENCE AND QUALIFICATION:
With 10 years of thorough combined experience in Electrical and mechanical construction and maintenance projects in power plant, hotel, buildings, cement and other minerals.
Project Engineering and Management experience as follows:
v Management of engineering contractors.
v Conduct weekly meeting with the contractor and clients to coordinate the list priorities and sequence of works.
v Make a presentation to overview the scope of works and preparation ahead of time.
v Evaluate and thorough check the scope of works on site to ensure the quality of works and safety standard during execution of the project.
Engineering experience in electrical works:
v Supervision for installation of all electrical works in Power Plant, hotel and restaurant, building, warehouse, temporary facilities, cement and other industries.
v Review the electrical drawings, mechanical and civil works before execute the works.
v Supervision for installation of transformer, grounding system, substation, switchgear, MCC panel, Fire alarms system and other auxiliaries.
v Supervision for installation of electrical conduit, cable tray for power and instrumentation cables, pull boxes and manholes on main feeder lines on the ground.
v Estimate the quantity of electrical conduit, cables and other consumables required on the project.
v Supervision for installation of grounding system, cable pulling and termination for power cables, control cables, and instrumentation cables, LAN cables, Telephone cables and other auxiliaries.
v Conduct loop check that all cables are properly terminated according to the load schedule, circuit breaker, terminal block on MCC and make sure that all terminals are tightening properly.
v Check the bus bar installation and use torque wrench on bolts to ensure that all bolts connection are tightening properly.
v Conduct insulation test, grounding resistance test, resistance test of all cables, bus bar insulators, check the voltage and amperes load to MCC, meter center, and other location to ensure that all electrical works are in good condition.
v Attend coordination meetings to the clients and project management team to raise some issues and other concern to eliminate conflict on the entire construction team.
v Planning and make schedules to distribute manpower on different activities to meet the goal schedule required on the project.
v Make a proposal in case of some changes and additional work on site.
v Make a tool box meeting to raise the daily safety exercises, sequence of works and other concerns.
Engineering experience in mechanical works:
v Supervise the erections and maintenance works of electrostatic precipitator.
v Supervise the erection of pulse jet fabric filter.
v Conduct thorough inspections of mechanical and electrical equipment on electrostatic precipitator and make a recommendation report for repair and replacements of spare parts.
v Make the schedules of works and presentation to overview the scope of works and necessary tools and equipment required before shutdown.
v Ensure that the erections installations are according to the drawing and FLSMIDTH standards.
v Ensure that the safety standards are follow during execution of works.
v Attend coordination meeting with regards to issues and concerns of the project.
WORK EXPERIENCES:
FLSMIDTH -Airtech
Field Engineer
November 3, 2014 – June 18, 2016
v Flsmidth is multinational and Original Equipment Manufacturer (OEM) Company. This company provides inspection, rehabilitation, erection supervision and consultation which are dedicated on air pollution control in cement, power plant, copper and other industry.
MAJOR DUTIES & RESPONSIBILTIES:
v Erection of Pulse jet fabric filter.
v Ensure that the PT 100 sensor, heaters, level indicator and other instruments are proper installed to its location.
v Conduct inspection of internal mechanical and electrical system of Electrostatic Precipitator
v Supervise installation of alarm signal on ESP transformer and control panel.
v Make inspection report and detailed recommendation for the parts needed for Electrostatic Precipitator.
v Supervise the repair and maintenance of mechanical works in Electrostatic Precipitator.
v Troubleshoot Electrostatic Precipitator (ESP).
v Make a weekly progress report, scope of works and schedule of turnkey projects.
v Proper coordination to head office for some queries and submits control forms for approval.
v Attend the yearly coordination meeting and make presentation reports.
PROJECT INCLUDES:
v Erection of extension field in Raw Mill ESP. (Chinfon, Vietnam)
v Inspection and Maintenance Supervision, Cooler ESP, Asia Cement Corporation, (Saraburi, Thailand).
v Inspection and Maintenance Supervision, Kiln ESP (Saraburi, Thailand)
v Inspection and repair. Recovery boiler Toba Pulp (Lestari, Indonesia)
v Inspection and repair supervision, Lime Kiln 10, (IKPP, Indonesia)
v Erection of Kiln and Dry ESP, PT Antam Line Ore 4, (Pomalaa, Indonesia)
v Replacement of inlet gas Distribution screen and maintenance, Asia Cement Corp. (Saraburi, Thailand)
v Inspection and supervision, Cement Mill 3. Holcim Cement. (Bulacan, Philippines)
v Inspection and supervision, Cooler ESP, Solid Cement, (Antipolo, Rizal, Philippines.
v Supervise erection of Pulse Jet Fabric filters in Cement mill, Eagle Cement Corporation, (San Ildefonso Bulacan, Philippines.)
v Supervise upgrading Elex to FLSmidth design, Cooler ESP, APO Cement,(Cebu, Philippines)
TAI & CHYUN PHILIPPINES INC.
Senior Engineer
July 18, 2011- October 2014
v Tai and Chyun is a Taiwanese company which is doing the service in power plant, pulp and paper, biomass, cement and other industries dedicated on air pollution control. This company provides inspection, consultation, rehabilitation and maintenance supervision on electrostatic precipitator.
MAJOR DUTIES & RESPONSIBILTIES:
v Inspection of internal mechanical and electrical system of Electrostatic Precipitator of Pulse jet fabric filter.
v Troubleshoot Electrostatic Precipitator (ESP).
v Supervise repair and installation of mechanical works in Electrostatic Precipitator.
v Supervise upgrading heaters on ESP.
v Planning and scheduling of mechanical works for rehabilitation.
v Evaluate the work location and job hazard that can affect the project execution.
v Supervise workers to ensure optimum efficiency output with proper safety working environment.
v Make reports and recommendation base on findings in ESP.
v Make the scope of works and proposal for electrical works.
v Installation of Transformer, Supervision of cable pulling and modification of circuit in control panel.
v Retrofit the ESP controller, including relay, current transformer, analog meter, feedback board on transformer and other circuit to adopt the NWL controller.
v Attend the coordination meeting to organize the sequence of work.
PROJECT INCLUDES:
v Maintenance supervision for Research-Cottrell ESP, Quezon Power Limited, (Mauban Quezon, Philippines)
v Maintenance supervision for MHI Unit 2 ESP,SEM-Calaca Power Corp. (San Rafael Calaca, Batangas, Philippines)
v Rehabilitation of ABB Unit 1 ESP, SEM-Calaca Power Corp.( San Rafael Calaca, Batangas, Philippines)
v Rehabilitation of Hopper Heater at MHI Unit 2 ESP, SEM-Calaca Power Corp. (San Rafael Calaca, Batangas, Philippines)
v Maintenance supervision for Unit 1 & 2 ESP, Team Energy (Pagbilao, Quezon Philippines)
v Maintenance supervision for Unit 1 & 2 ESP, Team Energy( Sual, Pangasinan, Philippines)
v Maintenance supervision for ELEX ESP, Lafarge Cement Plant (Taysan, Batangas, Philippines)
v Maintenance supervision for ELEX ESP, Holcim Cement. (Bacnotan La union, Philippines)
v Maintenance supervision for Raw Mill ESP, Holcim Cement (Davao, Philippines)
v Maintenance supervision for Flakt & Lurgi ESP, PSAR, (Isabel Leyte, Philippines)
v Maintenance supervision for ESP at Mariwas Ceramic Tiles (Sto Tomas Batangas, Philippines)
v Trouble shooting and maintenance supervision for Thermax ESP at San Carlos Bioenergy, (San Carlos City, Negros Occidental, Philippines)
v Maintenance supervision for Unit 1 & 2 ABB ESP at Cebu Energy Development Corp. (CEDC), (Toledo City Philippines)
v Maintenance supervision for Cottrell ESP at Asia Pacific Energy Corp. (APEC), (Mabalacat, Pampanga Philippines)
v Rehabilitation for Biomass ESP at Roit-ET Green (Thailand)
v Rehabilitation for Raw Mill ESP at Holcim Cement ( Davao, Philippines)
v Supervision for upgrading 3 Phase Power Plus Transformer at Quezon Power Limited, (Mauban Quezon, Philippines)
v Supervision for upgrading 10 units of ESP controller at Unit 1 ESP (Calaca, Batangas, Philippines)
v Supervision for retrofit of 3 units NWL controller at Philippine Smelting & Refining Corporation, (Isabel Leyte, Philippines)
SPEC MASTER INC.
Project Engineer
October 15, 2007- July 14, 2011
v SPEC MASTER INC. is a consultant and Electrical contractor for power plant, High rise buildings, school, offices building and industrial projects. This company is capable to do design, estimate and supply for electrical requirements for low voltage and high voltage projects.
MAJOR DUTIES & RESPONSIBILTIES:
v Review of Electrical drawings, single line diagram, sizing of cables base on the load schedules.
v Make schedules, planning and assessment of the necessary electrical parts that is needed on the projects.
v Evaluate the electrical plan to ensure proper implementation of civil and mechanical works.
v Supervise installation of Fire Detection and Alarm Systems.
v Supervise the electrical works base on plan and specification.
v Estimate the electrical conduit, cable tray, wires, control cables and other materials required to complete the project.
v Proper coordination to purchasing office and engineering department.
v Supervise the cable pulling on main feeder line, instrumentation cables, LAN cables, telephone cable and other auxiliaries.
v Check the installation of electrical panel board, lighting, power, switches and telephone plug.
v Supervise installation of grounding system on substation and other facilities.
v Attend coordination meeting to organize the sequence of work and make proposals for additional works or any changes on site.
v Check the layout of conduit before concrete pouring on civil works.
v Conduct the insulation and resistance test for feeder line and other circuit before energizing the system.
v Check all terminations on switch gear, MCC, circuit breaker, meter center and other terminals to avoid lose connections.
v Make a progress reports to overview the status of the project.
PROJECT INCLUDES:
v Guest house, warehouse and temporary facilities in Sem-Calaca Power Corporation, (Calaca, Batangas, Philippines)
v 2-6.2 MW Diesel Generator Power Plant and 20 MVA Substations, Masbate Power Plant. (Masbate, Philippines)
v South Villas and Treetop Restaurant at Shangri-la, Boracay Resort, (Boracay Malay Aklan, Philippines)
v Hotel Alta Vista Boracay, (Boracay Malay Aklan, Philippines)
WALTER MART GAPAN NUEVA ECIJA
Engineering and maintenance staff
January 30, 2006- July 15, 2006
v WALTERMART shopping mall in Gapan Nueva Ecija is operating with department store, supermarket, fast food restaurant, Kids zone entertainment, Cinema, home and appliances center and other different tenants. The Engineering staff is responsible for
the power utilities, air handling unit, water supplied in fast food and other mall operation.
MAJOR DUTIES & RESPONSIBILTIES:
v Monitor the operation of substation and generator.
v Responsible for the maintenance and operation of lighting and air conditioning unit.
v Installation of electrical supply for new tenants and other seasonal activities.
v Troubleshoot incase of power failure and short circuit.
v Monitor the daily electrical and water consumption.
v Compute for the monthly bill of electrical and water consumption.
v Clearing perimeters inside and outside the mall.
v Make written report in case of trouble and rehabilitation.
v Review Electrical drawings, single line diagram, sizing of cables base on load schedules.
TRAININGS AND SEMINARS:
BASIC OCCUPATIONAL SAFETY and HEALTH (BOSH)
(August 28,-September 1, 2012)
INDUSTRIAL ELECTRICIAN
Meralco Foundation, Pasig City Manila
(January 15,-March 12, 2011)
NATIONAL TRANSMISSION CORP. (TRANSCO.)
Barangay Sumacab, Cabanatuan City Philippines
(April – May 2004)
BUILDING WIRING INSTALLATION
Cabanatuan City Philippines
(November 2003- March 2004)
EDUCATION:
B.Sc. in ELECTRICAL ENGINEERING
Nueva Ecija University of Science & Technology (NEUST formerly CLPC)
Nueva Ecija, Philippines
PROFESSIONAL LICENSE/CERTIFICATION:
REGISTERED MASTER ELECTRICIAN,
Professional Regulation Commission (Philippines): Reg. No. 0031930
PERSONAL INFORMATION:
Age : 39
Civil Status : Married
CHARACTER REFERENCE:
Available upon request