ALFREDO P. VELASQUEZ
E-mail: [email protected]
+639275606023
SKILLS
Experienced in Building and Plant Maintenance and Operational Works.
Proficient in Planning Daily/ Monthly/ Weekly/ Quarterly/ Semi-Annual and Annual Activity/ Work Schedules.
Efficient in Estimates, Designs and QA/ QC works.
Reads Isometric, As Built, Vendor Drawings and Piping & Instrument Diagrams (P&ID’s)
Literate on Computer; Windows XP and VISTA, MS Word, MS Excel, MS PowerPoint, Microsoft Project and AUTOCADD.
Great Team Player.
WORK EXPERIENCES
I. Position : Administrator – Resident Engineer
Company : CB Estrada and BHF Prime Holdings
Dagupan City, Pangasinan, Philippines
Date : July 22, 2016 – Present
Duties and Responsibilities:
Administers House Rules and all maintenance works;
BHF Family Plaza – Mayombo, Dagupan City
CB Mall – Urdaneta City, Pangasinan
Puregold – Bonuan, Dagupan City
Puregold – Mangatarem, Pangasinan
Maintenance for Mechanical Works – Fire Protection, Plumbing and Airconditionitioning System. And Electrical and Civil Works.
II. Position : Site Engineer/ Project Coordinator
Company : Specialist Technical Services Company Ltd
Jubail, Kingdom of Saudi Arabia and Bahrain
Date : January 10, 2014 – June 2016
Duties and Responsibilities:
Tank Cleaning and Maintenance Works at SASREF Refinery and Causeway/ Port.
Scope of Works are Isolation, Blinding/ Spading, Opening Manways, Desludging, Hydrojetting and BA works, Assisting MFL and UT Inspections. Roof, Bottom, Annular Plates and Shell Plates, Heating Coils Replacement, Rafter and Railways Repairs, Sandblasting and Painting, Boxing up, Deblinding/ Despading Activities and Assisting Operation’s commissioning.
Tank Cleaning at Oil Rig Offshore (NABORS – ARAMCO)
BAPCO Tank Maintenance Works
III. Position : Rotating and Stationary Mechanical Supervisor
Company : Colliers International
San Fernando City, La Union
Date : September 2012 – January 08, 2014
Duties and Responsibilities:
Preventive Maintenance @ CHEVRON Depot, San Fernando City, La Union, Phil.
Equipments; Pumps and Motors, Loading Arms, Fire Pumps, Generator, Tanks, Piping above
And undergrounds, Oil Separators, Firefighting System, Water Utility System, Panels and Circuit Breakers.
IV. Position : Resident Engineer
Company : CB Mall – Urdaneta
Nancayasan, Urdaneta City, Pangasinan
Date : June 10, 2011 – September 2012
Duties and Responsibilities:
Maintenance and Operations at CB Mall
Mechanical Works – Chillers, AHU, FCU, Generators, Pumps, Sewage Treatment Plant.
Electrical Works – Medium and Low Voltage Switchgears, Panels and Circuit Breakers.
Civil Works – Waterproofing, Construction of Warehouse, Parking Lots, Sewer and Drain Lines.
Pump Room
Sewage Treatment Plant (STP)
SPECIAL PROJECTS:
Accomplished Projects
Emission Testing and Painting of Exhausts of Generator 01 and 02
Relocation of Flow Meter and Installation of Drainage
Installation of Drainage @ Super8 Parking Area
Replacement of Drainage @ Pump Room
Checklist for Doors for Closet Partition and Mirrors of Comfort Rooms at CB Mall
Repair of Defective Pipe Line for Caterpillar 3500B High Displacement Generator Set 02
Installation of Oil Level Gauges for Diesel Tanks (Main, 01 & 02) of Caterpillar Generator Sets 01 & 02
Installation of Exhaust Pipe for Blue Generator Set (Perkins)
Installation of Rubber Stopper for Window @ Repeater
Troubleshooting on Pump Room
Troubleshooting on Sewage Treatment Plant (STP)
V. Position : Technical & Operations Engineer
Company : Property Management Specialists Team (PROSPECT) Inc.
Unit 505-507, Comfoods Bldg, Cor Gil Puyat & Chino Roces Ave, Makati City, Philippines
Date : Aug 16, 2010 – May 16, 2011
Duties and Responsibilities:
Preventive Maintenance and Operational Monitoring at Malls, Schools & High Rise Buildings;
Luntala Valle Verde IV-A Condominium
Vista De Loro Condominium & Resort
De La Salle University – AKIC, CSB
Lyceum Colleges
Liberty Broadcasting Network Inc.
Mondrian Flats Condominium Bldg
Meimban Apartments
FILINVEST PROPERTIES Corporation;
• Festival Mall – PEMS
• West Parc Mall
• South Station Mall
• Northgate – Cyberzone Properties Inc.
• Aspen Flats Condominium Bldng
• Civic Prime Flats Condominium Bldg
• Civic Place Flats Condominium
• La Maison Flats Condominium Bldg
• One Oasis Flats Condominiums, Pasig & Bali – Marikina
• Studio One & Two Condominium Bldg
• Vivant Flats Condominium Bldg.
VI. Position : Mechanical Supervisor
Company : Isam Kabbani & Partners Co. Ltd
Jeddah, Saudi Arabia
Date : August 03, 2006 – November 23, 2009
Duties and Responsibilities:
SI # Designation Location Name of Project Date Completed
01 Mechanical Engineer Ju-Aymah Gas Plant,
Saudi ARAMCO,
Ju-Aymah, Saudi Arabia Maintenance & Shutdown @ Tihama Powerplant.
Dec’08-No ‘09
02 Project Engineer
Yanbu Refinery,
Saudi ARAMCO,
Yanbu, Saudi Arabia Total Refinery Shutdown 2008 Aug’08-Dec‘08
Lube Refinery, Yanbu, Saudi Arabia Raffinate Project Estimation on Installation of Loading Arm, Pumps and Pipelines June’08
03 QA/ QC Engineer Jeddah Refinery,
Saudi ARAMCO,
Jeddah, Saudi Arabia Total Refinery Shutdown 2008 Apr’08-June’08
04 Mechanical Engineer Natural Gas Liquid (NGL), Saudi ARAMCO, Yanbu, Saudi Arabia Planning and Estimations of Manpower, Materials, Equipments, Tools, Manpower, Time framing and Scheduling
○ Columns and Drums
○ Coolers, Reboilers, Fin-fans and Vaporizers Apr’07-Apr’08
05 Supervisor Marine Area, Rabigh Refinery, Saudi ARAMCO, Rabigh, Saudi Arabia Installation of 10” Slop Line of 3.5Km of Length Oct’06-Apr’07
PetroRabigh, Rabigh, Saudi Arabia Renovations Warehouses 700 and 701.
Rabigh Refinery, Saudi ARAMCO, Rabigh, Saudi Arabia 32” Asbestos Pipe Removal @ Substation 51.
PetroRabigh and Rabigh Refinery, Saudi ARAMCO, Rabigh, Saudi Arabia Maintenance All Existing Substations, Pump Houses and SFL’s.
PetroRabigh and Rabigh Refinery, Saudi ARAMCO, Rabigh, Saudi Arabia Cable Laying from Substation 10.1 to 10.6.
Rabigh Refinery, Saudi ARAMCO, Rabigh, Saudi Arabia Renovation of Laboratory
06 Mechanical, Electrical and Civil Estimator Jeddah, Saudi Arabia Design and Estimation for Future Expansion of Desalination Plant for Industrial, Potable and Firefighting Water System @ Arabian Cement Company Aug’06-Oct’06
Lube Refinery, Jeddah, Saudi Arabia Upgrading Flood Storm Prevention
VII. Position : Mill Plant Operator
(Working Student while Regular Employee)
Company : Philex Mining Corporation
Padcal, Tuba, Benguet, Philippines
Date : August 03, 2004 – June 2006
Duties and Responsibilities:
Operates and troubleshoots at following Sections of a Mill Plant;
Primary Section; Dump Bins, Apron Feeders, Jaw Crushers, Belt and Tripper Conveyors, Hemitt Robins Vibrating Screens.
Secondary and Tertiary Section; Ore Bins, Telsmith Vibrating Screens, Secondary and Tertiary Crushers.
Ball Mill Section; BallMills, Belt Conveyors, Syntron Feeders, Cyclones, Centrifugal Pumps.
Flotation Section ; Agitairs, WEMCO Banks, Thickeners, Sedimentation Tanks Centrifugal, Diaphragm and Vacuum Pumps, Blowers, Filter Press
EDUCATIONAL BACKGROUND
Tertiary
1999 – October 2004 Saint Louis University Baguio City, Philippines
Bachelor of Science in Mechanical Engineering
Member, Philippine Society of Mechanical Engineering, PSME (1999-Present)
Secondary
1992-1996 Saint Louis Highschool – Philex Padcal, Tuba, Benguet, Philippines
Consistent Student in the Elite Section
Primary
1986-1992 Philex Elementary School Padcal, Tuba, Benguet, Philippines
Consistent Honor Student, Best in Arts and Best in Work Education
SEMINAR / TRAININGS ATTENDED
H2s Safety Training ar Helicopter Underwater Emergency Training (HUET EBS).
Saudi ARAMCO Shell Refinery Permit to Work (PTW) Training and Seminar
Saudi ARAMCO Shell Refinery Safety Orientations
SAIO Safety Training – Course and Examination on Industrial Breath Protection/SCBA/Safe use of Breathing Air/Inert Entry.
SAIO Safety Training – Course and Examination on Hydrojetting Procedures.
Saudi Aramco Orientation to Emergency Response Plan – Hawiyah, Riyadh.
Qatar Chemical Corp. Permit to Work (PTW) Training and Seminar
ARAMCO Safety Orientations
ARAMCO Permit to Work (PTW) Training and Seminar
Petronas on Natural Gas
Petron Refinery
ENRON Diesel Powerplant
Electruck’s Cranes
MakBan Geothermal Powerplant
Kalayaan Hydraulic Powerplant
ARCYA Glass Plant
CALACA Coal Fired Powerplant
Pilipinas Hino
San Miguel Corporation Processing System
San Roque Hydraulic Powerplant
Bauang Diesel Powerplant
Yokohama Conveyors
Safety Precautions on Industries
LANGUAGE AND DIALECTS SPOKEN
Filipino, English, Arabic, Ilocano, Pangalatoc.
PERSONAL DATA
Home Address : Lekep, San Fabian, Pangasinan, Philippines
Current Address : Jubail, Saudi Arabia
Date of Birth : October 19, 1979
Place of Birth : Lekep, San Fabian, Pangasinan
Gender : Male
Height : 165cm
Weight : 70kg.
Civil Status : Single
Religion : Roman Catholic – Christian
Citizenship : Filipino
Blood type : AB+
PRC License Number : 0067144
Driver’s License Number : Philippines – -002139 A04-09
Saudi Arabia – 2359430275
TIN Number : 936-359-007
SSS Number : 01-1653954-6
PAG-IBIG Number : 01-064273040-1
Philhealth Number : 1902-6181-6443
Passport Number : EC2628204
Contact Person in Case of Emergency : Edna Rivera
Bungro, San Fernando City, Philippines
+63915-5262-973
PERSONAL REFERENCES
Engr. Sami Al-Ghamdi
Supervisor
NGL Offshore Maintenance Unit
Arabian American Company
Yanbu, Saudi Arabia
[email protected]
+966503343305
Engr. Rolly Bayaborda
Project Manager
Oman Oryx Trading and Contracting LLC.
PDO’S PAC – Lekhwair Project
Muscat, Oman
[email protected]
+96730927
Engr. Melquiades Garcia
Team Leader
Colliers International
San Fernando City, La Union, Philippines
[email protected]
+ 639162903422
Erwin Casem
Operator
Chevron
San Fernando City, La Union, Philippines
+ 639199214484