CONSTANTINO A. ANDALES
BACS Headquarters Building Brgy. Daanlungsod, Medellin, Cebu
Intersection of Al-Asha and Fatima Cebu, Philippines 6014
Al- Zahra St. P. O. Box 28708 Cell# +639301820393
Riyadh 11447 K.S.A. Cell# +63909301820393 Email: [email protected]
OBJECTIVE: Tobe a part of dynamic team, to be able to continue the ability and knowledge maybe applicable in others aspects of job, quality assurance and high level of work performance.
WORK EXPERIENCE:
Consolidated Contractors International Company W.L.L.
BACS Riyadh Metro Project
Riyadh, Kingdom of Saudi Arabia
November 13, 2014 – July,17 2019
Position: FOREMAN/PIPING
Consolidated Contractors International Company W.L.L.
Barzan Onshore Project Doha, Qatar
May 21, 2012 – June 20, 2014
Position: FOREMAN/PIPING
Mohammad Al-Mojil Group
Jubail Kingdom of Saudi Arabia
October 5, 2003 – July 10, 2009
Position: FOREMAN/PIPING
JOB DESCRIPTION:
· Extensive fabrication experienced and ability to read isometric/spool drawings.
· Study blue prints, drawings and specifications to determine the type of pipe and tools to use and lay out the sequence of tasks.
· Make detailed sketches for pipe and equipment fabrication and installation as required.
· Measure and cut, thread, groove, assemble and fit up as per drawing specifications.
· Join pipe section and related equipment and secure in position.
· Marking the pipe in correct measurements as per required in isometric drawings.
· Cutting and grinding of the edge of pipes in preparation for fit-up
· Working during shutdown at the existing plant, remove old pipe, fabricate and installed new pipe lines.
· Installed all pipe spool and fit-up all sizes of fittings including all types of Olet Fittings.
· Installed all types of valves; gate valve, globe valve, ball valve, butterfly valve, and safety valve
· Installed all types of pipe support as per required on site and follow detailed drawings.
· Installed water and sewer line around the building and road section using PVC pipes.
· Installed potable water line, drinking water line, irrigation water line ductile pipes.
· Conduct toolbox talk every day and follow safety rules and regulations.
Explain to co-workers about company properties on how to protect them, how to minimize cost and how to reach maximum production as per required by Managers and Superiors.
EDUCATION:
HIGH SCHOOL
St. Paul School of Medellin
Cebu, Philippines
1972 – 1976 (Graduated)
COLLEGES
Bachelor of Science in Mechanical Engineering (BSME l)
University of the Visayas 1978 – 1979
Bachelor of Science in Accounting
Cebu Roosevelt Memorial Colleges
1980 – 1983 (under graduate)
CHARACTER REFERENCES:
ENGR. EMIL
BACS Riyadh Metro Project
Riyadh, K.S.A.
0582067616
ENGR. NAJIB KHOURY
BACS Riyadh Metro Project
Riyadh K.S.A.
Mechanical Engineer
0582070712
M. KHALED SOBH
Barzan Onshore Project
Doha, Qatar
(Manager/Admin)
01197444193555
ALLAN OMIPING
Mohammad Al-Mojil Group
Jubail Kingdom of Saudi Arabia
(Project Manager)
01196638421111
Bachelor of Science in Mechanical Engineering (BSME l)
Bachelor of Science in Accounting