Mechanical Engineer, 28 years of experience as Manager of the Departments of Engineering and Projects, developing projects for continuous improvement and energy savings, optimization and automation of production processes, development of projects to increase production in chemical process plants, implementation and monitoring of preventive and predictive maintenance plans, for production lines, general services, infrastructure and buildings, as well as other projects.
Certification as International energy management expert based on the ISO 50001 standard since 2012 by DGQ / DQS-UL of Germany.
Internal auditor certification for integrated management systems ISO 9001, ISO 14001, OSHA 18001 by DQS-UL
Yellow, Green and Black Belt courses based on Lean Manufacturing and Six Sigma tools by Lean Six Sigma Institute.
Implementation of projects for continuous improvement and energy savings in production processes and general service areas.
Implementation of the Energy Savings Control Chart in Henkel La Luz. ”With this, it was possible to know the consumption, the baselines of measurements, create the indicators and define improvement opportunities
SOME PROJECTS DEVELOPED
During my professional career I have developed a total of 63 improvement projects, of which I can explain in more details.
Atlantic International University / School of Business and Economics, City: Honolulu – Hawaii
Títle: Doctor of Project Management
Saint Charles University from Guatemala / Postgraduate Studies School,
City: Guatemala – Guatemala
Títle: Master in Maintenance Engineering
Saint Charles University from Guatemala / Faculty of Engineering
City: Guatemala – Guatemala
Títle: Mechanical Engineer
Certification as International energy management expert based on the ISO 50001 standard
Internal auditor certification for integrated management systems ISO 9001, ISO 14001, OSHA 18001 by DQS-UL
Technical evaluation and training of 24 people for the operation of a continuous process of manufacturing and drying soap shavings in the Suchel State Company in la Habana Cuba. Obtaining excellent results in improving effectiveness and productivity.
Development of maintenance and training plan for the personnel of the Suchel Cetro plant and optimization of the overall effectiveness of the equipment.
Development of a project to install the new production lines with the latest technology from Mazzoni to manufacture dry soap shavings for toilet soap.
Development of projects to increase production capacity in the manufacturing lines of home and personal care liquids, powder detergents, diswashing creams and sulfonation plants.
Implementation of automatic system for handling spare parts in the warehouse.
Implementation of PSTool SAP for managing projects.
Implementation and control of energy savings chart for production processes and general services.
Implementation and monitoring the preventive and predictive maintenance plans for the different manufacturing processes, general services, infrastructure and buildings.
Evaluation and control of the Kpis and annual budget of Industrial Maintenance and Buildings.
Development project to increase the capacity production of powder detergent plant from 4,500 kg / hr to 10,000 kg / hr