Gerardo Cruz Architect/Site Architect/Construction Supervision Architect

Philippines
Fit out WorkInspection.Microsoft OfficemonitoringQA/QCReview SubmittalSupervision

 

 

 

 

KEO International Consultant, C Ring Qatar

 

Architect,  April 7, 2013 to  Oct 26, 2016

Project: Lusail Multi -Purpose Hall

[Stadium]

 

·       Review and approve shop drawings material submittal, pre-qualification document as per latest coordinated construction plans.

·       Coordinate with the team on site to ensure that contractual obligations are met.

·       Recommends action plan to technical problems that may arise and evaluate compliance to agreed solutions to avoid the problem and stop the recurrence.

·       Ensure accuracy and completeness of records including documentation.

·       Supervise and monitoring the fit-out work.

·       Report to resident Engineer and update issues as required.

·       Undertake supervision duties on site architectural finishing.

·       Ensure and complies with approved shop drawing itp, method Statement, material submittal.

·       Ensure and complies with approved shop drawing.

·       Observe site safety and issue notices as the need arises.

 

 

 

 

AECOM Middle East Limited  Doha Qatar

 

Architectural Inspector, July 2011 – Dec 31, 2012

Project:    Barwa Commercial Avenue

Apartment, mall, commercial

8.5 Kilometer

 

·       Assist the Resident Engineer in the management and administration of various construction contract packages.

·       Review the contractor’s progress at all time.

·        Monitor the work the material incorporated in the work, the materials stored at the site and the contractor’s manpower and equipment and report.

·       Coordinate the efforts of separate contractors and liaise with local authorities.

·       Observe the safety procedure followed by the contractor.

·       Issue instructions as necessary to correct safety violations.

·        Attend weekly, monthly and other progress meetings held at the site as required.

·       Review the contractor’s progress.

·       Identify constraints and recommend corrective measures.

·       Assist with preparation and transmittal of site directions and instructions in conjunction with the CM/supervision consultant.

·       Coordinate with the team on site to ensure that contractual obligations are met.

·       Under take overview supervision duties on site to ensure general compliance contract requirements and when necessary cause to address deficiencies associated with the same of the works with specification and requirement cause to address deficiencies associated with the same.

 

 

Cansult Maunsell AECOM Abu dhabi, U.A.E.

 

Senior QA, QC Architect-Architectural Inspector, March 2007 – July 2011

Project: Etihad Towers, 5 Tower, Apartment, Residential/Hotel/Office [High Rise]

 

·       Undertake supervision duties on site to ensure the general compliance of the works with specifications and contract requirements and whenever necessary cause to address deficiencies associated with the particular project.

·       Coordinate all aspects of submittal, review and approvals against contract requirement and when applicable report and advice on deviations from the same.

·       Coordinate as maybe required with client on all specialist participation related to the final acceptance of the works in readiness for fit-out work and operation of the project.

·       Assist client in all aspect of the final acceptance of the work and close out all applicable contract related to the same.

·       Coordinate with the team on site to ensure that contractual obligations are met.

·       Prepare and issue NCR (Non Conformance Report) SWI (Site Work Instruction) site for re-evaluation of contractor progress as per approved plan and specifications.

·       Observe site safety and issue appropriate notice to all concern.

·       Undertake supervision duties on site architectural finishing Ensure and complies with approved shop drawing ITP, Method Statement, Material Submittal. Undertake snagging and de snagging prior to turn over to the Client.

 

Freelance Project Architect, Makati City Philippines

February 1997 – August 2007

Project:  30 Storey Commercial and Residential Condominium [High Rise]

 

·       Undertake supervision duties on site to ensure the general compliance of the works with specifications and contract requirements and whenever necessary cause to address deficiencies associated with the particular project.

·       Coordinate with the contractors implementing the plans and other built changes in order to facilitate any urgent work.

·       Conceptualizing, Incorporating and coordinating design changes and development.

·       Review and approve shop drawings as per latest coordinated construction plans.

·       Coordinate with the team on site to ensure that contractual obligations are me.

·       Recommends action plan to technical problems that may arise and evaluate compliance to agreed solutions to avoid the problem and stop the recurrence.

·      Ensure accuracy and completeness of records including documentation.

·       Report to resident Engineer and update issues as required.

·       Observe site safety and issue notices as the need arises.

 

 

 

 

 

 

 

D.A. Abcede And Associates Herrera Tower, Makati Philippines

 

Project Architect, August 1996 – August 1997

Project: 30 Storey Commercial Building [High Rise]

 

·       Supervision and monitoring duties on site to ensure general compliance of the work with specifications and contract requirements to address deficiencies that may occur.

·       Coordinate with the contractors implementing the plans and other built changes in order to facilitate any urgent work.

·       Conceptualizing, incorporating and coordinating design changes and development. Review and approve shop drawings as per latest coordinated construction plans.

·       Coordinate with the team on site to ensure that contractual obligations are met.

·       Recommends action plan to technical problems that may arise and evaluate compliance to agreed solutions to avoid the problem and stop the recurrence.

·       Ensure accuracy and completeness of records including documentation.

·       Report to resident Engineer and update issues as required. Undertake supervision duties on site architectural finishing.

·       Ensure and complies with approved shop drawing. Observe site safety and issue notices as the need arises.

 

 

 

 

 

 

 

 

 

 

D.A. Abcede And Associates Herrera Tower, Makati Philippines

 

Project Architect, February 1995 – August 1996

Project:12 Storey City Square Pioneer Condominium [High Rise]

 

 

·       Supervision and monitoring duties on site to ensure general compliance of the work with specifications and contract requirements to address deficiencies that may occur.

·       Coordinate with the contractors implementing the plans and other built changes in order to facilitate any urgent work.

·       Conceptualizing, incorporating and coordinating design changes and development. Review and approve shop drawings as per latest coordinated construction plans.

·       Coordinate with the team on site to ensure that contractual obligations are met.

·       Recommends action plan to technical problems that may arise and evaluate compliance to agreed solutions to avoid the problem and stop the recurrence.

·       Ensure accuracy and completeness of records including documentation.

·       Report to resident Engineer and update issues as required. Observe site safety.

 

 

GENP Builder  Inc. Sucat  Paranaque Metro Manila Philippines

 

Project Architect, January 1994 – January 1995

Project:   1 Storey warehouse and office building

 

·       Coordinate with the Engineer and Foreman on site and execute the various construction works following strictly the designs and prepared shop drawings.

·       Check procedures on how to deposit mass concrete in the different parts of the building structure.

·       Conduct necessary meeting with the Engineer particularly the Foreman on site regarding the daily progress of the work.

·       Prepare reports of completion and other documents for the turnover of the completed project.

 

Classic Scheme Design Corp. Camp Ali Baguio City Philippines

 

Project Architect, January 1993 – January 1994

Project:  2 Storey Residential Building, Repair and Renovation

 

·       Coordinate with the Engineer and Foreman on site and execute the various construction works following strictly the designs and prepared shop drawings.

·       Check procedure on how to deposit mass concrete in the different parts of the building structure.

·       Conduct necessary meeting with the Engineer particularly the Foreman on site regarding the daily progress of the work.

·       Prepare reports of completion and other documents for the turnover of the completed project.

 

 

 

 

Dynamic Planner and Construction Corp. Camp Ali Baguio City Philippines

 

 

Project Architect, October 1988 – February 1993

Projects: 2 Storey Residential Building and another 2 storey school building

Sta. Rosa Interchange, Sta. Rosa Laguna

Two Storey School Bldg., Malabon, Metro Manila

Renovation of caltex Station, Caloocan City

Repair and renovation of PCI Bank, Makati City

 

·       Prepare and designs of the building following the desire and instruction of the owners. Coordinate with the engineer on site particularly the foreman on site.

·       General supervision on site to ensure the compliance of the work specifications and contract requirements.

·       Prepare reports of completion for the final turnover of the finish work of the renovation and construction of the buildings under contact.