Dates : April 22, 2019 to present
Position : Mechanical Engineer
Name & Address of : Faisal Electro-Mechanical Company
Employer Al Khobar, Saudi Arabia
Business : General Contractor (Civil Works & Mechanical Works)
Duties and Responsibilities:
· Prepare of Materials take off of the projects.
· Prepare of MEP Shop Drawings.
· Checking of Fire Sprinkler System Design Calculation and FM200 Design Calculation.
· Supervision of installation of HVAC Ducting, Chiller Piping, AHU Piping, Fire Protection Piping, FM200 Piping, Domestic Water Supply Piping, Drainage System Piping and Medical Gas Piping.
· Perform Air Test & Hydro Test.
Dates : January 28, 2018 to April 15, 2018
Position : MEP Engineer
Name & Address of : ACME Engineering Consultancy
Employer Muscat, Oman
Business : Consulting Firm (Engineering & Design)
Duties and Responsibilities:
· Prepare of HVAC System Design (Using HAP Software by Carrier) and Fire Sprinkler System Design using Manual Calculation and Elite Software.
· Prepare HVAC Ducting Layout Design and Piping Layout Design.
· Prepare Fire Protection Sprinklers and Piping Layout Design.
· Prepare Water System Piping Layout Design.
· Prepare Bill of Quantities (BOQ).
Dates : October 20, 2014 to May 27, 2016
Position : Mechanical Engineer Consultant
Name & Address of : Dar Engineering
Employer Riyadh, Saudi Arabia
Business : Consulting Firm (Engineering & Design)
Project Cochlear Implant Unit in King Fahad Medical City
Duties and Responsibilities:
· Checking and Approving of Shop Drawings that submitted from Contractor such as Fire Protection Piping Layouts, FM200 Piping Layouts, HVAC Ducting Layouts & Piping Layouts, Domestic Water Supply Piping Layouts, Drainage System Piping Layouts and Medical Gas Piping Layouts.
· Checking of HVAC System Design Calculation, Fire Sprinkler System Design Calculation and FM200 Design Calculation.
· Prepare of HVAC System Design (Using HAP Software by Carrier) and Fire Sprinkler System Design using Manual Calculation and Elite Software.
· Weekly Coordination Meeting with the Clients, Co-Consultant Engineers and Contractor Engineers.
· Checking of Bill of Quantities (BOQ).
· Approving of Materials and Equipment Submittals that submitted from Contractor such as HVAC, Fire Protection, FM200, Plumbing and Medical Gas as per Project Technical Specifications.
· Supervision of installation of HVAC Ducting, Chiller Piping, AHU Piping, Fire Protection Piping, FM200 Piping, Domestic Water Supply Piping, Drainage System Piping and Medical Gas Piping.
· Supervision of installation of equipment such as Chillers, AHU’s, Fire Protection, FM200, Domestic Water Supply and Medical Gas.
· Check and Approving during Rough-in Inspection and Hydro Test Inspection of Fire Protection Pipelines, Domestic Water Supply Pipelines and Gravity Test of Drainage Pipelines.
· Check and Approving during Rough-in Inspection and Air Pressure Test Inspection of Medical Gas Pipelines.
· Check and Approving during Rough-in Inspection and Hydro Test Inspection Chiller Pipelines and AHU Pipelines.
· Testing and Commissioning of Fire Protection Pipelines, Water Supply Pipelines, Drainage System Pipelines and Medical Gas Pipelines.
Dates : March 16, 2011 to September 30, 2012
Position : Mechanical Engineer (MEP Engineer)
Name & Address of : Sky Oryx Joint Venture (Taisei – TAV)
Employer CP18 PO Box 55873, CP-18 Project Office, Doha, Qatar
Business : Main Construction Contractor of CP-18 Main Terminal Building
New Doha International Airport Project
Duties and Responsibilities:
· Supervision of installation of HVAC Ducting, Chilled Water Piping, Fire Protection Piping, Domestic Water Piping and Sanitary Piping.
· Supervision of installation of Waste Vacuum Piping.
· Prepare Request for Inspection (RFI) for Fire Protection Pipelines, HVAC Ducting, Chilled Water Pipelines, AHU’s Pipelines, FCU’s & CRAC Units Pipelines, FM200 Pipelines, Domestic Water Pipelines and Sanitary Pipelines.
· Supervision of installation of equipment such as FCU’s, AHU’s, CRAC Units, Fire Protection, FM200 and Domestic Water Supply.
· Perform Air Test & Hydro Test for Fire Protection Piping.
· Perform Hydro Test for Domestic Water Pipelines and Gravity Test for Sanitary Pipelines.
· Checking of HVAC System Design Calculation, Fire Sprinkler System Design Calculation and FM200 Design Calculation.
· Prepare of HVAC System Design (Using HAP Software by Carrier) and Fire Sprinkler System Design using Manual Calculation and Elite Software.
· Prepare Shop Drawings using AutoCAD.
· Perform project management to ensure that project progresses according to schedule and take appropriate corrective action when deviations arise.
· Prepare daily activities and daily on-site monitoring progress.
· Monitoring of quality assurance and performance of Sub-Contractors.
· Coordinate to Sub-Contractors for the completions and progress based on schedule or miles stone as per weekly monitoring progress meeting.
· Attending of weekly Coordination meeting to Main Contractor Engineers, Sub-Contractor Engineers with the Consultant Engineers (Bechtel Overseas Corporation & KEO International Consultants).
Dates : October 27, 2008 to October 26, 2010
Position : Mechanical AutoCAD
Name & Address of : Grain Silos & Flour Mills Organization
Employer King Fahad Road, Alsolia, PO 3402, Riyadh, Saudi Arabia
Business : Flour Mills Processing Plant
Duties and Responsibilities:
· Prepare drawing of General Site Layout for Proposed Plant Project.
· Prepare drawings and specifications for standard designed details.
· Prepare Planning Schedule for proposed project.
· Check and monitoring for the installation of Equipment and Machinery as per plan details.
· Coordinate Contractors and Sub-Contractor for the as-built drawing of equipment and machinery.
· Supervision of Hydraulic Equipment, Pneumatic Machinery, Pneumatic Pipelines.
· On-site plant inspection for the machinery rehabilitation and work progress, quality of workmanship.
· Prepare drawing for modification details and specifications.
Dates : August 5, 2007 to October 15, 2008
Position : Mechanical Engineer
Name & Address of : RJS Industrial Construction& Development Corporation
Employer km. 18, Tibungco, Davao City 8000, Philippines
Business : General Contractor (Civil Works & Mechanical Works)
Duties and Responsibilities:
Mechanical Estimator
· Prepare Cost Estimate (Materials, Labor, Equipment, Consumables and others) for the following project listed below.
– Project Stainless Packaging Conveyor.
– Caltex Gasoline Station.
– Industrial Processing Plant Machinery.
– Project Rehabilitation Packaging Conveyor.
– Davao Sugar Central Company
– Agumil Proposed Project Fabrication and installation of Kennel Silo, Clarifier Tank, Bucket Elevator and Warehouse Extension.
– Insular Oil Company
Project Oil Depot – 1.2 Million Liters Capacity of Diesel Tank
1.0 Million Liters Capacity of Gasoline Tank
1200 Kilo Liters Capacity of Bio-Diesel Tank
– Holcim (Cement Plant).
– Franklin Baker (Processing Plant).
– Phoenix Oil Company.
Piping Engineer
(Project: Insular Oil Company)
· Prepare shop drawings & technical specification details of Tank’s, Pipelines, Pumps, Pipe Trench, Pipe Supports, etc.
· Supervision of fabrication and installation of Piping, Pressure Vessel Tank’s, Flange’s, Fitting’s, Pump’s, Pipe Supports and etc.
· Supervision of fabrication, installation and erection of Shell Tank.
· Monitoring & inspection of work progress and quality for fabrication, erection and installation of Tank Shell’s, Pipelines, Pump’s, Flange’s, Fitting’s and etc.
· Monitoring of project schedule and activities for progress.
· Coordination Meeting by the Owner and Engineers.
Project Mechanical Engineer
(Project: Cotabato Sugar Central Company)
· Prepare shop drawing of Tanks, Piping, Pumps, Pipe Trench, Pipe Supports, etc.
· Supervision of fabrication works as per shop drawings & specification details and as per instruction.
· Supervision fabrication & installation and erection of Tanks, Mud Tanks, Structural Steel, Piping, Cyclone Scrubbers, Conveyors, Vessel Tanks and other Industrial Machinery.
· Supervision of sandblasting and painting works for Tank, Cyclone Scrubber’s and other Machinery.
· Prepare daily report and daily manpower activities.
Dates : August 2, 2004 to August 3. 2007
Position : Mechanical Engineer
Name & Address of : IED Engineering Sales and Services
Employer Don Ramon Village, Panacan, Davao City (Phils.)
Business : General Contractor (Civil Works & Mechanical Works)
Duties and Responsibilities:
· Preparing of materials and cost estimate
· Prepare Bidding Quotation for Proposal Project as per Client’s requirements.
· Supervision of on-going project on site.
· Supervision of Hydraulic Equipment, Pneumatic Machinery, Pneumatic Pipelines.
· Supervision of Mechanical works like a fabrication and installation of Pressure Vessel Tanks, Piping, Pumps, Blowers, Water Treatment Tank and other Industrial Machinery.
· Test and evaluate of the Equipment and Machinery before turn-over.
· Prepare weekly progress reports.
· Supervision of preventive maintenance of Pipelines, Pumps, Tanks and other Industrial Machinery.
· Supervision of Construction of 5 to 10 Cubic per day Capacity of Waste Water Treatment Plant.
· Supervision of fabrication and installation of WWTP Piping, WWTP Equipment and Water Treatment Tanks and Piping installation, Elevated Water Tank, Water Piping.
· Test commissioning of the Production Machinery, WWTP, WTP and etc.
· Supervision of preventive maintenance of pumps, motors, piping, filters and others equipment of WWTP and WTP.
· Project coordinator of Waste Water Treatment Plant and Water Treatment Plant.
Dates : July 3, 2003 to July 30, 2004
Position : Company Mechanical Engineer
Name & Address of : RDL Pharmaceutical Laboratory, Incorporated
Employer : Catitipan, Buhangin, Davao City (Phils.)
Business : Manufacturer of Cosmetics
Duties and Responsibilities:
· Supervision of Filler Machine, Labeling Machine, Unscrambler Machine, Cartooning Machine and others Machinery.
· Receive of Quotation for Outside Job Order.
· Monitoring of Weekly Checklist Report of Machine for the Preventive Maintenance.
· Supervision of Preventive Maintenance Motors, Pumps, Filler Machine, Labeling Machine, Unscrambler Machine, Mixing Tanks and other Machinery.
· Supervision of Construction of 15 to 20 Cubic per day Capacity of Waste Water Treatment Plant.
· Supervision of fabrication and installation of WWTP Piping, WWTP Equipment and Water Treatment Tanks and Piping installation, Elevated Water Tank, Water Piping.
· Test commissioning of the Production Machinery, WWTP, WTP and etc.
· Monitoring of Waste Water Treatment Plant of daily operation and Water Treatment Process for daily production supply.
· Prepare of monthly Preventive Maintenance Reports.
· Prepare Material’s Requisition for preventive maintenance request.
Dates : August 5, 2000 to April 30, 2003
Position : Designer/ Estimator
Name & Address of : Philippine-Japan Active Carbon Corporation
Employer Malagamot, Panacan, Davao City (Phils.)
Business : Manufacturer and Exporter of Activated Carbon
Duties and Responsibilities:
Designer/ Estimator
· Prepare drawing of Rotary Kilns, Dust Collectors, Belt Conveyor, Chain Conveyor, Screw Feeder, Rotary Dryer, Hopper and others Machinery for Proposed Project.
· Prepare Cost Estimate (Materials, Labor, Equipment, Consumables and others) for the Proposed Project.
· Design and details of Screw Feeder, Belt Conveyor, Chain Conveyor, Bucket Elevator, Hopper and Cyclone Scrubber.
· Design and details of Dryer Rotary Kiln.
· Prepare Project Schedule (Bar Chart).
· Received of Quotation for the Bidding of Proposed Project.
· Supervision of on-going project on site fabrication and installation of machinery likes Misc. Cyclones, Conveyors, Tanks, Dust Collector and others Machinery.
· Test and commissioning of machinery before turn-over this project.
Mechanical Engineer Supervisor
· Supervision of fabrication and installation of Bucket Elevator, Dust Collect, Cyclone Scrubber, Belt Conveyor, Screw Feeder and Hopper.
· Supervision of fabrication and installation of Pneumatic Piping, Pressure Vessel Tanks, Production Water Supply Piping and Domestic Water Piping and other Industrial Machinery.
· Supervision of Installation of Flange Bearing in Rotary Kiln, Motors, Dust Collector Blowers, Gears Motor and other Industrial Machinery.
· Supervision of preventive maintenance for Belt Conveyor, Bucket Elevators, Gear Motors, Bearings, Heavy Equipment, Motors, Pumps and other Industrial Machinery.
· Prepare Preventive Maintenance Checklist.
· Attending of coordination meeting with the Contractors, Engineering Managers and Production Engineers.
· Weekly Preventive Maintenance Meeting.
· Prepare Materials Requisition for preventive maintenance request.
EDUCATION: University of Mindanao
Matina, Davao City (Phils.)
Bachelor of Science in Mechanical Engineering
Year: 1994 – 1999
PROFESSIONAL: Member of Professional Regulation Commission (Phils.)
Registered Mechanical Engineer, License No. 0057109
Year Registered: July 7, 2000
TECHNICAL SKILLS:
· MS-Office (Word, Excel & Power Point) and MS-Project.
· AutoCAD, Autodesk MEP Rivet (Basic) and Autodesk Inventor (Basic).
· Computer Aided Calculation of Heating, Ventilating and Air Conditioning System Design (HVAC) using Hourly Analysis Program (HAP) from Carrier Air Conditioning and Commercial HVAC (CHVAC) from Elite Software Development Incorporated.
· Piping & Pump System Design using Manual Calculation and Computerized.
· Air Distribution (Duct) System Design using Manual Calculation.
· Computer Aided Calculation of Fire Sprinkler System Design using Fire Sprinkler System Design from Elite Software Development Incorporated and Manual Calculation.
TRAINING PROGRAMS ATTENDED:
· Computer Aided Design of Heating, – July 19 – 22, 2017
Ventilating and Air Conditioning (HVAC) System
· Computer Aided Sprinkler System Design – July 18, 2017
· Fire Sprinkler System Design and FDAS – Feb. 8, 2017
· People Based Safety Training Course – March 2011
· Basic Safety Training – Sep. 4 – 11, 2006
· Schneider Electric Technical Seminars – Oct. 9, 2003
· Fire Prevention & Fire Drill Seminars – Jan. 30 to Feb 7, 2003
PERSONAL DETAILS:
Date of Birth : January 1, 1977
Date of Place : Norala, South Cotabato (Philippines)
Nationality : Filipino
Gender : Male
Height : 5’3”
Weight : 58 kg.
Permanent Address : 67 Block B22 Lot 5 Phase 1 S.I.R. Matina, Davao City (8000)
Philippines
Passport Number : P1858434A
Date of Issue : 03 February 2017
Valid Until : 02 February 2022