Photo

Ian Degara Mechanical Engineer

Saudi Arabia

IAN E. DEGARA

Current Address: Al Khobar, Saudi Arabia

Permanent Address: 67 Block B22 Lot 5 Phase 1 S.I.R. Matina, Davao City (Philippines)

Mobile Phone No. :  +966 573214700

Email Address: [email protected] and [email protected]

OBJECTIVE:

Position in Mechanical Engineer, providing opportunity to make a strong contribution by utilizing and expanding upon related education, technical skills, work experiences and capabilities.

 

EMPLOYMENT HISTORY:

Dates                           :           April 22, 2019 to present

Position                       :           Mechanical Engineer

Name & Address of    :           Faisal Electro-Mechanical Company

Employer                                 Al Khobar, Saudi Arabia

Business                      :           General Contractor (Civil Works & Mechanical Works)

 

Duties and Responsibilities:

·         Prepare of Materials take off of the projects.

·         Prepare of MEP Shop Drawings.

·         Checking of Fire Sprinkler System Design Calculation and FM200 Design Calculation.

·         Supervision of installation of HVAC Ducting, Chiller Piping, AHU Piping, Fire Protection Piping, FM200 Piping, Domestic Water Supply Piping, Drainage System Piping and Medical Gas Piping.

·         Perform Air Test & Hydro Test.

 

Dates                           :           January 28, 2018 to April 15, 2018

Position                       :           MEP Engineer

Name & Address of    :           ACME Engineering Consultancy

Employer                                 Muscat, Oman

Business                      :           Consulting Firm (Engineering & Design)

 

Duties and Responsibilities:

·         Prepare of HVAC System Design (Using HAP Software by Carrier) and Fire Sprinkler System Design using Manual Calculation and Elite Software.

·         Prepare HVAC Ducting Layout Design and Piping Layout Design.

·         Prepare Fire Protection Sprinklers and Piping Layout Design.

·         Prepare Water System Piping Layout Design.

·         Prepare Bill of Quantities (BOQ).

 

Dates                           :           October 20, 2014 to May 27, 2016

Position                       :           Mechanical Engineer Consultant

Name & Address of    :           Dar Engineering

Employer                                 Riyadh, Saudi Arabia

Business                      :           Consulting Firm (Engineering & Design)

Project Cochlear Implant Unit in King Fahad Medical City

 

Duties and Responsibilities:

·         Checking and Approving of Shop Drawings that submitted from Contractor such as Fire Protection Piping Layouts, FM200 Piping Layouts, HVAC Ducting Layouts & Piping Layouts, Domestic Water Supply Piping Layouts, Drainage System Piping Layouts and Medical Gas Piping Layouts.

·         Checking of HVAC System Design Calculation, Fire Sprinkler System Design Calculation and FM200 Design Calculation.

·         Prepare of HVAC System Design (Using HAP Software by Carrier) and Fire Sprinkler System Design using Manual Calculation and Elite Software.

·         Weekly Coordination Meeting with the Clients, Co-Consultant Engineers and Contractor Engineers.

·         Checking of Bill of Quantities (BOQ).

·         Approving of Materials and Equipment Submittals that submitted from Contractor such as HVAC, Fire Protection, FM200, Plumbing and Medical Gas as per Project Technical Specifications.

·         Supervision of installation of HVAC Ducting, Chiller Piping, AHU Piping, Fire Protection Piping, FM200 Piping, Domestic Water Supply Piping, Drainage System Piping and Medical Gas Piping.

·         Supervision of installation of equipment such as Chillers, AHU’s, Fire Protection, FM200, Domestic Water Supply and Medical Gas.

·         Check and Approving during Rough-in Inspection and Hydro Test Inspection of Fire Protection Pipelines, Domestic Water Supply Pipelines and Gravity Test of Drainage Pipelines.

·         Check and Approving during Rough-in Inspection and Air Pressure Test Inspection of Medical Gas Pipelines.

·         Check and Approving during Rough-in Inspection and Hydro Test Inspection Chiller Pipelines and AHU Pipelines.

·         Testing and Commissioning of Fire Protection Pipelines, Water Supply Pipelines, Drainage System Pipelines and Medical Gas Pipelines.

 

Dates                           :           March 16, 2011 to September 30, 2012

Position                       :           Mechanical Engineer (MEP Engineer)

Name & Address of    :           Sky Oryx Joint Venture (Taisei – TAV)

Employer                                 CP18 PO Box 55873, CP-18 Project Office, Doha, Qatar

Business                      :           Main Construction Contractor of CP-18 Main Terminal Building

New Doha International Airport Project

 

Duties and Responsibilities:

 

·         Supervision of installation of HVAC Ducting, Chilled Water Piping, Fire Protection Piping, Domestic Water Piping and Sanitary Piping.

·         Supervision of installation of Waste Vacuum Piping.

·         Prepare Request for Inspection (RFI) for Fire Protection Pipelines, HVAC Ducting, Chilled Water Pipelines, AHU’s Pipelines, FCU’s & CRAC Units Pipelines, FM200 Pipelines, Domestic Water Pipelines and Sanitary Pipelines.

·         Supervision of installation of equipment such as FCU’s, AHU’s, CRAC Units, Fire Protection, FM200 and Domestic Water Supply.

·         Perform Air Test & Hydro Test for Fire Protection Piping.

·         Perform Hydro Test for Domestic Water Pipelines and Gravity Test for Sanitary Pipelines.

·         Checking of HVAC System Design Calculation, Fire Sprinkler System Design Calculation and FM200 Design Calculation.

·         Prepare of HVAC System Design (Using HAP Software by Carrier) and Fire Sprinkler System Design using Manual Calculation and Elite Software.

·         Prepare Shop Drawings using AutoCAD.

·         Perform project management to ensure that project progresses according to schedule and take appropriate corrective action when deviations arise.

·         Prepare daily activities and daily on-site monitoring progress.

·         Monitoring of quality assurance and performance of Sub-Contractors.

·         Coordinate to Sub-Contractors for the completions and progress based on schedule or miles stone as per weekly monitoring progress meeting.

·         Attending of weekly Coordination meeting to Main Contractor Engineers, Sub-Contractor Engineers with the Consultant Engineers (Bechtel Overseas Corporation & KEO International Consultants).

 

Dates                           :           October 27, 2008 to October 26, 2010

Position                       :           Mechanical AutoCAD

Name & Address of    :           Grain Silos & Flour Mills Organization

Employer                                 King Fahad Road, Alsolia, PO 3402, Riyadh, Saudi Arabia

Business                      :           Flour Mills Processing Plant

 

Duties and Responsibilities:

·         Prepare drawing of General Site Layout for Proposed Plant Project.

·         Prepare drawings and specifications for standard designed details.

·         Prepare Planning Schedule for proposed project.

·         Check and monitoring for the installation of Equipment and Machinery as per plan details.

·         Coordinate Contractors and Sub-Contractor for the as-built drawing of equipment and machinery.

·         Supervision of Hydraulic Equipment, Pneumatic Machinery, Pneumatic Pipelines.

·         On-site plant inspection for the machinery rehabilitation and work progress, quality of workmanship.

·         Prepare drawing for modification details and specifications.

 

 

Dates                           :           August 5, 2007 to October 15, 2008

Position                       :           Mechanical Engineer

Name & Address of    :           RJS Industrial Construction& Development Corporation

Employer                                 km. 18, Tibungco, Davao City 8000, Philippines

Business                      :           General Contractor (Civil Works & Mechanical Works)

 

Duties and Responsibilities:

Mechanical Estimator

·         Prepare Cost Estimate (Materials, Labor, Equipment, Consumables and others) for the following project listed below.

–          Project Stainless Packaging Conveyor.

–          Caltex Gasoline Station.

–          Industrial Processing Plant Machinery.

–          Project Rehabilitation Packaging Conveyor.

–          Davao Sugar Central Company

–          Agumil Proposed Project Fabrication and installation of Kennel Silo, Clarifier Tank, Bucket Elevator and Warehouse Extension.

–          Insular Oil Company

Project Oil Depot – 1.2 Million Liters Capacity of Diesel Tank

1.0 Million Liters Capacity of Gasoline   Tank

1200 Kilo Liters Capacity of Bio-Diesel Tank

–          Holcim (Cement Plant).

–          Franklin Baker (Processing Plant).

–          Phoenix Oil Company.

 

Piping Engineer

(Project: Insular Oil Company)

·         Prepare shop drawings & technical specification details of Tank’s, Pipelines, Pumps, Pipe Trench, Pipe Supports, etc.

·         Supervision of fabrication and installation of Piping, Pressure Vessel Tank’s, Flange’s, Fitting’s, Pump’s, Pipe Supports and etc.

·         Supervision of fabrication, installation and erection of Shell Tank.

·         Monitoring & inspection of work progress and quality for fabrication, erection and installation of Tank Shell’s, Pipelines, Pump’s, Flange’s, Fitting’s and etc.

·         Monitoring of project schedule and activities for progress.

·         Coordination Meeting by the Owner and Engineers.

 

Project Mechanical Engineer

(Project: Cotabato Sugar Central Company)

·         Prepare shop drawing of Tanks, Piping, Pumps, Pipe Trench, Pipe Supports, etc.

·         Supervision of fabrication works as per shop drawings & specification details and as per instruction.

·         Supervision fabrication & installation and erection of Tanks, Mud Tanks, Structural Steel, Piping, Cyclone Scrubbers, Conveyors, Vessel Tanks and other Industrial Machinery.

·         Supervision of sandblasting and painting works for Tank, Cyclone Scrubber’s and other Machinery.

·         Prepare daily report and daily manpower activities.

 

Dates                           :           August 2, 2004 to August 3. 2007

Position                       :           Mechanical Engineer

Name & Address of    :           IED Engineering Sales and Services

Employer                                 Don Ramon Village, Panacan, Davao City (Phils.)

Business                      :           General Contractor (Civil Works & Mechanical Works)

 

Duties and Responsibilities:

·         Preparing of materials and cost estimate

·         Prepare Bidding Quotation for Proposal Project as per Client’s requirements.

·         Supervision of on-going project on site.

·         Supervision of Hydraulic Equipment, Pneumatic Machinery, Pneumatic Pipelines.

·         Supervision of Mechanical works like a fabrication and installation of Pressure Vessel Tanks, Piping, Pumps, Blowers, Water Treatment Tank and other Industrial Machinery.

·         Test and evaluate of the Equipment and Machinery before turn-over.

·         Prepare weekly progress reports.

·         Supervision of preventive maintenance of Pipelines, Pumps, Tanks and other Industrial Machinery.

 

·         Supervision of Construction of 5 to 10 Cubic per day Capacity of Waste Water Treatment Plant.

·         Supervision of fabrication and installation of WWTP Piping, WWTP Equipment and Water Treatment Tanks and Piping installation, Elevated Water Tank, Water Piping.

·         Test commissioning of the Production Machinery, WWTP, WTP and etc.

·         Supervision of preventive maintenance of pumps, motors, piping, filters and others equipment of WWTP and WTP.

·         Project coordinator of Waste Water Treatment Plant and Water Treatment Plant.

 

Dates                           :           July 3, 2003 to July 30, 2004

Position                       :           Company Mechanical Engineer

Name & Address of    :           RDL Pharmaceutical Laboratory, Incorporated

Employer                     :           Catitipan, Buhangin, Davao City (Phils.)

Business                      :           Manufacturer of Cosmetics

 

Duties and Responsibilities:

·         Supervision of Filler Machine, Labeling Machine, Unscrambler Machine, Cartooning Machine and others Machinery.

·         Receive of Quotation for Outside Job Order.

·         Monitoring of Weekly Checklist Report of Machine for the Preventive Maintenance.

·         Supervision of Preventive Maintenance Motors, Pumps, Filler Machine, Labeling Machine, Unscrambler Machine, Mixing Tanks and other Machinery.

·         Supervision of Construction of 15 to 20 Cubic per day Capacity of Waste Water Treatment Plant.

·         Supervision of fabrication and installation of WWTP Piping, WWTP Equipment and Water Treatment Tanks and Piping installation, Elevated Water Tank, Water Piping.

·         Test commissioning of the Production Machinery, WWTP, WTP and etc.

·         Monitoring of Waste Water Treatment Plant of daily operation and Water Treatment Process for daily production supply.

·         Prepare of monthly Preventive Maintenance Reports.

·         Prepare Material’s Requisition for preventive maintenance request.

 

Dates                           :           August 5, 2000 to April 30, 2003

Position                       :           Designer/ Estimator

Name & Address of    :           Philippine-Japan Active Carbon Corporation

Employer                                 Malagamot, Panacan, Davao City (Phils.)

Business                      :           Manufacturer and Exporter of Activated Carbon

 

Duties and Responsibilities:

Designer/ Estimator

·         Prepare drawing of Rotary Kilns, Dust Collectors, Belt Conveyor, Chain Conveyor, Screw Feeder, Rotary Dryer, Hopper and others Machinery for Proposed Project.

·         Prepare Cost Estimate (Materials, Labor, Equipment, Consumables and others) for the Proposed Project.

·         Design and details of Screw Feeder, Belt Conveyor, Chain Conveyor, Bucket Elevator, Hopper and Cyclone Scrubber.

·         Design and details of Dryer Rotary Kiln.

·         Prepare Project Schedule (Bar Chart).

·         Received of Quotation for the Bidding of Proposed Project.

·         Supervision of on-going project on site fabrication and installation of machinery likes Misc. Cyclones, Conveyors, Tanks, Dust Collector and others Machinery.

·         Test and commissioning of machinery before turn-over this project.

 

Mechanical Engineer Supervisor

 

·         Supervision of fabrication and installation of Bucket Elevator, Dust Collect, Cyclone Scrubber, Belt Conveyor, Screw Feeder and Hopper.

·         Supervision of fabrication and installation of Pneumatic Piping, Pressure Vessel Tanks, Production Water Supply Piping and Domestic Water Piping and other Industrial Machinery.

·         Supervision of Installation of Flange Bearing in Rotary Kiln, Motors, Dust Collector Blowers, Gears Motor and other Industrial Machinery.

·         Supervision of preventive maintenance for Belt Conveyor, Bucket Elevators, Gear Motors, Bearings, Heavy Equipment, Motors, Pumps and other Industrial Machinery.

·         Prepare Preventive Maintenance Checklist.

·         Attending of coordination meeting with the Contractors, Engineering Managers and Production Engineers.

·         Weekly Preventive Maintenance Meeting.

·         Prepare Materials Requisition for preventive maintenance request.

 

 

EDUCATION:          University of Mindanao

Matina, Davao City (Phils.)

Bachelor of Science in Mechanical Engineering

Year: 1994 – 1999

PROFESSIONAL:   Member of Professional Regulation Commission (Phils.)

Registered Mechanical Engineer, License No. 0057109

Year Registered: July 7, 2000

TECHNICAL SKILLS:

·         MS-Office (Word, Excel & Power Point) and MS-Project.

·         AutoCAD, Autodesk MEP Rivet (Basic) and Autodesk Inventor (Basic).

·         Computer Aided Calculation of Heating, Ventilating and Air Conditioning System Design (HVAC) using Hourly Analysis Program (HAP) from Carrier Air Conditioning and Commercial HVAC (CHVAC) from Elite Software Development Incorporated.

·         Piping & Pump System Design using Manual Calculation and Computerized.

·         Air Distribution (Duct) System Design using Manual Calculation.

·         Computer Aided Calculation of Fire Sprinkler System Design using Fire Sprinkler System Design from Elite Software Development Incorporated and Manual Calculation.

 

TRAINING PROGRAMS ATTENDED:

·         Computer Aided Design of Heating,              –           July 19 – 22, 2017

Ventilating and Air Conditioning (HVAC) System

·         Computer Aided Sprinkler System Design    –           July 18, 2017

·         Fire Sprinkler System Design and FDAS      –           Feb. 8, 2017

·         People Based Safety Training Course                        –           March 2011

·         Basic Safety Training                                      –           Sep. 4 – 11, 2006

·         Schneider Electric Technical Seminars          –           Oct. 9, 2003

·         Fire Prevention & Fire Drill Seminars            –           Jan. 30 to Feb 7, 2003

 

PERSONAL DETAILS:

Date of Birth               :           January 1, 1977

Date of Place               :           Norala, South Cotabato (Philippines)

Nationality                  :           Filipino

Gender                        :           Male

Height                         :           5’3”

Weight                        :           58 kg.

Permanent Address    :           67 Block B22 Lot 5 Phase 1 S.I.R. Matina, Davao City (8000)

Philippines

Passport Number         :           P1858434A

Date of Issue               :           03 February 2017

Valid Until                  :           02 February 2022