Photo

JOEL D MONTALLON Telecommunications Technician/ Fiber Optic Splicer

Philippines
DrivingFiber optic splicingLeadership SkillsMicrosoft Office

Joel D. Montallon

Address: 734 J. P. Rizal Avenue, Makati City 1208

Mobile No.: +639153405817

Email Address: [email protected]

 

Work Experience:

Ø  GRAB Car Philippines

o   Position: GRAB Car Driver

o   Duration:

§  May 7, 2018 up to present

§  July 20, 2016 to March 31, 2017

o   Work Details:

§  Driving own car under GRAB, servicing passengers using a ride hailing and ride sharing platform using its application.

 

Ø  Baud Telecom Company – BTC Networks (Saudi Arabia)

o   Position: Telecom Technician/ Fiber Optic Technician/VSAT Technician

o   Duration: April 26, 2017 to April 30, 2018

o   Work Details:

§  Driving company issued car to assigned sites

§  Conducts survey, installation, troubleshooting and maintenance of satellite communications system for Saudi Electric Project

§  Conducts survey on possible sites for Metro Ethernet Project for Saudi Electric Company

§  Installation of Optical Distribution Frame

§  Laying Fiber Optic Cables, splicing and testing Fiber Optic Cables

§  Creates FC and LC Patch Cord (Fiber Optics)

§  Installation of Audio Visual Equipment (Creston) for Video Conferencing

§  Installation of TNU1 Cabinet of Saudi Electric Company

 

Ø  MEC Networks (Sub-Contractor of Huawei)

o   Position: Telecom Team Leader

o   Duration: October 9, 2015 to August 31, 2016

o   Work Details:

§  Installation of Huawei FDD/TDD Projects

§  Commissioning of RTN950 transmission for SMART Turbo Projects

§  Testing using ANRITSU testers for throughput test

 

Ø  IGTL Network Services Philippines, Inc. (Sub-Contractor of Huawei)

o   Position: Telecom Installer/ Rigger

o   Duration: February 2015 to September 2015

o   Work Details:

§  Installation of Huawei FDD/TDD Projects

§  Commissioning of RTN950 transmission for SMART Turbo Projects

§  Testing using ANRITSU testers for throughput test

 

Ø  Baud Telecom Company – BTC Networks (Saudi Arabia)

o   Position: Telecom Technician/ Fiber Optic Technician

o   Duration: June 22, 2011 up to November 30, 2014

o   Work Details:

§  Splicing and Testing Fiber Optic Cables

§  Creates FC and LC Patch Cord (Fiber Optics)

§  Installer of Audio Visual Equipment (Creston) for Video Conferencing

§  Installer of TNU1 Cabinet of Saudi Electric Company

 

Ø  Top Express Infrastructure (Sub-Contractor of Huawei)

o   Position: Technician/Installer/Rigger

o   Duration: May 24, 2010 up to March 4, 2011

o   Work Details:

§  Installation of Huawei Antenna Andrew Type

§  Installation of net engine quidway(NE40SERIES & 5000e SERIES) IPPB project for PLDT backbone expansion project.

§  Swap-out of Nokia Flexi-BTS 3G to Huawei Antenna

§  Commissioning of Huawei BTS with troubleshooting

 

Ø  Phil SK. Hwain E&C (Sub-Contractor of Huawei)

o   Position: Team Leader/ Surveyor/Commissioner

o   Duration: October 2, 2008 up to February 15, 2010

o   Work Details:

§  Operation and Maintenance (sub-con)

§  Survey of Line of Site for expansion of Huawei equipment transmission

§  Survey for Wimax BTS Huawei equipment

 

Ø  Crown Crest Telecom Construction Services Corporation

(Sub-Contractor of Carenett Philippines)

o   Position: Telecoms Team Leader/Technician

o   Duration: year 2006 up to September 2008

o   Work Details:

§  Erection of 18-meter Tripod Tower

§  In Building Projects (IBS, DAS Installation) for Globe Telecom Projects

§  Repeater BTS 2W for Globe Telecom Project

§  Installation of RBS BTS for Sony Ericsson Projects

§  Mounting Pole Installation for Microwave and BTS Antenna

§  Nokia FlexiBTS for 2G for Smart Telecommunications and 2G & 3G for Globe Telecom Projects

§  Nokia FlexiHopper Transmission with Commissioning

 

Ø  Carenett Philippines Incorporation

(Sub-Contractor of NOKIA SIEMENS NETWORK)

o   Position: Telecoms Team Leader/ Telecoms Installer (freelancer)

o   Duration: year 2007 up to September 2008

o   Work Details:

§  Nokia FlexiBTS for 2G Smart Telecommunications Projects

 

 

Educational Attainment/Trainings/Seminars:

 

Trainings/Seminars                       :           Fiber Splicing Seminar

for Saudi Electric Project

Al-Khobar, Saudi Arabia

 

Secondary                             :           Amparo High School

Dao St. Amparo Subd., Caloocan City

Graduated in 2002

 

Primary                                 :           Amparo Elementary School

Mabolo St. Amparo Subd., Caloocan City

Graduated in 1998

 

 

Driving Eligibility:

Ø  Has a Professional Driver’s License in the Philippines with No. N03-08-029248, valid until May 18, 2022.

Ø  Had been issued Driving License in Kingdom of Saudi Arabia with No. 2434273096, valid until March 31, 2022, but surrendered upon exit from the Kingdom of Saudi Arabia.

 

 

Character References:

Ø  Michael Alonzo

Project Engineer

ZTE Philippines, Inc.

+639216080474

Ø  Cesar H. Aboy

Vice President

MEC Networks

+639228668857

 

I hereby certify that the above information contained herein are true and correct to the best of my knowledge and capability.

Joel D. Montallon