Photo

John Benito Penchog Civil Engineer

Benguet, Philippines

RÉSUMÉ

JOHN BENITO PENCHOG

Civil Engineer / Construction Manager / Superintendent

Mobile Phone No.: +639190024907

E-Mail Add: [email protected]

 

Profession

·         Civil Engineer (CE): Registration No. 0041144 – Professional Regulatory Commission (PRC). (Passed Philippine Civil Engineering Board/Licensure Examination in Manila on November 29 & December 01, 1984)

 

Skills / Practices (From latest)

Title / Position                                 Company / Firm                                                 Duration / Period

Engineer II / Site Civil                       Saudi Aramco / AlHoty                                    Jan.2014 up to Oct. 16,

Superintendent                                    Co. Ltd.-Vendor (KSA)                                                    2019

Construction Mngr.                             Euro Products, Inc. (Phil)                               Nov. 2012 to Dec. 2013

Construction Mngr.                             EKC Const’n & Aggregates (Phil)                  May 2011 to Mar. 2012

Site Supervisor                                   Allutos Company LMP (Libya)                        July 2010 to Feb. 2011

Site Agent                                           Spoletini Costruzione (Libya)                           July 2009 to July 2010

Mar.2007 to June 2008

Civil Engineer                          AlManara Eng’g/Consult’g-Libya                             July 2008 to June 2009

Site Engineer                          LADICO – Libya                                                            Jan. 2006 to Feb. 2007

Site Engineer                          DUA Eng’g & Maint. Co.-Libya                                 May 2005 to Jan. 2006

Project Engineer                                 920 Factors & Ent., (Phil)                             May 2001 to Apr 2005

Civil Superintendent                            Raytheon-Evasco Overseas Ltd.                May 1999 to May 2001

Engineer “A”                                        National Power Corp. (Phil)                          Mar.1997 to May 1999

Project Foreman                                 RAF Gen Const’n. (Phil)                                 Jan. 1986 to Mar. 1996

 

Proficiencies / Experiences / Involvements

·    34 years total Experience in the Construction Industry (EPC/EPCM), including 3 years with Philippine Gov’t’s GOCC & 10 years in the OIL & GAS Industry:

Ø  Project Management, Site / Civil Engineering, Cost Estimating / Quantity Surveying, Superintendence & Consultancy (Local & Overseas)

Ø  Construction / Erection of various Infrastructure Projects such as, Roads, Bridges, Railcar Facilities, Dams, Slope Protection Works, River Training Works, Flood protection Works, Steel Tanks – Sulfur / Water Reservoir, etc. (Local & Overseas)

Ø  Diverse Construction of Buildings & Facilities (Local & Overseas)

Ø  Oilfield (National Oil Co.) Projects: Maintenance Bldg. Construction, Sewer Lift Stations & Sewer Network Construction, Sewage Treatment Plants, Petrochemical Plant Maintenance Works (Libya)

Ø  Gas Facilities (Saudi Aramco) Projects: Ju’aymah Gas Plant-Renovation of Firewater Network; Construction of Sulfur Railcar Loading Facilities [SRLF] @ 3 sites – Wasit Gas Plant, Berri Gas Plant & Khursaniyah Gas Plant (Eastern Province, KSA)

Ø  Gas Compression (Saudi Aramco) Projects: Temporary Construction Facilities @ 3 Sites in Haradh (Eastern province, KSA)

·         Briefs highlighting my Experiences under each of the Construction Categories (Itemized from latest):

ROADS:

Ø Saudi Aramco-Temp. Const’n Facilities (TCF) Projects: Construction of Access Roads & Facility Roads (asphalting), and Patrol/Fenced Roads (Haradh, KSA)

Ø Saudi Aramco-SRLF Project: Construction/Asphalting of Access Roads, Facility Roads and Patrol/Fenced Roads @ Wasit, Berri, Khursaniyah (Eastern Prov., KSA)

Ø Al Bayda City Government Project: Road Network Construction and Asphalting (Al Bayda, Libya)

Ø Raytheon-Evasco Overseas Ltd. – San Roque Multipurpose Dam Project (REOL-SRMDP): Construction of various Access Roads for Dam Proper Embankment (Phil.)

Ø National Power Corporation – San Roque Multipurpose Dam Project (NPC-SRMDP): Construction of Main Access Road – Rd 4 (Phil.)

Ø Department of Agriculture (DA); Department of Public Works & Highways (DPWH): Various Concreting Road Projects (Phil.)

BRIDGES:

Ø  Local Government Unit of Benguet: 40 Meter Length & 35 Meter Length Austrian / European Type Modular Steel Bridge, 2 Construction sites/towns in Benguet (Phil.)

Ø  National Power Corporation – San Roque Multipurpose Dam Project (NPC-SRMDP): Rehabilitation/Extension (50m span length out of 4 a spanned bridge) on a Main Road to Dam Proper Area in Pangasinan (Phil.)

DAMS:

Ø  Raytheon-Evasco Overseas Ltd. – San Roque Multipurpose Dam Project (REOL-SRMDP): Construction of 7 KM. length (Dam material) Conveyor; Grouting Work on the Dam Proper Location in Pangasinan (Phil.)

Ø  Benguet Corporation: Earth Dam Construction for Gold Ore Tailings’ Pond in Benguet (Phil.)

BUILDINGS / STRUCTURES:

Ø  Saudi Aramco-Temp. Const’n Facilities (TCF) Projects: Construction of Portacabin Buildings for Accommodations, Office Buildings, Kitchen & Dining Buildings, IT Communication Building, Water Supply & Waste Water Facilities, Fire Fighting Facilities, Guardhouses, etc. in Haradh (Eastern Prov., KSA)

Ø  Saudi Aramco-SRLF Project: Railcar Loading Shelter/Building, Operation, Maintenance & Engineering (OME) Building, Electrical Sub-stations, Gatehouse & Security Support Building (Buildings adjacent to Wasit Gas Plant (Eastern Prov., KSA).

Ø  Department of Agriculture; University of the Philippines: 3 Building Constructions inside the Campus of University of the Philippines in Los Baños, Laguna (Phil.)

Ø  National Oil Company (NOC): Ghani Oil Field Maintenance Building Construction; Refurbishment of Omar Al Mukhtar University Buildings; Ain Zara Housing Complex Project in Ghani & Benghazi (Libya)

FIREWATER / SEWERAGE / DRAINAGE NETWORKS:

Ø  Saudi Aramco-SRLF Project & Ju’aymah Gas Plant Project: Firewater Network Construction; Oily Water System (OWS) & Stormwater Network System; Sanitary Network System (Wasit, Berri, Khursaniyah); Ju’aymah Firewater Network Upgrade.

Ø  Al Bayda City Government Project: Al Bayda Storm & Sewerage Network Project

Ø  National Oil Company (NOC): Upgrading of Field Sewerage System for Mislah Oil Field and Nafoora Oil Field (Mislah & Nafoora, Libya).

 

 

TURN AROUND MAINTENANCE WORK:

Ø  National Oil Company (NOC): Marsha El Brega Petrochemical Plant Turn-around Work in Marsha El Brega (Libya)

SLOPE PROTECTION PROJECTS:

Ø  Raytheon-Evasco Overseas Ltd. – San Roque Multipurpose Dam Project (REOL-SRMDP): Rip-rapping Work, Shotcrete Work, Gabion Work for Slope Protections in Pangasinan (Phil.)

Ø  Department of Agriculture; Department of Public Works & Highways: Construction of various Slope Protection Structures – Gabion, Shotcrete, Rip-rap, etc. in various locations (Phil.)

COMMUNITY RESERVOIR TANKS:

Ø  Benguet Corporation: Erection / Dismantling of Pre-Fabricated Steel Tanks (Phil.)

 

·    Additional Information:

A recipient of the Philippine Government’s – National Integration Scholarship Grant Program (NISGP) that enabled me to complete my Bachelor of Science in Civil Engineering (BSCE) at the Saint Louis University (SLU), Baguio City, Philippines.

Member of PICE (Philippine Institute of Civil Engineers)

 

·    Job Experience Prior to attending University:

Worked as Mill man for 2 years in a chromite ore mining company in Coto Mines in Masinloc, Zambales, Philippines prior to attending University.

 

·    Completed Technical Courses:

A-CADD 2D & 3D; PRIMAVERA 6

 

Employment History (From latest)

Company: Saudi Aramco (SA) / AlHoty Co. Ltd. (AHCL)

Projects & Dep’t: Upgrade of Firewater Systems (Jua’ymah) under Gas Facilities Projects Dep’t (GFPD); Sulfur Railcar Loading Facilities (Wasit, Berri, Khursaniyah) under Gas Facilities Projects Dep’t (GFPD); Temporary Construction Facilities TCF-1, 2, 3 (Haradh) under Gas Compression Projects Department (GCPD)

Location: Eastern Province, Kingdom of Saudi Arabia (KSA)

Job Brief Description / Accomplishment:

Lately, under Saudi Aramco Project Management Team (SAPMT), I was with Infrastructure & Support Division under the Gas Compression Projects Department, assigned in TCF-1 (largest out of 3 TCF’s) for the constructions of Temporary Construction Facilities programmed for a 20 or more year life-span, such as, Road Construction (21Km Asphalt), Portacabin Buildings for Camp & Offices (500 Bldgs.), Sewage Treatment Facilities (STP) including a Lift Station, Fuel Station, Switch Gears with Diesel Generators, Water Treatment Plant (RO), IT Communication Utilities, etc.

Prior to my above assignment, I was one of the Site Civil Superintendents for the Construction of the Sulfur Railcar Loading Facilities (SRLF) Project (>USD500Million), handling the Civil Engineering work items – Infrastructure and Buildings, including the underground utilities works for Sanitary-Water & Wastewater, Fire Fighting network, etc., enabling the collaborative completion of the construction and commissioning of said Facilities and the linking with the Saudi Arabian Railway (SAR) company, for the bulk and speedy delivery of molten Sulfur to the factory site in Al Maaden, Ras Al Kair.

Company: Euro Products, Inc.

Projects: Construction of Agri. Buss. Ctr. For Entrepreneurship Bldg., UPLB; Rehab. Of Fish Health Lab, DA; Repair of 2-Storey Multi-Purpose Warehouse with Roof Deck, DA; Rehabilitation of 2-storey Office & Library, DA; Refurbishment & Extension of UPLB Foundation Bldg.

Location: Los Baños, Laguna, Philippines

Job Brief Description / Accomplishment:

Managed the construction projects mentioned including cost control through the proper selection of equipment, materials and manpower for use in the project. Anticipate and pro-actively involved myself with the potential issues and concerns that could crop-up so as to avoid disruptive / unwanted problems.

Company: EKC Construction & Aggregates

Projects: Improvement Works along Kennon Road; San Roque Multipurpose Dam (SRMD) Camp Facilities Refurbishment Project; Improvement & Concreting of Lamut Road.

Location: Benguet, Philippines

Job Brief Description / Accomplishment:

Preparation of Bids / Tenders including Quantities, Estimates, Material-Take-off. Managed construction projects including cost control through the proper selection of equipment, materials and manpower for use in the project. Monitor actual performance and quality of contractor’s projects milestones.

Company: Allutos (LMP) Company

Project: New Field Maintenance Workshop – Ghani

Location: Ghani (Oil) Field, Libya

Job Brief Description / Accomplishment:

I was hired as a Site Supervisor to coordinate with the Harouge Oil Operations (HOO) for the company to manage the construction of the above Workshop (Industrial) Building. I was also responsible in the planning, supervision of the daily activities while also preparing the day to day planned activities. And, I was responsible still in doing the surveying works needed in the excavation and backfilling works while also, attended the required daily meeting with the client’s superintendent. Prepared the needed daily, weekly reports being required by the client, and importantly, the monthly billing/invoice for the company.

Company: Spoletini Costruzione

Project: Upgrading of Sewerage Networks in Mislah and Nafoora Oilfields; Zliten Housing Project; Turnaround Maintenance Work for Marsha El Brega Petrochemical Plant

Locations: Tripoli, Mislah, Nafoora, Ras Lanuf, Brega, (All in Libya)

Job Brief Description / Accomplishments:

Preparation of Tender documents for bidding purposes for sub-contracting. Supervised the upgrading of Sewerage network in Mislah and Nafoora Oilfield. Managed the repair and construction of temporary structures for the accommodation of workers and the preparation of shops for carpentry, steelworks and other purposes. Quantity surveying work using the Microsoft Excel software for the pre-construction activities and also during execution of the above projects.

Performed actual surveying works like leveling and laying out of buildings.

Served as Team Leader for the Turnaround Maintenance Work in the petrochemical plant – Ammonia and Urea Plants in Brega, Libya.

Company: Al Manara Consultancy & Engineering

Project: Ain Zara Housing Complex Project

Location: Tripoli, Libya

 

 

 

Job Brief Description / Accomplishments:

I was assigned as an Inspector (Consultant) for the construction of 5 to 9 storey buildings, from lay – out of the said buildings to erection of the corresponding structures / building frames (Structural) for 5 building units of which a one storey floor area has more or less than 900 sq. m. Responsible for the checking and inspecting all civil works / structures, and the recommending of approval prior to the implementation of subsequent activities and billings of completed structures.

Company: Libyan Arab Domestic Investment Co. (LADICO)

Project: Hey El – Zohour 760 Housing Unit

Location: Tripoli, Libya

Job Brief Description /Accomplishments:

Preparation of Weekly, Bi-monthly & Monthly Schedule of activities for the Construction of 8 units of 9storey buildings, and also the Finishing works of 4 units of 9-storey buildings; Supervised/Monitor the execution of said scheduled activities; Prepare the Bar Cutting & Bar Bending Schedules of a 10-Storey Building structural work; Monitored Works & Coordinated with Sub – Contractors of PVC, Aluminum doors & windows (4 bldgs.), Graphite painting (1-9 Storey Bldg.) and Prepare the needed documents of accomplishments for sub-contractors’ invoices / billings.

Company: DUA Construction & Maintenance, Inc.

Project: Storm & Sewerage Network Project / Asphalting

Location: Al Bayda, Libya

Job Brief Description / Accomplishments:

Prepare surveying(Leveling) data for trenching / excavation activities; Perform the actual site Surveying Work for computations of excavation depths with the specified trenches’ slopes, and simultaneously supervising the excavation of said trenches. Also, supervise the pre-asphalting work of a 5 km. road network project in the same project site. Supervise the installations of Reinforced concrete manholes, Gullies and pipes.

Company: 920 Factors & Enterprise

Project: Laboratory Building; Livestock Buildings; Perimeter Fence; Roadway Concrete Paving; Modular Austrian Type Steel Bridges

Location: Benguet, Philippines

Job Brief Description/ Accomplishments:

Manage the start until completion of the above projects. One of the modular steel bridges was erected in a remote area where a mobile crane cannot be made available for the lifting of heavy steel parts, wherein, creativity was the tool to the completion of this particular project.

Company: Raytheon – Ebasco Overseas Ltd. (REOL)

Project: San Roque Multipurpose Project (Construction of Dam proper, Access roads, Conveyor System Foundations, Slope protection works)

Location: Pangasinan, Philippines

Job Brief Description/ Accomplishments:

Manage the works and activities that are needed in the Re-construction / Construction of Conveyor and Machines Foundations which was initially started but was not properly constructed prior to my employment with the company, where I was able to facilitate the shortening of work schedule to 50 %. Also, supervise activities at the Dam site grouting work.

Facilitate several actual site activities that are urgent but were not specifically programmed activities which I initiated thru practical knowledge and innovations resulting to further reduction of delays encountered, owing to the rainy season and problems encountered at the site.

Company: National Power Corporation (NPC)

Project: San Roque Multipurpose Project (Hydro-Electric Dam Construction)

Location: Benguet & Pangasinan, Philippines

Job Brief Description / Accomplishments:

I was designated as the Inspector for the construction of the main road going to the main dam project site – Road 4 (Road Opening and Gravelling Works) and the Rehabilitation of a 300m Bridge on same road. Also, supervise the construction of the 500 units’ house buildings for the resettlement area of Dam affected residents.

I monitor the projects under the Social Acceptance Campaign Fund granted to the affected municipalities/barangays and interact with the Local Government units/authorities wherein some resistance from the local communities were being instigated against the above project.

Company: RAF General Contractor

Project: Earth Dam, Penstock, Spanish Drainage, Masonry-Slope Protection Works, Ore Shade Structure, River Training Works, Roadway Rehabilitation Works, Waterway Diversion Works

Location: Benguet, Philippines

Job Brief Description/ Accomplishments:

Execution of activities for the implementation of Penstock Construction for the Earth Dam; Construction of Diversion Tunnel and Spanish Drainage for the subsequent Earth Dam Construction; Rehabilitation of Massive Stone Masonry for the Slope Protection; Implementation of a River Training Works for Flood Control; Repair / Renovations of Machines and structures Foundations at the Mine Processing Plants; Implementation of the Construction of Ore Sheds and Public Toilets; Implementation of The Rehabilitation of Roadway, including Construction of Retaining Walls, Culvert Installations, and Widening Works.

 

Saudi Aramco Safety Learning System

Name / Title                                                                                       Status
Fall Protection Requirements                                                     Successful
Industrial Radiography Safety Inspection                                Successful
Application of Saudi Aramco Sanitary Codes                          Successful
e-CONFINED SPACE ENTRY                                                    Successful
Injury Reporting and Investigation (TCD)                              Successful
Hydrogen Sulfide? The Invisible Hazard                                 Successful
Preventing Overexertion and Heat Stress                                Successful
Minimum Medical Standards Requirements                          Successful
Safety Handbook II – Basic Safety Rules (TCD)                      Successful
Safety Handbook III – Operational Safety Processes (TCD) Successful
Hazard Recognition (TCD)                                                          Successful
Four Critical Behaviors (4CB)                                                     Successful
Preventing Struck-By/Caught-In-Between Incidents            Successful
MIS IS-01e: Information Security Essentials(SAP)                Successful
MIS IP-02e PHISHING (SAP)                                                    Successful
Safety Handbook I – Emergency Actions – Introduction –

LP Policy – and Safety Responsibilities (TCD)                                   Successful
Hazard Recognition (TCD)                                                                     Successful
Fire Safety Awareness (TCD)                                                                  Successful
Understanding Contractor Safety Administrative Requirements   Successful
Steel Erection Safety Inspections                                                           Successful
Introduction to Operational Excellence (OE 101)                               Successful
Gas Testing (TCD) v5                                                                                Successful
Abrasive Blasting and Coating Safety Inspections                             Successful
Safety Handbook IV – Safety Topics (TCD)                                         Successful
Safe Traffic Control on Construction Sites                                          Successful
PM – Safety Management System Overview & Implementation     Successful
Safety Requirements for Concrete Construction Work                    Successful
Understanding Contractor Safety Administrative Requirements  Successful
Near-Miss [TD BET 40068634]                                                            Successful
Driver Improvement Program Refresher (DIPR) (English)            Successful
Trainings / Seminars Attended (Pertinent to Engineering/Construction Works)

Basic Supervisory Development Course (Civil Service Commission)

Labor-Based Method of Construction (International Labor Org.)

Training on Technical Writing (Dept. of Agriculture-Phil.)

Conference on Concrete Art, Science and Technology (Phil. Institute of Civil Engineers-PICE)

Supervisor’s Safety Trainings (Raytheon Evasco Overseas Ltd.)

National Symposium on Geotechnical Engineering (PICE)

Fall Protection Trainings (Raytheon Engineering & Construction)

Personal Development for Safety Training (REOL)

Trench & Excavation Safety Training (REOL)

Symposium on Disaster Prevention & Mitigation of Buildings & Bridges (PICE)

Supervisor’s Training on Accident Reduction Techniques (REOL)

 

 

 

 

 

 

 

Prepared by / Certified True & Correct:

 

JOHN B. PENCHOG

Name & Signature

Applicant