SUMMARY
I am an experienced Industrial Engineer in the field of Food manufacturing and logistics operations. My passion and dedication to food manufacturing and consumer goods process allowed me to successfully assume various roles in the areas of Supply Chain.
HIGHLIGHTS OF QUALIFICATIONS
Professional
Five years productive years of professional development and experience in Industrial Engineering applied in Food Manufacturing and Logistics industries.
Successfully took the process of progressing from handling 1 Manufacturing Site to 3 Manufacturing Sites.
Able to be assigned on to support on the Manufacturing Expansion Projects.
An effective problem solver, with sound judgment and decision-making ability.
· Above average communication skills on both English language comprehension and English language production.
· Have experienced to have collaboration project with R&D, logistic, Supply Planning and Engineering.
Technical
Experienced in monitoring and analyzing manufacturing key performance indicator: Equipment efficiency, Unit per Manhour and Capacity Utilization.
Experienced on conducting Time and Motion Study, Value Stream Mapping, Line Balancing, Manpower and Equipment requirement computation.
Experienced on reviewing and updating Production Standards: output rates, line manning, product yields, materials usage/wastage, productivity and line performance indices.
High competency in using Microsoft computer applications, (MS excel, MS Powerpoint, MS sharepoint, MS Visio, MS Power BI).
EMPLOYMENT HISTORY
Industrial Engineering Specialist June 17, 2013 – August 30, 2018
Zenith Foods Corporation – Philippines
Accomplishments:
Achieved to update the Production Standards of Red Ribbon Bakeshop Commissary in the Philippines Nationwide on an annual basis.
Achieved to update the Production Standards of Mang Inasal Commissary in the Philippines Nationwide on an annual basis.
Achieved to update the Production Standards of Greenwhich Commissary in the Philippines Nationwide on an annual basis.
Initiated a work group team between the Logistics group, Supply Planning group and Site Support group to improve the Plant overall KPI from 70% to 90%.
Able to update the Overall Equipment Effectiveness and Unit per Manhour excel template of the assigned Manufacturing Plants.
Conducted RCA of Customer Service Group incoming calls and emails.
Initiated to use a Time & Motion Study software tool to improve the Industrial Engineering Department’s Time and Motion Study activities.
Provides support on Logistics Project: Cross Docking and 2 Day Order Leadtime.
Able to design a Production Area Layout using excel for a New Plant Expansion Project.
Computed the Manpower month requirement for a year, based on the forecast supply volume of whole chickens for Mang Inasal Commissary.