An enthusiastic and highly motivated individual who has a clear understanding to the role and responsibilities associated with being a civil engineer.
As Technical Engineer, my duties and responsibilities are:
• Site based and site oriented engineer who is in charge of a specific part of a construction project.
• Responsible for ensuring that the site is supplied with all documentation, methods and materials needed to carry out the works.
• Prepared construction method statements and risk assessments, and developed work methods and temporary works necessary for the area.
• Prepared shop drawings and site related designed drawings.
• Developing job safety analysis.
• Follow up on the permanent work design and coordinated with the site.
• Coordinated on a daily basis with the subcontractors, and assist in the preparation of the work requisition for the subcontracted works.
• Prepared technical and commercial comparison sheets of offers received from the subcontractors, and follow up of the subcontracted works, including the payment applications.
• Prepared work requisition for all required permanent materials, and prepared material submittals and follow-up of the approval processed.
• Follow-up on the deliveries and invoicing of the materials.
• Anticipated standard solutions and take initiative and make suggestions.
• Demonstrated responsibility and ownership and report spontaneously to manager.
• Summarize data in a logical way and checked whether the observations or interpretations are correct.
• Dealing with similar or regularly reoccurring situations and starting to apply risk management analysis.
As Quantity Surveyor, my duties and responsibilities are:
• Estimating and arranging the Bill of Quantities submitting for bidding.
• Analyzing completed work and arranging payment done by Sub-Contractor.
• Meeting with consultant and discussing the quantities that are already done for the Monthly Certificate Payment.
• Understanding the implications of health and safety regulations.
• Preparing all As-Built Drawing and As-Built Quantities intended for the completion of the project.
• Working to keep the project within the budget.
As Project In Charge (Civil Engineer / Concrete Coordinator / QC) of the eight (8) buildings Five (5) story each and 500 persons Mosque, my duties and responsibilities are:
• Lead and coordinated Civil Engineering activities to ensure the projects are executed in a cost effective and timely manner.
• Work with Mechanical and Electrical Engineers to ensure solutions can be efficiently and cost effectively integrated.
• Provided accurate and timely reports to Project Manager.
• Conducted daily site inspection to ensure the correct work implementation based on the approved plans and specifications in line with the standards constructions guidelines.
• Acted as Technical Adviser regarding proper construction methodology and project rules to maintain continuous quality construction through constant interaction with the sub-contractor/workers.
• Assessed billings/accomplishments reports submitted by subcontractors to validate correctness for payment purposes by conducting actual evaluation.
• Prepared request for inspection and secures approval prior to concreting.
• Coordinated with supplier and ensures timely order and delivery of concrete on site.
• Monitored and implemented compliance to company safety and quality standards.
• Planed and coordinated quality control activities and conducted sessions to explain to workers the importance of the following national/international quality norms/ rules/ regulations.
• Supervised effective implementation of all test and inspection schedule and ensure adherence to all procedures and coordinated with various teams to perform quality audits on process.
• Analyzed all products and nonconformance processes and evaluate all documents to ensure maintenance of optimal quality and prepared monthly reports to evaluate performance.
• Monitored an efficient system and recorded for all project activities and analyzed all processes to ensure all work in according to quality requirements.
As Project In charge of Tanajib Project # 120 (Admin Building # 5300) my job responsibilities are:
As permit receiver;
• Make sure that there is a work permit before the work will start to ensure the continuous flow of the activity.
• Identified and analyzed safety precautions and safety hazards involved in a certain activity.
• Conducted joint site inspection together with the designated representative of each department involved.
• Implemented safety agreements of Job Safety Analysis.
As Site Civil Engineer;
• Managed, supervised and facilitated the manpower, materials and equipment for the project.
• Assured that work is carried out to safety and quality standards.
• Studied detailed construction drawing and reviewed plans and specifications of the contract project.
• Coordinated to the Construction Manager for various plan revisions.
• Prepared request for inspection intended for the subject to be inspected.
• Submitted two weeks look ahead schedule to the Construction Manager for him as reference to the work continuity and progress.
• Studied the comprehensive constructions drawing both for old and new revisions prior for the implementation of work and for the progress of the project.
• Controlled and coordinated all constructions activities as per instruction by the Project Manager.
• Responsible for the overall implementation of the quality procedures to ensure that construction work is carried out as per project specification.
• Responsible for the efficient use of resources to execute the work in accordance with the construction drawings and specification requirements.
• Make request for clarification and submit to the Project Management Team (PMT) in-charge for their approval prior for implementation.
• Make estimates of materials needed for the completion of the project.
• Attended internal weekly coordination meeting prior for the development and monitoring of the project to finish at the exact time as per to work planning and schedule.
As Project Engineer of the project (office, commercial and apartment) my job responsibilities are:
• Managed, supervised the ongoing project for the finishing stage of the NTI building and for SEK 35 commercial building.
• Supervised, managed and facilitated the materials and equipment for the IAN CHOW (8 unit’s apartment) project.
• Performed daily site inspections to follow up on work progress ensuring that work was carried out as per approved drawings, material and work schedule.
• Prepared estimates for variation and remaining expenditures needed to complete the project.
• Studied detailed construction drawings and review plans specification of the project to ensure proper implementation of the standards.
• Implemented proper safety aspects of all workers.
• Attended weekly coordination meeting with the clients.
• Submitted monthly progress report prior for the development of the project
As Project Engineer in charge for land development (7.2 ha) of Recuerdo Memorial Garden located at Madja-as St., Payatas Dos Quezon City. My job responsibilities are:
• Supervised and managed the project.
• Prepared initial requirement prior to mobilization such as list of materials, equipment and manpower.
• Prepared project estimates and other office documentation.
• Evaluated quotations and assessed progress billing invoices for sub-contractors.
• Monitored and studied cost implications for the project.
• Reviewed construction drawings and plans specification of the project to ensure efficient and high standard implementation
• Implemented proper safety aspects of workers.
• Attended weekly coordination meeting with the client
As Site Engineer of RMV Constructions (sub-contractor of FFC) who was given some scope of works such as perimeter fence, stone cladding, and masonry works, my task are:
• Performed the same function of the site engineer of the project.
• Studied work schedule of the contract project.
• Anticipated and coordinated the materials and equipment needed for the project.
• Implemented proper safety aspects of all workers.
• Submitted comprehensive progress report prior for the development of the project.
• Attended weekly coordination meeting