Photo

Noel Guera Carrillo Architectural Site Inspection Engineer

Philippines

CURRICULUM VITAE

NOEL GUERA CARRILLO

Address   :    B-20, L-13, Boutigliery St., PTC NIA Road, Carsadang Bago 1, Imus, Cavite, Philippines

Mobile     :    +63926  943 7076 / +63977 192 2876

E-mail     :  [email protected] / [email protected]

 

Position Applied:  Architectural Site Inspection Engineer

Personal Details
Date of Birth                           :               26th June, 1966

Place of Birth                          :               Manila, Philippines

Gender/Nationality      :        Male, Filipino

Civil Status                                       :     Married

Height / Weight                     :              5’4” (164 cm.) / 69 kg.

Languages Spoken        :       Tagalog, English (fluent)

Passport no.                            :               P4197025B, Issued in DFA MANILA

Issued on 12 December 2019, Expires on 11 December 2029.

Career Objective
Commitment hard work and team work to the organization / company that I belong and make me truly a contributor to its growth and success, develop my own skills, utilizing and enhancing the skills developed mainly through hard-work, job experiences and educational attainment.

Achievements/Certificate
–       Certificate of Appreciation Award In recognition of his contribution for achieving “Fifty five (55) Million Man-Hours without Lost Time Injuries” at the Ruwais Housing Complex Expansion Construction of Building Accommodation, Project No 7010C6.  Abu Dhabi National Oil Company ADNOC, January 08, 2015 to January 30, 2018

–       PMC Staff SAFETY AWARENESS TRAINING 2013 to January 30, 2018, RHD Extension Phase III , Package-12 , Project No. 6042, RHD Extension Phase IV , Package- 4 , Project No. 7010C6, Risk Assessment, PTW System, Excavation Safety, Lifting Operation, Fall Protection, Confined Space, Logistics & Road Safety, Environmental Safety, Top 16 Hazards in Constructions,  Heat, Stress ADNOC Requirements and other more …

–       Health and Safety Risk Management HSE (UK) Guidelines, 3DFold Education Centre, INDG 163@Abu Dhabi, UAE,2013

–       Aspired Safety Training Institute Working at Heights, Safe Erection, and SCBA Awareness Training  Basic Scaffolding Training, Dubai, UAE June 2014

–       AUTOCAD Certificate of Completed, Meralco Foundation Institute Meralco, Ortigas Ave., Pasig city, Philippines, March 2004.

–       Managing Construction Projects , The processes and techniques of project management for construction, The techniques and requirement specific for construction management, including mitigating construction claims, The strategies and methodologies of merging technology with your construction project.

 

Professional Experience
1. Dorsch Holding GmbH, Abu Dhabi, UAE

ARCHITECTURAL SITE INSPECTION ENGINEER (ASIE), 27 August 2013 – 30 Jan 2018

Project: – ADNOC Construction of P12/ 8-Buildings, G+11, Ruwais Housing, Abu Dhabi, UAE , Jan 2012 – Dec2014 – ADNOC Construction of P4/40-Buildings G+5, Ruwais Housing, Abu Dhabi, UAE, Jan 2015 – Jan 2018

* 10-Buildings / Cast in Situ Bldg / G+5, Ruwais Housing, Abu Dhabi, UAE, January 2015 – January 2018

* 30-Buildings / Pre Cast Bldg /  G+5, Ruwais Housing, Abu Dhabi, UAE, January 2015 – January 2018

 

 

 

Duties and Responsibilities:

·          Review and Checks all Architectural Shop drawings, Specifications, Method of Statements, MAR and to ensure its compliance with Design Requirements, Contract Requirements and properly Coordinating with other Disciplines.

·         Carry out all Site inspection (ITR) as per intervention points marked in the relevant ITP, latest approved Shop drawing, MAR and Method Statements.

·         Review and Approved Materials Verification Request (MVR) ensuring compliance with the Adnoc-Contract requirements, MAR, MSDS and pre-approved samples.

·          Closely monitor site activities to ensure quality of work in compliance with the Adnoc-Contract requirements,

·         Quality Checked, Witnessed and Verify with Independent Testing Laboratory (ITL) that all relevant test results related to specific ITR meets the Contract requirements good construction practice, compliance with shop drawings, and reporting to immediate supervisor.

·         Examine Architectural Drawings in relation to other Design Discipline (MEP and Structural).

·         Advise PMC Quality & HSE Engineers as well as CM and CS & Issue NCRs / SORs for incorrect practices.

·         Attends Technical meeting with Contractors & weekly progress meeting if required by Const. Manager.

·         Witness all kinds of Testing as prescribed by Adnoc-Contract requirements. (DFT, Cube Crushing, Concrete slump test, temp. moisture test , DFT Dry Film Thickness. ).

·         Closely monitor the Project site activities in respect of Quality, Safety and Progress and coordinating to Construction Supervisor of findings, area of concerns and corrective action.

·         Quality Checks and monitor that any non-conformity has been reported through a non-conformance report (NCR). All NCRs shall be coordinated with the PMT Senior Quality Assurance Engineer.

·         Safety, Checks concern prior to commencement of work in order to ensure that materials and equipment are in safe working order in accordance with project and site regulation.

·         Controlling the QA/QC of Contractor to ensure all materials are approved as per MAR / MVR and approved Shop Drawing and all the quality of work are followed the Method of Statements.

·         Quality Check the works of contractor and ensure that works are good quality / smooth execution of works / properly compliance as per approved Shop Drawing and Method of Statements.

·         Coordinating to Construction Supervisor (CS) for any issues related for the project quality of works, safety, progress and cost objectives are properly controlled as per Client Requirements.

·          Coordinating to Construction Supervisor for any deviation the quality of works, delay the works, delay the materials and lock of manpower are all reported & informed to the contractor to take a corrective action as soon as possible.

·          Reviewing / Monitor the weekly and monthly works progress reports as presented by Contractors based on the Action Plan.

·         Review the relevant As-Built drawings as submitted by Contractor and make sure that all site conditions are properly addressed.

2. TRIMO UAE  fze Trimo Standard Container Modular (Portable Cabin) FUJAIRAH,FREE ZONE II, UAE

Quality Control Manager, January 2012 – July 2013

Project Location:  TRIMO UAE fze Trimo Standard Container

–  Como Oman “GCC Project in Oman                              148 Units

–  Fujairah Free Zone II, UAE “Italian Kitchen “                          9 Units

–   Petrofac EPS Proj, Shell-Iraq at Majnoon,                            51 Units

–   DIB Project “Edinburgh International “                              36 Units

–   Cosmezz Project “in the Djiobuti                                   58 Units

–   Sixco (SAMSUNG) Abu Dhabi, UAE                                  84 Units

–   MEDCO “GCC Project in Qatar                                    1037 Units

–   HLG Project in Iraq                                               474 Units

–   Trimo Investment ICS Project                                       96 Units

 

Duties and Responsibilities :

·        Quality Management the document concern in all phases in Quality Process Plan,

1. Quality Assurance w/Supplier (TAC)      3. Quality Control of the Materials (Quality Checklist) Frames

2. Quality Control in Production Line        4.Quality Checklist for Packing, Bundling and Final Product.

•      Monitoring the Quality Control of incoming Ceiling & Flooring Frames and all the raw materials.

•      Quality Checking and Reporting for Sandblasting, Primer & Final Coat Paint Thickness Test of Frames.

•      Quality Check the Sandblasting, Primer/Final Coat Paint DFT Test of Ceiling & Flooring Frames.

•      Quality Assurance with supplier the TAC- Technical Acceptance Condition of all Materials

•      Quality Control in Production Line, Packing, Bundling & Final product and Loading

•      Quality Control/ Assurance of Packing, Bundling, Assembling & Loading.

•      Quality check all Incoming Materials and Outgoing/Loading Quality Packing Checklist

•      Quality Check the execution in Table Line (Ceiling & Flooring Frames Assembly)

•      Quality Check the Panel Cutting, Fixing of Door & Window in Panel and Flashing in bending machine.

•      Quality Checked the Final Finishes Assembly of Assembling and Erection of container

•      Monitor safety program and assure safety in all construction activities.

 

3. United Engineering Construction LLC (UNEC), Abu Dhabi, UAE

QA/QC Engineer, February 2011 – December 2011

Projects:  – UAE Armed Force Command of Military Works, Construction of Signal Corps. Camp at Zayed Military, City-Phase2, Sweihan, Abu Dhabi UAE.

 

Duties and Responsibilities :

·         Responsible of all site inspection (ITR) as per intervention points marked in the relevant ITP, SD and Method of Statements, and make the inspection request to inspect with the consultant.

·         Quality checked all incoming delivery of materials on site MVR inspection as per approved MAR and Shod drawing Quality of materials are high acceptable.

·         Quality checked the works of sub-contractor(s) ensuring are complying with the standards and specifications of the contract documents through observation, measurements, and testing as well as tracking quality assurance progress.

·         Responsible and supervise taking out the sample materials of Road Works and prepared sending all road materials for Lab. Test and Test Result Report.

·         Responsible for daily/weekly/Monthly Reports, all Laboratory Test Result Reports and others.

·         Responsible for all casting cubes filling record of 7/28 days sending for Lab. Test

·         Monitor safety program and assure safety in all construction activities.

·         Coordinating to the Consultants, Sub-Contractor and MEP Coordinators Management, Site Management

·         Responsible to make the inspection request or materials submittal and to inspect with the consultant.

·         Prepared the pouring request to the MEP/Sub-Contractor give clearance / Certificate proceed to work.

·         Responsible for all sending Concrete & Steel materials for Laboratory Test Report

–  Casting Cube-Compressive Strength

–  Steel Test-Tensile Strength

•   Responsible for all sending Road Materials for Laboratory Test Report

–   Compaction test for Formation Layer (soil test result-proctor)

–   Compaction Test for Sub-Grade and Sub-Base Layer, Approval Test sample material for road materials

–   Prime Coat MC / Base Course (Asphalt layer)

–   Fresh Base Course Sample on date application/Coring Test of Base Course (min. 6 points)

–   Tack Coat (RC2)/Wearing Course (Asphalt layer) and Fresh Wearing Course Sample on date application.

–   Coring Test of Wearing Course (min. 6 points) / sample materials for Road Marking and Road Marking Works.

 

4. Al HADI Contracting Co. LLC PO Box 4479 – Abu Dhabi, UAE

SITE ARCHITECT, 15 May 2008 – December 2010

Projects :   – Hyper Lulu Supermarket, Baniyas Sabiya, Abu Dhabi , UAE

– DMW Directorate of Military Villa’s Maintenance Works, Officer City, Abu Dhabi, UAE

– Residential and Commercial Tower Bldg for Mr. Obaid Saleh Al Noaimyat Airport Road , Abu Dhabi

– Commercial Building for Mr. Ahmed Moham Al Muhairy & Sector E-10, Plot No. 13. Abu Dhabi

– 6 Villas for Mr. Moh’d Ali Al Nuaimi in Shaikh Moh’d Bin Zayed City Mussafah, Abu Dhabi UAE

– 4 Villas for Mr Salman Qahtan Obaid Al Shamsi, Moh’d Bin Zayed City Mussafah, Abu Dhabi UAE

– Dharan Palace Hotel, Dharan, Dammam, Al Kobar KSA

– Mubarak Villa , Housing Dammam KSA

 

 

 

Duties and Responsibilities :

•  Coordinate with Client, Services Consultants and Sub-Contractors for smooth execution of work, arranging   materials, manpower and planning of site activities.

•   Daily monitoring on site for ensuring quality of works are compliance with shop drawing, specification and contract  requirements of all activities on site.

•  Coordinating to the Consultants, Sub-Contractor and MEP Coordinators Management, Site Management

for the resolving and issues on site concerns, any deviation and discrepancy on shop drawing, specification and method of statement.

·       Coordinates with other discipline to accommodate MEP, Civil /Structural and other Architectural work in accordance to the  Architectural Design Requirements.

·       Accompany the Contractor and Consultant QA/QC Engineer to site during actual work inspection.

•   Technical evaluation and preparation of all required documents to submit such as Project Quality Plan, Inspection and Test Plan, Material and Method Statement Submittal in accordance with the project specification prior to commencement of work.

•  Coordinate regularly to the purchasing department the progress of delivery of materials to ensure timely delivery of materials.

•  Ensure that all materials supplied to site are approved materials, delivered in good condition, and properly stored.

•    Monitor Health and Safety of the construction works and report on violations.

·         Monitor safety program and assure safety in all construction activities as per site regulation.

·          Responsible for daily/weekly/Monthly/ Progress Report and all Laboratory Test Result Reports and others.

·          Responsible for the quality standards works as per designed requirement and specification that apply to block works,  plaster, tiles laying, painting works, marble fixing, water proofing, protection board and all finishing works.

 

5. St. Scholastica’s College Manila , Malate, Manila, Philippines

Quality Control Engineer /Technical Maintenance General Services Engineer Depart – February 1991 – March 2008

Project :  Maintenance General Services Engineer Department

Duties and Responsibilities :

·         Approval and Acceptance of Handling over of Contractors works as per Contract Requirements

–   Review and Check all the relevant Updated As-Built Plan Shop drawing as submitted the

by Contractor to ensure that all site conditions are properly addressed.

–   Quality Checked the Materials ensuring compliance with the specification and Contract requirements.

–   Review project contract documents and monitor construction activities to ensure compliance as per project contract requirements.

·         Quality Checked the works of Contractors and Maintenance Works as per Client & Contract requirements

– Carpenter, Painting, Masonry, and Tiling Works

–     Waterproofing & Leakage / G.I. Roofing and  Glass / Aluminum works and Steel Works

•              AUTO CAD – Civil & Architectural Updating All As-Built Plan Shop Drawings as per Municipality Requirement

–     As-Built Plans of Electrical & Mechanical Shop Drawing all Building

–     Electrical / Mechanical As Build Plan Shop Drawing of all Buildings.

–     Floor Plan (locator of Fire Exit, Fire Extinguisher, Sign Arrow of Exit) As Build Plan Shop Drawings

–     Renovation / Improvement of Offices / Classrooms / Staff Rooms /Comfort Rooms As Build Plan.

·         Ware House Management

–     In-charge for Warehouse Management

–     Monitoring Supplies Materials / tools and equipment incoming /outgoing

·     May 1990 – January 1991 –  Engineering Department, C.C. PUNO Construction Inc., Manila, Philippine

Academic Qualifications
College     :    Bachelor of Science in Architecture Major in Design  April 1986-1991

Technological Institute of the Philippines, Quiapo, Manila, Philippines

College      :   Drafting Technology Technological Institute of the Philippines, Quiapo, Manila, March 1985-1986

Secondary               :  F.G. Calderon Intergrated School, Tondo, Manila, March 1981-1984

Primary   :  F.G.CalderonIntergratedSchool,Tondo, Manila , March 1974-1980

References
·         Mohammad Al Fayyad Yousef, Construction Supervisor Civil Engineer, Adnoc – +97155 921 3414

·         Ahmad Al Asaad, Construction Supervisor, Architect, Adnoc – +97150 804 1842

·         Mr. Saudino N. Lacsamana ,Lead Instructor, Maintenance at Borouge – +97156 793 7762

·         Mr Clennie Eriman , Senior Architectural Site Inspection Engineer, Hill Interln. , +971501379776

 

I hereby certify that the information stated above are true and correct to the best of my knowledge and belief.

 

 

Noel Guera Carrillo

1+1=3 pppgiw

Education

06/06/1986 to 04/21/1991 Major in Designed at Technological Institute of the Philippines

I would like to apply as an Architectural Site Inspection Engineer. Please consider this letter as my formal application.

I am very interested in working for a highly esteemed company. Where I can use my skills, my knowledge and share my own perspective and point of view. I feel certain that I can meet your standards in efficient, creative and high quality work.

Working for your company appeals to me because it has a good reputation. Your organization produces a high-quality service, and I can contribute to this with my leadership skills and my ability to work under pressure.

I have gained vast experience from my previous job, which will help me be competent enough in fulfilling my future responsibilities with you.

I am a goal-oriented, highly self-motivated, competent and professionally committed with my good human relations skills.

Experience

08/27/2013 - 02/30/2018 ARCHITECTURAL SITE INSPECTION ENGINEER at . Dorsch Holding GmbH, Abu Dhabi, UAE

Project: – ADNOC Construction of P12/ 8-Buildings, G+11, Ruwais Housing, Abu Dhabi, UAE , Jan 2012 – Dec2014 – ADNOC Construction of P4/40-Buildings G+5, Ruwais Housing, Abu Dhabi, UAE, Jan 2015 – Jan 2018
* 10-Buildings / Cast in Situ Bldg / G+5, Ruwais Housing, Abu Dhabi, UAE, January 2015 – January 2018
* 30-Buildings / Pre Cast Bldg / G+5, Ruwais Housing, Abu Dhabi, UAE, January 2015 – January 2018

Duties and Responsibilities:
• Review and Checks all Architectural Shop drawings, Specifications, Method of Statements, MAR and to ensure its compliance with Design Requirements, Contract Requirements and properly Coordinating with other Disciplines.
• Carry out all Site inspection (ITR) as per intervention points marked in the relevant ITP, latest approved Shop drawing, MAR and Method Statements.
• Review and Approved Materials Verification Request (MVR) ensuring compliance with the Adnoc-Contract requirements, MAR, MSDS and pre-approved samples.
• Closely monitor site activities to ensure quality of work in compliance with the Adnoc-Contract requirements,
• Quality Checked, Witnessed and Verify with Independent Testing Laboratory (ITL) that all relevant test results related to specific ITR meets the Contract requirements good construction practice, compliance with shop drawings, and reporting to immediate supervisor.
• Examine Architectural Drawings in relation to other Design Discipline (MEP and Structural).
• Advise PMC Quality & HSE Engineers as well as CM and CS & Issue NCRs / SORs for incorrect practices.
• Attends Technical meeting with Contractors & weekly progress meeting if required by Const. Manager.
• Witness all kinds of Testing as prescribed by Adnoc-Contract requirements. (DFT, Cube Crushing, Concrete slump test, temp. moisture test , DFT Dry Film Thickness. ).
• Closely monitor the Project site activities in respect of Quality, Safety and Progress and coordinating to Construction Supervisor of findings, area of concerns and corrective action.
• Quality Checks and monitor that any non-conformity has been reported through a non-conformance report (NCR). All NCRs shall be coordinated with the PMT Senior Quality Assurance Engineer.
• Safety, Checks concern prior to commencement of work in order to ensure that materials and equipment are in safe working order in accordance with project and site regulation.
• Controlling the QA/QC of Contractor to ensure all materials are approved as per MAR / MVR and approved Shop Drawing and all the quality of work are followed the Method of Statements.
• Quality Check the works of contractor and ensure that works are good quality / smooth execution of works / properly compliance as per approved Shop Drawing and Method of Statements.
• Coordinating to Construction Supervisor (CS) for any issues related for the project quality of works, safety, progress and cost objectives are properly controlled as per Client Requirements.
• Coordinating to Construction Supervisor for any deviation the quality of works, delay the works, delay the materials and lock of manpower are all reported & informed to the contractor to take a corrective action as soon as possible.
• Reviewing / Monitor the weekly and monthly works progress reports as presented by Contractors based on the Action Plan.
• Review the relevant As-Built drawings as submitted by Contractor and make sure that all site conditions are properly addressed.

01/02/2012 - 07/30/2013 Quality Control Manager at TRIMO UAE fze Trimo Standard Container Modular (Portable Cabin) FUJAIRAH,FREE ZONE II, UAE

Project Location: TRIMO UAE fze Trimo Standard Container
– Como Oman “GCC Project in Oman 148 Units
– Fujairah Free Zone II, UAE “Italian Kitchen “ 9 Units
– Petrofac EPS Proj, Shell-Iraq at Majnoon, 51 Units
– DIB Project “Edinburgh International “ 36 Units
– Cosmezz Project “in the Djiobuti 58 Units
– Sixco (SAMSUNG) Abu Dhabi, UAE 84 Units
– MEDCO “GCC Project in Qatar 1037 Units
– HLG Project in Iraq 474 Units
– Trimo Investment ICS Project 96 Units

Duties and Responsibilities :
• Quality Management the document concern in all phases in Quality Process Plan,
1. Quality Assurance w/Supplier (TAC) 3. Quality Control of the Materials (Quality Checklist) Frames
2. Quality Control in Production Line 4.Quality Checklist for Packing, Bundling and Final Product.
• Monitoring the Quality Control of incoming Ceiling & Flooring Frames and all the raw materials.
• Quality Checking and Reporting for Sandblasting, Primer & Final Coat Paint Thickness Test of Frames.
• Quality Check the Sandblasting, Primer/Final Coat Paint DFT Test of Ceiling & Flooring Frames.
• Quality Assurance with supplier the TAC- Technical Acceptance Condition of all Materials
• Quality Control in Production Line, Packing, Bundling & Final product and Loading
• Quality Control/ Assurance of Packing, Bundling, Assembling & Loading.
• Quality check all Incoming Materials and Outgoing/Loading Quality Packing Checklist
• Quality Check the execution in Table Line (Ceiling & Flooring Frames Assembly)
• Quality Check the Panel Cutting, Fixing of Door & Window in Panel and Flashing in bending machine.
• Quality Checked the Final Finishes Assembly of Assembling and Erection of container
• Monitor safety program and assure safety in all construction activities.

02/15/2011 - 12/30/2011 QA/QC Engineer at United Engineering Construction LLC (UNEC), Abu Dhabi, UAE

Projects: – UAE Armed Force Command of Military Works, Construction of Signal Corps. Camp at Zayed Military, City-Phase2, Sweihan, Abu Dhabi UAE.

Duties and Responsibilities :
• Responsible of all site inspection (ITR) as per intervention points marked in the relevant ITP, SD and Method of Statements, and make the inspection request to inspect with the consultant.
• Quality checked all incoming delivery of materials on site MVR inspection as per approved MAR and Shod drawing Quality of materials are high acceptable.
• Quality checked the works of sub-contractor(s) ensuring are complying with the standards and specifications of the contract documents through observation, measurements, and testing as well as tracking quality assurance progress.
• Responsible and supervise taking out the sample materials of Road Works and prepared sending all road materials for Lab. Test and Test Result Report.
• Responsible for daily/weekly/Monthly Reports, all Laboratory Test Result Reports and others.
• Responsible for all casting cubes filling record of 7/28 days sending for Lab. Test
• Monitor safety program and assure safety in all construction activities.
• Coordinating to the Consultants, Sub-Contractor and MEP Coordinators Management, Site Management
• Responsible to make the inspection request or materials submittal and to inspect with the consultant.
• Prepared the pouring request to the MEP/Sub-Contractor give clearance / Certificate proceed to work.
• Responsible for all sending Concrete & Steel materials for Laboratory Test Report
– Casting Cube-Compressive Strength
– Steel Test-Tensile Strength
• Responsible for all sending Road Materials for Laboratory Test Report
– Compaction test for Formation Layer (soil test result-proctor)
– Compaction Test for Sub-Grade and Sub-Base Layer, Approval Test sample material for road materials
– Prime Coat MC / Base Course (Asphalt layer)
– Fresh Base Course Sample on date application/Coring Test of Base Course (min. 6 points)
– Tack Coat (RC2)/Wearing Course (Asphalt layer) and Fresh Wearing Course Sample on date application.
– Coring Test of Wearing Course (min. 6 points) / sample materials for Road Marking and Road Marking Works.

05/20/2008 - 12/30/2010 1. SITE ARCHITECT at Al HADI Contracting Co. LLC PO Box 4479 – Abu Dhabi, UAE

Projects : – Hyper Lulu Supermarket, Baniyas Sabiya, Abu Dhabi , UAE
– DMW Directorate of Military Villa’s Maintenance Works, Officer City, Abu Dhabi, UAE
– Residential and Commercial Tower Bldg for Mr. Obaid Saleh Al Noaimyat Airport Road , Abu Dhabi
– Commercial Building for Mr. Ahmed Moham Al Muhairy & Sector E-10, Plot No. 13. Abu Dhabi
– 6 Villas for Mr. Moh’d Ali Al Nuaimi in Shaikh Moh’d Bin Zayed City Mussafah, Abu Dhabi UAE
– 4 Villas for Mr Salman Qahtan Obaid Al Shamsi, Moh’d Bin Zayed City Mussafah, Abu Dhabi UAE
– Dharan Palace Hotel, Dharan, Dammam, Al Kobar KSA
– Mubarak Villa , Housing Dammam KSA

Duties and Responsibilities :
• Coordinate with Client, Services Consultants and Sub-Contractors for smooth execution of work, arranging materials, manpower and planning of site activities.
• Daily monitoring on site for ensuring quality of works are compliance with shop drawing, specification and contract requirements of all activities on site.
• Coordinating to the Consultants, Sub-Contractor and MEP Coordinators Management, Site Management
for the resolving and issues on site concerns, any deviation and discrepancy on shop drawing, specification and method of statement.
• Coordinates with other discipline to accommodate MEP, Civil /Structural and other Architectural work in accordance to the Architectural Design Requirements.
• Accompany the Contractor and Consultant QA/QC Engineer to site during actual work inspection.
• Technical evaluation and preparation of all required documents to submit such as Project Quality Plan, Inspection and Test Plan, Material and Method Statement Submittal in accordance with the project specification prior to commencement of work.
• Coordinate regularly to the purchasing department the progress of delivery of materials to ensure timely delivery of materials.
• Ensure that all materials supplied to site are approved materials, delivered in good condition, and properly stored.
• Monitor Health and Safety of the construction works and report on violations.
• Monitor safety program and assure safety in all construction activities as per site regulation.
• Responsible for daily/weekly/Monthly/ Progress Report and all Laboratory Test Result Reports and others.
• Responsible for the quality standards works as per designed requirement and specification that apply to block works, plaster, tiles laying, painting works, marble fixing, water proofing, protection board and all finishing works.

02/10/1991 - 03/15/2008 Quality Control Engineer /Technical Maintenance General Services Engineer Depart – February 1991 - March 2008 at St. Scholastica’s College Manila , Malate, Manila, Philippines

Project : Maintenance General Services Engineer Department
Duties and Responsibilities :
• Approval and Acceptance of Handling over of Contractors works as per Contract Requirements
– Review and Check all the relevant Updated As-Built Plan Shop drawing as submitted the
by Contractor to ensure that all site conditions are properly addressed.
– Quality Checked the Materials ensuring compliance with the specification and Contract requirements.
– Review project contract documents and monitor construction activities to ensure compliance as per project contract requirements.
• Quality Checked the works of Contractors and Maintenance Works as per Client & Contract requirements
– Carpenter, Painting, Masonry, and Tiling Works
– Waterproofing & Leakage / G.I. Roofing and Glass / Aluminum works and Steel Works
• AUTO CAD – Civil & Architectural Updating All As-Built Plan Shop Drawings as per Municipality Requirement
– As-Built Plans of Electrical & Mechanical Shop Drawing all Building
– Electrical / Mechanical As Build Plan Shop Drawing of all Buildings.
– Floor Plan (locator of Fire Exit, Fire Extinguisher, Sign Arrow of Exit) As Build Plan Shop Drawings
– Renovation / Improvement of Offices / Classrooms / Staff Rooms /Comfort Rooms As Build Plan.
• Ware House Management
– In-charge for Warehouse Management
– Monitoring Supplies Materials / tools and equipment incoming /outgoing
• May 1990 – January 1991 – Engineering Department, C.C. PUNO Construction Inc., Manila, Philippine