PABIE V. DADOR JR.
E-mail: [email protected]
+639953697034)
Objective:
A progressive and innovative exciting work in the field of piping construction, piping structural, pressure test commissioning, materials planning and NDT activities. I have an excellent communication, technical and interpersonal skills with ability to interact with individuals at all levels. Skill at building a strong team in environments and handling large scale projects, where I can utilize my working experience, with technical skills and potentials to give the best performance for the organization.
Qualification:
· Material/Planning Coordinator
· QA/QC Piping Inspector
· Maintenance Static supervisor
Computer Skills:
· Application: SAP system & Microsoft Office
Technical Skills:
· Proficient in: Isometric drawings, Plant Layouts, P&ID, Materials, and
Pressure Test Packages
Familiar with:
International codes : ASME(, B31.3, ASME IX, ASTM,AWS,D1.1 & API Standards
Experience Details
1. Company : Eram Engineering (Establishment)
Period : Sept. 22, 2014 to June 2018
Location : Al Khobar Kingdom of Saudi Arabia
Assignments
· Saudi Polymers Company
Client : Chevron Philips
Location : JUBAIL SAUDI ARABIA
Period : April 10, 2016 to June 2018
Designation: Turnaround Material/Planning Coordinator
Detail of work performed
· Coordinates and expedites flow of materials, parts, and assemblies between sections or departments, according to production and shipping schedules or department priorities, and compiles and maintains manual or computerized records: Reviews production schedules and related information and confers with department supervisors to determine material requirements to identify overdue materials and to track material.
· Requisitions material and establishes sequential delivery dates to departments, according to job order priorities and material availability
· Examines material delivered to production departments to verify conformance to specifications.
· Arranges in-plant transfer of materials to meet production schedules.
· Computes amount of material required to complete job orders, applying knowledge of product and manufacturing processes.
· Compiles and maintains manual or computerized records, such as material inventory, in-process production reports, and status and location of materials.
· May move or transport materials from one department to another, manually or using material handling equipment.
· May monitor and control movement of material and parts on automated conveyor system.
· Ibn Zahr Petro chemical Power Plant
Client : SABIC
Location : JUBAIL SAUDI ARABIA
Period : Oct. 22, 2014 to July 2015
Designation : Maintenance Static Supervisor
Detail of work performed
· Provide static maintenance support to the field operations to manage asset operation to ensure the set production target are met and safeguard technical integrity
· Support static equipment inspection programmed, plans and requirements to reduce equipment downtime and communicate/coordinate plans with field operation to foster better understanding and execution of the set plan
· Request coastal Discipline Engineer support for specification changes
· Ensure all long term/temporary, On-Plot piping, flowline/pipeline repairs – clamps, section replacement, etc. gets carried out as per set plan
· Ensure all work orders are raised/issued and are executed on time as per set plan
· Provide static maintenance input into the Operations Business Plans/programmed build for area
· Carry out QA/QC on completed CM/PM work
· Provide input to field HSE plans and carry out own HSE activities
· Develop a motivated and competent static maintenance team in area
2. Company : Daeah Philippines
Period : Jan. 2014 to May 2014
Location : LIMAY BATAAN PHILIPPINES
Assignments
· Bataan Refinery Expansion
Client : PETRON
Location : LIMAY BATAAN PHILIPPINES
Designation: Q.C, Inspector (PIPING / WELDING.)
Detail of work performed
· Inspection of incoming materials.
· Inspection of fabricated piping spools for materials, dimension and orientation before welding.
· Fit-up inspection of weld joints at shop and job site.
· Visual inspection of Welded joints.
· Monitoring and witnessing of Positive Material Identification (PMI) test.
· Monitoring of activities like electrode backing, preheating, Inter-pass temperature.
· To communicate welding procedures, preheat, inter-pass temperature and all other necessary documents to welding supervisors and welders & welding operators.
· Responsible for quality control inspection of all piping and support installations and Tie-in.
· Checking of piping materials as per the ISO drawing.
· Visual inspection of pipeline and preparing QC punch list after installation.
· Organizing welders tool box meeting and giving suggestion in order to
Reduce repair rate.
· Ensure that all inspection reports are accurate and that all attached documents are current status
· Ensure all work is correctly prepared prior to any inspection being undertaken
· Assist the site QC manager in the organization, maintenance and control of the quality system
· Liaise with the site construction engineers and provide assistance when requested
· Prepare nonconformance reports to the QA manager and assist in developing corrective actions
· Coordinate with the customers QC inspectors for the resolution of site problems
· Attend the weekly QC meetings
· Review work procedures and method statements for compliance with good work practices and the customers contract specializations
· Compliance with the site’s health and safety regulations
3. Company : Daewoo E & C
Period : Oct. 2012 to Oct. 2013
Location : PAPUA NEW GUINEA
Assignments
· Liquefied Natural Gas
Client : EXXON MOBILE
Location : PAPUA NEW GUINEA
Designation: Q.C Inspector (PIPING / WELDING)
Detail of work performed
· Inspection of incoming materials.
· Inspection of fabricated piping spools for materials, dimension and orientation before welding.
· Fit-up inspection of weld joints at shop and job site.
· Visual inspection of Welded joints.
· Monitoring and witnessing of Positive Material Identification (PMI) test.
· Monitoring of activities like electrode backing, preheating, Inter-pass temperature.
· To communicate welding procedures, preheat, inter-pass temperature and all other necessary documents to welding supervisors and welders & welding operators.
· Responsible for quality control inspection of all piping and support installations and Tie-in.
· Checking of piping materials as per the ISO drawing.
· Visual inspection of pipeline and preparing QC punch list after installation.
· Organizing welders tool box meeting and giving suggestion in order to
Reduce repair rate.
· Ensure that all inspection reports are accurate and that all attached documents are current status
· Ensure all work is correctly prepared prior to any inspection being undertaken
· Assist the site QC manager in the organization, maintenance and control of the quality system
· Liaise with the site construction engineers and provide assistance when requested
· Prepare nonconformance reports to the QA manager and assist in developing corrective actions
· Coordinate with the customers QC inspectors for the resolution of site problems
· Attend the weekly QC meetings
· Review work procedures and method statements for compliance with good work practices and the customers contract specializations
· Compliance with the site’s health and safety regulations
4. Company : GS&E (IWI LMTD.)
Period : June 2011 to June 2012
Location : RUWAIS ABU DHABI UAE
Assignments
· RRE2 Project
Client : TAKREER
Location : RUWAIS ABU DHABI UAE
Designation: Q.C, Inspector (PIPING/WELDING ASST.)
Detail of work performed
· Inspection of incoming materials.
· Inspection of fabricated piping spools for materials, dimension and orientation before welding.
· Fit-up inspection of weld joints at shop and job site.
· Visual inspection of Welded joints.
· Monitoring and witnessing of Positive Material Identification (PMI) test.
· Monitoring of activities like electrode backing, preheating, Inter-pass temperature.
· To communicate welding procedures, preheat, inter-pass temperature and all other necessary documents to welding supervisors and welders & welding operators.
· Responsible for quality control inspection of all piping and support installations and Tie-in.
· Checking of piping materials as per the ISO drawing.
· Visual inspection of pipeline and preparing QC punch list after installation.
· Organizing welders tool box meeting and giving suggestion in order to Reduce repair rate.
· Ensure that all inspection reports are accurate and that all attached documents are current status
· Ensure all work is correctly prepared prior to any inspection being undertaken
· Assist the site QC manager in the organization, maintenance and control of the quality system
· Liaise with the site construction engineers and provide assistance when requested
· Prepare nonconformance reports to the QA manager and assist in developing corrective actions
· Coordinate with the customers QC inspectors for the resolution of site problems
· Attend the weekly QC meetings
· Review work procedures and method statements for compliance with good work practices and the customers contract specializations
· Compliance with the site’s health and safety regulations
SEMINARS AND TRAININGS
· Power Plant Training (Nov. 27-Dec. 05 2008)
Plant operation observation in different power plant in Metro Manila
· Laboratory Workshop at Central Philippine University Iloilo city
Energy Conversion And Transmission Simulation (feb.14-15 2008 )
· On-the-Job Training CAPIZ SUGAR CENTRAL PHILIPPINES(Sugar Manufacturing Plant)Pres. Roxas, Capiz (April 07-May 05, 2008)
Position BOILER OPERATOR
Job Descriptions control the water level and coal level of Boiler that
Produce steam by the used of control buttons
· SUPERVISORY SKILLS WORKSHOP(PNG LNG PROJECT (DEC. 04 to 06, 2012)
Pre Task and Safety Instruction deliberations and handling of manpower
EDUCATIONAL BACKGROUND
Tertiary : Capiz State University
Fuentes Drive, Roxas City
2004-2009
Course : Bachelor of Science in Electrical Engineering
Secondary : Florentina B. Degala National High School
Cabungahan, Maayon, Capiz
2000-2004
Elementary : Cabungahan Elementary School
Cabungahan, Maayon, Capiz
1994-2000
CHARACTER REFERENCES
Engr. Ibarra Bisnar Mr. Brink Chester L.
Instructor Turnaround/Field Construction,
Capiz State University Ops Rep, Commercial Supervisor
(+639102150660) Saudi Chevron Phillips Company
Work: +966133568100;ext=1056
Mobile:+966-553051279
Email: [email protected]
Mr. Timothy Rodgers
Turn Around Logistic/material Supervisor
Saudi Chevron Phillips Company
Office No: +966-3-356-8471
Mobile: +966-36004056
Email: [email protected]
Declaration:
I do hereby declare that all the above mentioned particulars are true and correct to the best of my knowledge and belief. And I shall try to serve you to the best of my ability, in upholding the reputation of your organization.
PABIE V. DADOR JR