Resume
PHILIP S. VILLARBA
4927 interior 5 Mansanas st, sta mesa manila
Landline: 8782691
Mobile number: 09565862744
Email Address: [email protected]
EDUCATIONAL ATTAINMENT:
• Central College of the philippines
Aurora blvd quezon city
Bachelor of science civil engineering
• Eulogio Amang Rodriguez
Pandacan manila
Practical electricity
• MEPF Technological Institute (MIT), INC
Quezon city
Plumbing NC II
Position Desired: PipeFitter
Objective: To be able to acquire my skills and information that enhance my Knowledge to achieve the company goal and vision to work best and obtain the position that offer growth and
challenges that will enable me to continue my Knowledges and skills.
WORK SUMMARY: Experience of more than 5 yrs as a piping foreman 2 yrs in HYUNDAI ENGINNERING AND CO in at ZIRKKU island in ABU DHABI , 1yr at GS /DAEAH ENGINEERING AND CONTRUCTION CO. as a Piping foreman upgraded as a PIPING SUPERVISOR in Ruwais Refinery Expansion # 2Project , Al Ruwais Abu Dhabi, 1year in Daelim and Sazeh joint venture as a PIPING FOREMAN in South Pars Gas Development in Busher Province in IRAN,1year in HYUNDAI HEAVY INDUSTRIES CO.LTD as a PIPING FOREMAN at the Qatar Shell Pearl GTL Project at Ras Laffan Industrial City of Qatar 5 yrs as a PipeFitter including piping leadman in Samsung Engineering in Jubail and Maaden Saudi Arabia,I have work more than 3 yrs and 1year 6months in Samsung Engineering and Contruction under of Formosa Petro Chemical Corporation at Mailiao Yunlin Country of Taiwan working in the field of fabrication ,cmmissioning activities specially preparation and line checking for leak testing ,modification of pipe installation ,monitoring and assisting to vendor for inspection of hub flanges scheduling and planning to perform leak testing also responsible for managing and over seeing activity at work site assigning jobs, ensuring safetyat making sure
WORK HISTORY:
COMPANY: Hyundai Engineering and Contruction Co.Ltd,
POSITION:Piping Foreman
DURATION:February 14,2016- August 19, 2018
LOCATION:Abu Dhabi ,UAE
PROJECT: Satah Al Rasboot(SARB)Plant Facilities(Package 4)
I can handle crane using for erection of randon pipe and big bore pipe and big spool
Also I handle boom truck for hauling of pipe and materials, air compressor using for leak test activity.
CONTACT PERSON:JAE HO YOO(Manpower Manager)
Contact no( 9712) 448-0390
JOB DESCRIPTION: 1 Assign as a piping foreman at site for installation of random pipe and pipe spool at the pipe rack also assign as a leak testing foreman I have work for preparation and conduct leak testing , personaly line checking to determine presence of obstruction and to avoid interfering with other activities
2. Responsiblefor preparing ,maintaining and installation of piping project.
3.Working at the peg launcher area for assisting to vendor for inspection of hub flanges
4.assign as a leak testing activities
a) Line checking as per Pand ID Drawing (Piping and instrument Diagram)
b)Conduct Leak Testing Activities
c) prepare Air compressor Air hose and Air manifold using for leak testing activities
COMPANY: GS/DAEAH ENGINEERING AND CONSTRUCTION . CO,
POSITION:Piping Foreman / upgraded as a Piping Supervisor
DURATION: September 10, 2013- February 28,2014
PROJECT: (TAKREER) Ruwais Refinery Expansion -2(RRE-2) Project
Assign equipment crane, forklift, boom truck, using for erection of pipe spool , using for hauling of pipe, using of transfer ofn materials in site.
JOB DESCRIPTION: Assign as a working Foreman upgraded as aworking supervisor including Safety work area
JOB EXPERIENCE: a) Superviced for erection of pipe at the pipe rack as per arrangement drawing
b) Modification pipe line as per site condition to avoid destraction to other line
c) Line checking as per Pand ID drawing (Piping and instrument diagram)
COMPANY: DAELIM AND SAZEH JOINT VENTURE
POSITION :Piping Foreman
DURATION: April 7,2012 –April 6, 2013
LOCATION: Tombak Ghadim , Busher Province, Iran
PROJECT: South Pars Gas Development Phase 12 EPC 2Project
Heavy equipment and tools using Crane for erection of pipe ,fork lift for transfer of materials , tools using grinder big and small for cutting the beveling pipe measuring tape to measure the cutting pipe using to assembles of spool pipe , steel square using for squareness level bar for level ness
CONTACT PERSON: LEE BONG DAE (Administration Manager) 98772722-1002-5
JOB DESCRIPTION: working as a Piping Foreman also responsible for preparing of materials drawing tools that needed ,responsible safety inour work place
JOB EXPERIENCE: assign as a working foreman assembles , lay outs ,install and maintain pipe system
a)inspect work site to determine of obstruction and to ascertain that holes cause of structural weakness
COMPANY: HYUNDAI HEAVY INDUSTRIES.LTD,
POSITION: CommissioningForeman
DURATION: June 18,2010 –February 1,2011
LOCATION: Ras Laffan Industrial City , QATAR
PROJECT: Qatar Shell Pearl GTL Project
All kind of size of combination wrench and pipe wrench using for tightening of bolt for flanges
CONTACT PERSON: Gyeong Lae Lee (site maneger) Email: j130lgl@hhi .co.kr
JOB DESCRIPTION:Assign as a commissioning foremanresponsible for managing and over seeing activity at work site ,assigning job ,ensuring safety and making sure
JOB EXPERIENCE: a) Line checking as per p and id verifying quality of facility construction
b)Preparation of all equipment and tool needs in site compressor ,manifold,with inspection certificate
c) Scheduling and Planning Additional personel to Perform testing
COMPANY: SAMSUNG / MMG JOINT VENTURE
POSITION: PIPEFITTER
DURATION: June 8,2007 –Sept 14, 2008 / Sept 2008 –June 2009
Location : JUBAIL /MAADEN SAUDI ARABIA
PROJECT:Tasnee Ethylene /Maaden Amonia Phospate Project
Equipment and Tools can I use grinder ,using for cutting grinding beveling of pipe ,hand tools measuring tape ,steel square hammer using for fabricate of spool pipes
CONTACT PERSON: JH SHIN (ADMIN MANEGER) +966-3-340-1222
JOB DESCRIPTION:Assign as a Pipefitter Upgraded as a piping leadman responsible to lead a skilled worker ,arrange all tools, materials ,including Isometric drawing
JOB EXPERIENCE: a)preparation for assembles, cutting ,grinding ,beveling of pipe using for fit up of pipe spools
b)fabricate of spool pipes and pipe support
COMPANY:SAMSUNG ENGINEERING AND CONSTRUCTION .CO.LTD,
POSITION:Pipefitter
DURATION: June 7, 2005 –December 17, 2006
LOCATION: Mailiao Village,Yunlin Country ,TAIWAN ROC
PROJECT:Formosa Petrochemical Corporation( REF-4/PIPING(GHU#2)Project
Equipment and tools use crane for erection of pipe , big grinder small grinder, pencil grinderusing for grinding and cutting and beveling of pipe spool ang angle bar using for pipe support
CONTACT PERSON: MR .JAMES H.W.BAE(Labor Manager) (02)27288550
JOB DESCRIPTION: As a pipefitter assign in under ground installation piping ,work safely to avoid incident happen
JOB EXPERIENCE: a)Layout, assembles ,installs and maintain pipe system pipe support
b) cuts pipe using grinder or using cutting machine or using for beveling
c) Bending pipes , use pipe bending machine or bending tools
d) Assembles and installs variety of metal and metal pipes ,tubes ,and fittings Including iron ,steel ,copper ,and plastic pipes