Photo

Roy Silos Ledesma Jr Mechanical Engineer

2nd Industrial City, Riyadh, Kingdom of Saudi Arabia
DrivingMicrosoft OfficeWelding

Production Maintenance Supervisor
Maintenance Department
Riyadh Cable Group Companies
2nd industrial City, Al Kharj Road, Street No.: 175,
3rd Lane Zone D. Riyadh, Kingdom of Saudi Arabia
February 23, 2019– Present

Planning and undertaking scheduled maintenance;
Responding to breakdowns, diagnosing faults, repairing equipment;
Supervising engineering and technical staff;
Obtaining specialist components, fixtures or fittings;
Managing budgets and statistical records
Ensuring compliance with health and safety legislation
Creating maintenance procedures
Managing stocks of supplies and equipment.

Science Research Analyst
Furniture Testing Laboratory Division
Department of Science and Technology VII
S&T Complex, Sudlon, Lahug, Cebu City
October 9, 2017– December 28, 2018

Job Description:
Receive samples/documents from customers and release reports/documents to customers;
Conduct furniture testing and make test reports;
Assist in the Calibaration Laboratory Testing;
Assist in the preparation of monthly, quarterly, annual and other technical reports;
Assist in quality assurance activities/preparations of documents needed for sustaining ISO/IEC 17025 for Laboratory accreditation;
Assist in the implementation of Quality Management System in accordance with ISO/IEC 17025;
Assist in the performance of computer back-up strategy.

Permit-to-Work Engineer
Commissioning Department
Galing Power and Energy Construction
Bato, Toledo City, Cebu
June 20, 2017 – September 30, 2017

Job Description:
Comply with all Occupational Health and Safety Environmental policies and procedures, in order to be a role model for development program participants;
Provide the highest level of expertise in the direction and support of HSE procedures and policies;
Administrate and coordinate the PTW System during steady operations and shutdowns phases;
Liaise with Area Superintendent/Supervisors to achieve planned work;
Inspect the job site, reviewing the JSA with the Permit Acceptor;
Ensure that conflicting permits are not issued;
Review and approve /reject drafted isolation registration sheets(IRS)];
Conduct field inspections to verify the effectiveness of the permit system;
Ensure that both workplace and equipment are safe for return to service before closing the Permit;
Identify routine tasks that required a Permit and Implement Standard Operating Procedure (SOP) instead;
Facilitate and participate in PTW’s audits; and
Train new staff appointed in similar position.
Technical Field Engineer
Hull Erection Department
Tsuneishi Heavy Industries (Cebu) Inc.
WCIP-SEZ, Buanoy, Balamban, Cebu
November 24, 2014 – June 15, 2017

Job Description:
Plan and control all after launching activities of hull erection and other related works;
Planning and control of hull erection welding and inspection schedules;
Planning and control of the facilities for the hull welding and inspection works;
Quality control on welding, fairing, and finishing works;
Confirmation for inspections of hull erection inspection items;
Indicate repairs of quality non-conformities on inspection items;
Direct the owner representative and the classification societies on inspection items;
Report on comments by the owner representatives or the classification societies; and
Implement and control the 5’s, ISO 9002 QMS, ISO 14001 EMS, Safety Programs, and other management systems being implemented by the company.

Education

June 2009 - April 2014 College Graduate at University of Cebu