SO, RYAN ARRIESGADO
B.S ELECTRONIC & COMMUNICATION ENGINEERING
#152 Pantabangan St. NAPOCOR Village
Tandang Sora, Quezon City
E-mail [email protected]
Tel. 5086758
Cell # 09293889561
CAREER OBJECTIVE
A responsible position that warrant my skill and abilities and will serve a strong foundation for my job and to able to expand my horizon and build a more successful career and fruitful future in much admired company with a progressive management system.
ACADEMIC BACKGROUND
College: Central Colleges of the Philippines
#54 Aurora Blvd., Quezon City
Course: B.S ELECTRONICS & COMMUNICATION ENGINEERING
Secondary: Sauyo High School [S.Y 1994-1998]
2nd Laguna St. NIA Village. Sauyo Novaliches, Quezon City
Elementary: Sauyo Elementary School [S.Y 1988-1994]
Del Nacia IV Village, Sauyo Novaliches, Quezon City
SKILL
1. Computer Literate
2. Lettering
3. Drawing
ORGANIZATIONAL & SEMINARS
ASSOCIATIONAL OF ELECTRONIC ENGINEERING (AECES)
TANGLAW DIWA TRAINING CENTER (DREAM PERSONALITY TRAINING/WORKSHOP (ATENEO DEMANILA UNIVERSITY)
DOCUMENT
Passport No. P1717213B
Date issue. Apr 242019
Date valid: apr23 2019
WORK EXPERIENCE
Company : danieli Construction international
Destination : ABHU DABI UAE [Emirates Iron steel factory]
Position : Rigger
Inclusive Date : July 28 2010- august 10 2011
Job experience : piping erection, structural
Company : Danieli Construction International
Destination : JEDDAH Industrial Beteiligung Service and Construction
Position : Rigger
Inclusive Date : October 19 2011-june 19 2012
Company : Doosan heavy Industries and Construction
Destination : Rabigh Power Plant 2
Position : Rigger
Inclusive Date : October 09 2012-March 15 2015
Experience : Lay down Ducting Installation, piping erection, structural,
Company : DAEAH ENGINEERING AND CONTRUCTION Destination : (SARB) Package 4 Satah AL Razboot
Field Development Project Oil and Gas (OFFSHORE-ZIRKU ISLAND)
Position : Rigger
Inclusive Date : Feb 22 2017- Jun 30 2018
Expeirience : piping erection, structural,
Company : DAEAH ENGINEERING AND CONTRUCTION
Destination : RUWAIS FEFINERY WEST RESTORETION PROJECT, AL RUWAIS ABHUDABI
Inclusive Date : July 2 2018 to Nov 10 2018
Expeirience : Piping erection, Structural
JOB DESCRIPTION
· Responsible for signaling, position of crane, material using for lifting and status of crane.
· Working under supervision of the crane operator and the safety of the working area.
· Performs other duties responsibilities as per direction by immediate supervisor
DAEAH ENGINNERING AND CONSTRUCTION (SARB) package 4 Satah Al rasboot oil and gas refinery Abhudabi UAE this project more on pipe track line as a rigger my job is installation of pipe line and erection using 100 ton mobile crane TADANO with appropriate material like shackle sling belt in different tons according to the weight of material we lifting. In our project we maintain our material like the safety working load (SWL) we make sure that we using a right equipment for our lifting procedure. I also make a proper signal to the crane operator that can easily understand the lifting area
DOOSAN HEAVY INDUSTRIES AND CONSTRUCTUION Rabigh Power Plant 2 SAUDI ARABIA in this project as a rigger in power plant I handle also 100 tons TADANO mobile crane for erection of ducting and pipeline but most of all in duckting that using for chimney and also pipe that support to the line . I also using boom truck for some small material lifting that cannot allow our crane. In every work I make all my material make sure all are no damage like sling shackle with I a proper procedure using in lifting material by inspect the quality of all material that I most use for lifting . Signal is the most important in rigging and lifting plan before start the work. I most fallow our supervision before we start my jo
DUTIES AND RESPONSIBILITIES OF RIGGER
As a rigger, it handles the equipment and supplies that are constantly being supplied by any lifting jobs. Responsible for hitching the load and give hand signal the crane operator who maneuvers the crane during lifting operation.
Oil rig workers, whether at sea or on land, begin at the rank of roustabout and move up from there. Roustabouts clean, inspect and maintain the equipment such as mud pumps, pipes and cranes. Oil riggers on land move up from roustabout to derrick operator to service unit operator to driller.
Riggers in the construction industry are involved with setting up the pieces of equipment necessary to keep the ship functioning: ropes, pulleys, winches, and cables.
1.Align, level, and anchor machinery.
2. Attach loads to rigging to provide support or prepare them for moving, using hand and power tools.
3.Attach pulleys and blocks to fixed overhead structures such as beams, ceilings, and gin pole booms, using bolts and clamps.
4.Control movement of heavy equipment through narrow openings or confined spaces, using chainfalls, gin poles, gallows frames, and other equipment.
5.Fabricate, set up, and repair rigging, supporting structures, hoists, and pulling gear, using hand and power tools.
6.Manipulate rigging lines, hoists, and pulling gear to move or support materials such as heavy equipment, ships, or theatrical sets.
7.Select gear such as cables, pulley
8. Dismantle and store rigging equipment after use.
PERSONAL DATA
Provincial Address: Daan Bantayan, Cebu City
Zumaraga, W. Samar Leyte
Birth Date: February 21, 1981
Weight: 150lbs.
Sex: Male
Religion: Roman Catholic
Citizenship: Filipino
Father’s Name: Antolin I. So
Occupation: Retired gov’t Driver
Mother’s Name: Luz A. So
Occupation: House Wife
LANGUAGE/DIALECT SPOKEN, WRITTEN AND UNDERSTOOD
English,Tagalog & Bisaya
PERSONAL TO BE CONTACT INN CASE OF EMERGENCY
Mrs. Maribel A. So
# 153 Pantabangan St.NPC Village Tandang Sora, Quezon City
Contact no. 5086758/ 09997771612
CHARACTER REFERENCE
Mrs. Mercy Buslon Mr. Mark Alberto B. Canlas
Public /Teacher Corporate Planning Division
AMA COMPUTER Learning Center National Transmition Corporation
SO, Ryan Arriesgado
___________________________
Signature of employment
Im under graduate of B.S. elelectronic communication engineering at Central colleges of the Philippines
• Responsible for signaling, position of crane, material using for lifting and status of crane.
• Working under supervision of the crane operator and the safety of the working area.
• Performs oth• Responsible for signaling, position of crane, material using for lifting and status of crane.
• Working under supervision of the crane operator and the safety of the working area.
• Performs other duties responsibilities as per direction by immediate supervisor
er duties responsibilities as per direction by immediate supervisor
DOOSAN HEAVY INDUSTRIES AND CONSTRUCTUION Rabigh Power Plant 2 SAUDI ARABIA in this project as a rigger in power plant I handle also 100 tons TADANO mobile crane for erection of ducting and pipeline but most of all in duckting that using for chimney and also pipe that support to the line . I also using boom truck for some small material lifting that cannot allow our crane. In every work I make all my material make sure all are no damage like sling shackle with I a proper procedure using in lifting material by inspect the quality of all material that I most use for lifting . Signal is the most important in rigging and lifting plan before start the work. I most fallow our supervision before we start my job
DAEAH ENGINNERING AND CONSTRUCTION (SARB) package 4 Satah Al rasboot oil and gas refinery Abhudabi UAE this project more on pipe track line as a rigger my job is installation of pipe line and erection using 100 ton mobile crane TADANO with appropriate material like shackle sling belt in different tons according to the weight of material we lifting. In our project we maintain our material like the safety working load (SWL) we make sure that we using a right equipment for our lifting procedure. I also make a proper signal to the crane operator that can easily understand the lifting area
DAEAH ENGINNERING AND CONSTRUCTION (SARB) package 4 Satah Al rasboot oil and gas refinery Abhudabi UAE this project more on pipe track line as a rigger my job is installation of pipe line and erection using 100 ton mobile crane TADANO with appropriate material like shackle sling belt in different tons according to the weight of material we lifting. In our project we maintain our material like the safety working load (SWL) we make sure that we using a right equipment for our lifting procedure. I also make a proper signal to the crane operator that can easily understand the lifting area