WORK EXPERIENCE:
November 2015 – December 2017
Position: QA/QC ENGINEER (MECHANICAL)
MEP QA/QC
GREENLINE QATAR RAIL PROJECT (PACKAGE 3 – TUNNEL)
Company: REDCO International
Trading & Contracting W.L.L.
P.O. Box No. 16750, Doha, Qatar
Responsibilities:
ü Conduct inspection on site and ensure that the implementation of works as per procedure and project specifications;
ü Develop written procedures for quality control/quality assurance
ü Perform needed tests on site to ensure conformity of material and works according to the contract specifications;
ü Ensure that contractors comply with works’ specifications;
ü Ensure to issue Non Conformity Report and Site Corrective Action Report in any issues regarding procedure and installation as per project specifications;
ü Supervision of the contractors in the implementation of the work;
October 2011 – June 2015
Position: MATERIAL ENGINEER (MECHANICAL)
PURCHASING & CONTRACTS DEPARTMENT
Company: QATAR PETROLEUM, Doha Qatar
Worked as a Material Standardization Engineer and assigned under mechanical discipline for the contracted spare parts cataloging projects of Qatar Petroleum under Material Master Data group of Purchasing & Contracts Department. My job position was involved in all mechanical equipment and its spare parts for all the plant repair, maintenance and operation. Using SAP System as our Software. Also, familiar with Qatar Petroleum Standard and International Standards like ASTM, DIN, BS, AISI and ASME.
Responsibilities:
ü Assigned in review and cataloging of spare parts data package and responsible for cataloging, updating status reports;
ü Review materials specification and ensures that it complies with the project and operation procedure, specification and standards;
ü Conduct field physical inspection of different types of equipment;
ü Read as-built drawings and other various activities to facilitate completion of material cataloging for spare part stocking of various mechanical equipment such as:
· Pumps;
· Turbines;
· Compressor;
· AHU/HVAC equipment;
· Diesel engine;
· Valves, Pipes and Flanges;
· And other equipment under mechanical discipline in project such as:
Ø Gas operations and plant maintenance in sites such as Dukhan, Messaied, Ras Laffan;
Ø On/Off Shore sites;
February 2008 – October 2011
Position: MATERIAL STANDARDIZATION ENGINEER (MECHANICAL)
Company: RADICON GULF CONSULT (RGC), Al Khobar, Saudi Arabia
Worked as a Material Standardization Engineer and assigned under mechanical discipline for the contracted spare parts cataloging projects of Qatar Petroleum under Material Master Data group of Purchasing & Contracts Department. My job position was involved in all mechanical equipment and its spare parts for all the plant repair, maintenance and operation. Have a good knowledge in Saudi Aramco MACS and SAP System and also familiar in Saudi Aramco and International Standards like SAMSS, SAES, ASTM, AISI, DIN, BS and ASME.
Responsibilities:
ü Assigned in review and cataloging of spare parts data package and responsible for cataloging, updating status reports;
ü Review materials specification and ensures that it complies with the project and operation procedure, specification and standards;
ü Conduct field physical inspection of different types of equipment;
ü Read as-built drawings and other various activities to facilitate completion of material cataloging for spare part stocking of various mechanical equipment such as:
· Pumps;
· Turbines;
· Compressor;
· AHU/HVAC equipment;
· Diesel engine;
· Valves, Pipes and Flanges;
· And other equipment under mechanical discipline in project such as:
Ø Gas operations and plant maintenance in sites such as Diesel/Gas Operations, Plant maintenance, Diesel Production in sites such as Ras Tanura Refinery, Shayba, Shedgum, Uthmaniyah, Berri, Hawiyah, Ju’aymah, Yanbu, Safaniyah Gas Plant and KAUST Project;
Ø On/Off Shore sites;
Also, work with ATKINS for Saudi Water and Waste Water Treatment Plant project based in Riyadh Saudi Arabia. This project involves in all the plant equipment installation, plant piping and pump modification/revision that includes Water drilling and pumping stations. Equipment inventory and tagging system also includes in this project for future repair and maintenance of the plant.
February 2004 – February 2008
Position: BOILER ENGINEER
Company: BISCOM SUGAR MILLING COMPANY – Negros Occidental, Philippines
Worked under Boiler Repair and Maintenance Group from February 2004 to 2006 during milling season and involved in plant repair, maintenance & preventions during operation of Boiler and its auxiliary equipment such as Feed Water Pump, Steam Turbine, Induce & Force Draft Fan, Metering and Ash Conveyor. During off-milling season, responsible for total repair and reconditioning of Boiler and its auxiliary equipment such as Feed Water Pump, Steam Turbine, Induce & Force Draft Fan, Metering and Ash Conveyor and Boiler structural. From 2006 to 2008 assigned as 90 and 100 Tons Boiler Control Panel Operator such as Bigelow and Foster Wheeler Two Drum Water Tube Boiler in which I am responsible for Boiler Operation and total plant steam production and operation which includes not only on Boiler Operation and its accessories but also for the equal distribution of steam not only on Boiler Department but also for Power House, Boiling Housing & Mill Department.
January 2002 – October 2003
Position: MECHANICAL ENGINEER
Company: KES Engineering and VICTORIAS Milling Company – Negros Occidental, Philippines
Worked as Mechanical Engineer and assigned in Boiler Repair during Milling and Off-milling season including Boiler accessories, auxiliaries, and steam cooling, feed water pipelines and structural repair.
March 1999 – October 2001
Position: MECHANICAL ENGINEER
Company: ROSS and PAGS Engineering – Manila, Philippines
Assigned as Mechanical Engineer for HVAC installation and duct size modification as per required in the project proposal/drawing. Listed below are the responsibilities that I am handling during the project:
– Monitored projects and ensured its proper execution.
– Prepared the submittals required for the materials and ensured that they were in compliance with the specifications.
– Inspected the material and escalated all issues to the consultants.
– Evaluated the job performed and provided the necessary follow up for payments.
– Developed drawings for the job close out and prepared the O&M manuals.
– Scheduled the project and performed and ensured that the project timeline was maintained.
March 1996 – August 1996
Position: Production Junior Engineer
Company: Coca-Cola Bottler’s Phil. – Pampanga, Philippines
Assigned in Production department as Junior Engineer and was responsible in production operation & maintenance, man-hour and job assignments for the operation staff and rotation which also includes production department repair of equipment such as Bottle & casing conveyor, Bottle cleaner, Filler and Caser during operations. Also, attended on-the-job training in this company and assigned in engineering department and able to participate in repair of Diesel Generator and various equipment such as conveyor, pump and compressor during my 4TH year in college as part of my school requirements.
EDUCATION:
1980-1986: Completed Elementary Education
San Teodoro Elementary School
Binalbagan, Negros Occidental, Philippines
1986-1990: Completed Secondary Education
Binalbagan Catholic College
Binalbagan, Negros Occidental, Philippines
1990-1995: Completed Bachelor of Science in Mechanical Engineering (BSME Degree)
Holy Angel University
Angeles City, Philippines
ELIGIBILITY:
Third Place Mechanical Engineering Licensure Board Examination
Saudi Arabia dated March 26-27 2009
PRC License Certificate no. 72174.
PROFESSIONAL AFFILIATION:
Regular Member – Philippine Society of Mechanical Engineers (PSME), Saudi Arabia Chapter
Regular Member – Philippine Society of Mechanical Engineers (PSME), Qatar Chapter
Conduct inspection on site and ensure that the implementation of works as per procedure and project specifications;
Develop written procedures for quality control/quality assurance
Perform needed tests on site to ensure conformity of material and works according to the contract specifications;
Ensure that contractors comply with works’ specifications;
Ensure to issue Non Conformity Report and Site Corrective Action Report in any issues regarding procedure and installation as per project specifications;
Supervision of the contractors in the implementation of the work
Worked as a Material Standardization Engineer and assigned under mechanical discipline for the contracted spare parts cataloging projects of Qatar Petroleum under Material Master Data group of Purchasing & Contracts Department. My job position was involved in all mechanical equipment and its spare parts for all the plant repair, maintenance and operation. Using SAP System as our Software. Also, familiar with Qatar Petroleum Standard and International Standards like ASTM, DIN, BS, AISI and ASME.
Responsibilities:
Assigned in review and cataloging of spare parts data package and responsible for cataloging, updating status reports;
Review materials specification and ensures that it complies with the project and operation procedure, specification and standards;
Conduct field physical inspection of different types of equipment;
Read as-built drawings and other various activities to facilitate completion of material cataloging for spare part stocking of various mechanical equipment such as:
• Pumps;
• Turbines;
• Compressor;
• AHU/HVAC equipment;
• Diesel engine;
• Valves, Pipes and Flanges;
• And other equipment under mechanical discipline in project such as:
Gas operations and plant maintenance in sites such as Dukhan, Messaied, Ras Laffan;
On/Off Shore sites
Worked as a Material Standardization Engineer and assigned under mechanical discipline for the contracted spare parts cataloging projects of Qatar Petroleum under Material Master Data group of Purchasing & Contracts Department. My job position was involved in all mechanical equipment and its spare parts for all the plant repair, maintenance and operation. Have a good knowledge in Saudi Aramco MACS and SAP System and also familiar in Saudi Aramco and International Standards like SAMSS, SAES, ASTM, AISI, DIN, BS and ASME.
Responsibilities:
Assigned in review and cataloging of spare parts data package and responsible for cataloging, updating status reports;
Review materials specification and ensures that it complies with the project and operation procedure, specification and standards;
Conduct field physical inspection of different types of equipment;
Read as-built drawings and other various activities to facilitate completion of material cataloging for spare part stocking of various mechanical equipment such as:
• Pumps;
• Turbines;
• Compressor;
• AHU/HVAC equipment;
• Diesel engine;
• Valves, Pipes and Flanges;
• And other equipment under mechanical discipline in project such as:
Gas operations and plant maintenance in sites such as Diesel/Gas Operations, Plant maintenance, Diesel Production in sites such as Ras Tanura Refinery, Shayba, Shedgum, Uthmaniyah, Berri, Hawiyah, Ju’aymah, Yanbu, Safaniyah Gas Plant and KAUST Project;
On/Off Shore sites;
Also, work with ATKINS for Saudi Water and Waste Water Treatment Plant project based in Riyadh Saudi Arabia. This project involves in all the plant equipment installation, plant piping and pump modification/revision that includes Water drilling and pumping stations. Equipment inventory and tagging system also includes in this project for future repair and maintenance of the plant.
Worked under Boiler Repair and Maintenance Group from February 2004 to 2006 during milling season and involved in plant repair, maintenance & preventions during operation of Boiler and its auxiliary equipment such as Feed Water Pump, Steam Turbine, Induce & Force Draft Fan, Metering and Ash Conveyor. During off-milling season, responsible for total repair and reconditioning of Boiler and its auxiliary equipment such as Feed Water Pump, Steam Turbine, Induce & Force Draft Fan, Metering and Ash Conveyor and Boiler structural. From 2006 to 2008 assigned as 90 and 100 Tons Boiler Control Panel Operator such as Bigelow and Foster Wheeler Two Drum Water Tube Boiler in which I am responsible for Boiler Operation and total plant steam production and operation which includes not only on Boiler Operation and its accessories but also for the equal distribution of steam not only on Boiler Department but also for Power House, Boiling Housing & Mill Department.
Worked as Mechanical Engineer and assigned in Boiler Repair during Milling and Off-milling season including Boiler accessories, auxiliaries, and steam cooling, feed water pipelines and structural repair.
Assigned as Mechanical Engineer for HVAC installation and duct size modification as per required in the project proposal/drawing. Listed below are the responsibilities that I am handling during the project:
– Monitored projects and ensured its proper execution.
– Prepared the submittals required for the materials and ensured that they were in compliance with the specifications.
– Inspected the material and escalated all issues to the consultants.
– Evaluated the job performed and provided the necessary follow up for payments.
– Developed drawings for the job close out and prepared the O&M manuals.
– Scheduled the project and performed and ensured that the project timeline was maintained.
Assigned in Production department as Junior Engineer and was responsible in production operation & maintenance, man-hour and job assignments for the operation staff and rotation which also includes production department repair of equipment such as Bottle & casing conveyor, Bottle cleaner, Filler and Caser during operations. Also, attended on-the-job training in this company and assigned in engineering department and able to participate in repair of Diesel Generator and various equipment such as conveyor, pump and compressor during my 4TH year in college as part of my school requirements.