Trifon T. Deloso
Block 19 Lot 31 Villa Angela Civil Status: Married
Balulang, Cagayan de Oro City Date of Birth: November 10, 1968
Tel. # (0912) 821-0307 Place of Birth: Suba, Anda, Bohol
Work Experience
Administrative Aide IV City Assessment Office, Research
And Statistics Division IT-GIS Unit
City Hall, Capistrano St.
Cagayan de Oro City
February 8, 2017 – Present
Technical Support Representative Teleperformance
C. M. Recto Avenue, Cagayan de Oro City
August 2, 2016 – January 31, 2017
Product Support Representative Synnex-Concentrix
Block 2 Lot 3 Pueblo de Oro Business Park
Pueblo de Oro, Upper Carmen
Cagayan de Oro City
August 2006 – July 30, 2017
Production Engineer II Procter and Gamble Philippines
Product Supply Organization
Light Industry and Science Park of the
Philippines, Cabuyao, Laguna
September 5, 1995 – February 3, 2003
Accomplishments:
Concentrix
Contributed to the High Customer Satisfaction for Linksys & Belkin Products above 80%
Procter & Gamble Phils. Inc.
Member of the Pilot Team that achieved 90% Process Reliability on Start Up and Regular production phases of Synthetic Detergent Bar Plant
Positions Held:
Shift Lead/Supervisor
Hazardous Chemicals and Materials Handling Officer
Shift Safety Leader
Safety Officer for Checking and Issuing Safety Permits
Safety and Process Overview Trainer
Lift Truck Trainer for Warehousing Operations
Chilled and Tempered Water, Process Pumps Maintenance Owner
Inventory Owner for Hazardous Chemicals and Materials
September 1995 – Feb 2003
Job Descriptions:
Synthetic Detergent Bar Batch Making / Finishing – Sept. 1995 – Jan. 1998
Synthetic Detergent Bar Inbound Logistics – Feb. 1998 – Feb. 1999
Fabric & Home Care Shared System – Feb. 1999 – Jan. 2003
(Shared Systems & Plant Utilities)
Commissioned:
– Supersack Unloading Systems
– Collection and Distribution Belt Conveyors
– FKM 3000 Mixers and Liquid Dosing Systems
– Minor Powder Dumping and Dust Controls
– Minor Powder Dumping and Dust Controls
– Pneumatic Conveying System:
– Vibrajets
– Rotary Feeder Valves and Accessories
– Pneumatic Supply Lines and Controls
– Hoists
– Dust Controls
– Powder Storage (Surge Bins)
Accomplishments:
Lead in projects involving design modifications, restoration, & took part in Vertical Plant Start-up.
Responsible for the high reliability of Chilled & Hot Water Systems.
Developed and Initiated Safety Standards in Handling Hazardous Chemicals.
Developed and Implemented Operating and Safety Standards in handling and dumping minor powders.
Responsible for sustaining high process reliability (95%) in Syndet Bar Soap Batch making Process.
Revised Perfume unloading and dosing area Design and initiated Safety Operating Standards.
Restored to original operating conditions all Major and Minor Liquids Unloading Pumps, Waste Water Sump and Tank Discharge Pumps.
Developed and implemented Safety Operating Standards on Handling Bulk Powder System in Sea Container Vans.
Trained New Hires in Plant Operations Overview, Forklift and Inbound Logistics Operation.
Machine Technician Prifood Corporation
Canduman, Mandaue City
Apr. 3, 1994 – Aug. 15, 1995
Training/Seminars Attended
1. Pneumatics Equipment Seminar USJ-R Cebu City
SMC Penumatics March 5, 1995
2. On Boarding Training Procter and Gamble Phils.
Sept. 18, 1995-Nov. 11, 1995
Drive Systems
Statistical Process Control
Basic Mechanical Technology
Fundamentals of Instrumentation and
Process Control
Pneumatics and Electronics
Basic Industrial Electronics
Industrial Motor Control
PLC programming
3. Industrial Hygiene and Safety Seminar Procter and Gamble Phils.
November 20, 1995
4. Fire Prevention Seminar Procter and Gamble Phils.
Nov. 21, 1995
5. Oracle, Process, Quality Procter and Gamble Phils.
and Reliability Training Nov. 22,23, 1995
6. High Performance Work System Procter and Gamble Phils.
Nov. 27, 1995-Dec. 1, 1995
7. Computer Based Safety Training Procter and Gamble Phils.
Dec. 11 – 15, 1995
8. Advance Mechanical Maintenance Training Procter and Gamble Phils.
Tondo Manila Plant
Dec. 18, 1995-Feb. 23, 1995
9. Fundamentals of Shaft Sealing Procter and Gamble Phils.
(John Crane Phils.) January 19, 1996
10. Major Liquids Pilot Training Procter and Gamble Phils.
March 11 – 15, 1996
11. Major Powders Pilot Training Procter and Gamble Phils.
March 25-29, 1996
12. Folklift Operator & Instructor Training Procter and Gamble Phils.
(Yaletrak Phils) April 8, 1996-May 3, 1996
13. Syndet Bar Environmental Procter and Gamble Phils.
Management Training May 7,8,9, 1996
14. Train the Coach Training Procter and Gamble Phils
June 3-7, 1996
15. Confined Space Entry Training Procter and Gamble Phils.
June 17, 18, 1996
16. Pressure Difference Blower Training Procter and Gamble Phils.
July 1-5, 1996
17. Microsoft Word & Excel Hands-On Training Procter and Gamble Phils.
July 8-12,1996
18. Bearing Maintenance Training Procter and Gamble Phils.
(SKF Bearing) August 12,13, 1996
19. Integrated Work System Seminar Procter and Gamble Phils.
July 27, 28, 1997
20. SAP 3.0 User Training Procter and Gamble Phils.
April 12-16, 1999
21. Maitenance and Operation on National Engineering Center
Refrigeration and Air Conditioning University of the Philippines.
Diliman Quezon City
Aug. 11-13, 1999
22. Process Control Strategy Procter and Gamble Phils.
Aug. 31 – Sept. 2, 2000
23. Chemical Exposure Safety Training Procter and Gamble
Huangpo Plant
Guangzhou, China – Sept. 3-7, 2001
Education 1990-1995 Bachelof of Science in Mechanical Engineering
University of San Jose-Recoletos
Cebu City
Extracurricular Activities USJ-R Varsity Weightlifting Team member
Liturgical Yodlers-Recoletos (choir) member
USJ-R Dramatics Guild (guitarist) member
References:
Mr. Jegmark Canazares Operations Supervisor/Team Captain 3
Concentrix Corp.
Pueblo de Oro
Upper Carmen
Cagayan de Oro City
Engr. Venerando Comaling College Professor
Mechanical Engineering Department
Don Mariano Marcos Polytechnic College
Lapasan, Cagayan de Oro City
Ms. Mia Macatol HR Supervisor
SM Prime
C M Recto Ave.
Cagayan de Oro City
I hereby certify that this document is true and correct to the best of my knowledge.
Trifon T. Deloso