ABDUL AHAD
Industrial engineering ★ Lean ★Supply chain ★ Enterprise Resource Planning (ERP)
House No R-522 Sector 15-A/3 buffer zone, Karachi +923412383896, +923122690798
[email protected] https://pk.linkedin.com/in/abdul-ahad
CAREER OBJECTIVE_____________________________________________________________
To Be the part of such a dynamic, learning and competitive environment where I can contribute through my smart work and best utilisation of my knowledge & skills.
EDUCATION AND CREDENTIALS___________________________________________________
Masters of Business Administration (MBA) in Logistics & Supply Chain Management In progress
Institute of Business Management, Karachi
Bachelor of Engineering (B.E) in Industrial Engineering & Management 2013-2016
Dawood University of Engineering & Technology, Karachi, Pakistan
CGPA 3.38
Certifications
Six Sigma Yellow Belt Professional from 6sixsigmastudy
Basic CAD training on CATIA V5 from Institute of Industrial and System Engineers(IISE)-DUET Chapter
Affiliation
Pakistan Engineering Council (PEC) Registered Engineer PEC NO INDUSTRIAL/03489
Institute of Industrial and System Engineers(IISE)-DUET Chapter
CORE COMPETENCIES___________________________________________________________
Industrial Engineering
Material Management
Supply chain Management
Order Management
Enterprise Resource Planning (ERP)
Lean manufacturing, Six sigma
Inventory Management
Production Planning
WORK EXPERIENCE_____________________________________________________________
Executive Industrial Engineer Feburary2018-Current
Artistic Fabric and Garments Industries
Analyze current inventory systems, parameter, models and processes and identify areas for improvement in the systems and planning polices to boost performance and reduce costs implement changes and new systems.
Full inventory analysis and management using Oracle.
Plan and oversee material movement through production cycle.
Administering MRP settings and Inventory master data.
Collaborate with IT professionals to implement effective ERP systems
Compliance around material control and flow procedures, Driving KPI’s at multiple warehouse locations.
Execute continuous improvement and inventory optimization projects.
Provide inputs for the preparation of accurate and timely performance reports track KPIs and report on supply chain’s performance.
ACHIEVEMENTS PROJECTS
Optimization of Inventory level and Implementation of FIFO (First in First out) method
Analyze 0.7 billion PKR worth of inventory at main warehouse
Implement FIFO (First in First out) based inventory method to control Stock Aging.
Reduce inventory level by minimizing Dead stock points and maximizing Slow moving stocks.
Identification & Utilization of Slow moving and Dead Stock Inventory at main warehouse
Categorize inventory of fabric to analyze Running, slow moving and Dead Stocks
Identified fabric dead stock of 0.25-million-meter worth of Approx. 90 million PKR.
Utilization of Slow moving stocks to reduce inventory level.
Setup bin and rack locations for effective Warehousing operations
Create and use bin locations in 4 different halls in main warehouse of fabric to ensure that bins and pallets are placed carefully on shelves in the assigned location.
Minimize lost or misplaced inventory and reduces time spent looking for materials
Significant reduction of forklift movement within warehouse due to easy traceability and retrieval of materials save fueling consumption cost of forklifts also decreases in-house Air pollution.
Management Trainee Operations May2017-January2018
Bright Star Electroplating & Engineering (Pvt) Ltd
Initiated work on an Enterprise resource planning (ERP) system to integrate different departments/function and to develop solid understanding within organization.
Responsible for working alongside with different departments in organization (supply chain, production, quality) and performing delegated responsibilities and duties Schedule daily meetings.
Planning delivery timetables, ensuring stores have enough stock & Monitoring stock levels
Making sure vendors/suppliers have enough stock to meet demand
Overseeing the ordering and packaging process
Tracking products to make sure they arrive at their destination
Overseeing arrival of shipment
Project Intern April2016-November2016
Dawlance (Pvt) Ltd DPL-1, Karachi
Worked on several projects done Value stream mapping, Time & motion studies, Quality audits and using different Industrial engineering techniques.
ACADEMIC PROJECTS
Accomplished Final Year Project on “Defect Reduction and improvement in Straight Pass Ratio (SPR) through the application of Lean techniques” with following outcomes.
Significant reduction in defect %
Improvement in Straight pass ratio (SPR) and overall equipment effectiveness (OEE) levels
Improvement in product quality
Minimization of wastages and saves rework cost & time
Heijunka (production leveling) to reduce excess amount of buffer stocks.
Ergonomic designs of working table to improve worker’s efficiency.
Proposed future expansion layout plan of department within existing facilities.
Optimal utilization of floor space by re-layout design.
Reduction in excess movement of automated Manipulator of door foaming machine.
Optimization of function test lines of refrigerator through time study and simulation techniques.
Engineering Internship December2015-January2016
Hinopak Motors Limited, Karachi
Worked at FRP (Fiber Reinforcement Plastic) department where conducted Process and Time Study, collected Layout details and 5s applications of department
Engineering Internship June2015-July2015
Pakistan Council of Scientific Industrial Research (PCSIR), Karachi
Worked at Engineering Service Department where learn basics of design engineering software PRO-E/CREO
parametric Learn basics of operating CNC (Lathe & Milling) machines and manual machines
PERSONAL INTERESTS___________________________________________________________
Traveling, Exploring new technologies, Web browsing, Reading