Photo

Abid Ali Syed ENGINEERING & MAINTENANCE PROFESSIONAL

Pakistan
20032008 | AutoCAD 2d/3D2014 | Advance Firefighting2014 | Diversity at work2015 | NEBOSH IGC2015 | Presentation SkillsForeign and Common Wealth OfficeProject ManagementSustainable Business Solutions

Business-focused, energetic, and resourceful Engineering & Maintenance Professional with 20+ years of experience in planning, developing, and implementing solutions in textile processing, cement, oil & gas, and port industry. Possesses the ability to successfully analyze an organization’s support requirements, identify deficiencies or opportunities, and develop effective solutions for increasing reliability and productivity of HFO/LFO, gas generators, fuel purifying systems, RO plants, electrical panels/switch gears, and fire separation & protection systems. Having knowledge of heat exchangers PRV valves, port equipment, and diesel engines/generators. Ability to re-engineer business processes and streamline operations to ensure maximum efficiency. Mature, confident, and focused professional with the ability to excel during any challenges.

Education

2009/2011 Bachelor, Mechanical (Technology), at Indus Institute of Higher Education, Karachi, Pakistan
1989/1992 Bachelor, Physics & Math at University Of Karachi, Karachi

Experience

2014 to Present SR. MANAGER MAINTENANCE at INDUSTRIAL SERVICES & SOLUTIONS PVT LTD , Karachi, Pakistan

 Planning of cost effective maintenance strategies and overseeing the overall maintenance activities.
 Maintenance and capital expenses project budgeting.
 Indenting of technical purchases and quality assurance as per manufacturer standards.
 Helping to investigate root cause failure analysis.
 Technical staff/dept. administration, appraisals and performance management.
 Provide Health and Safety awareness to staff and ensure hazard free workplace environment.
 Industrial Solutions & Services provides all aspects of work in the area of Mechanical and Electrical installations including Plumbing services, Air-Conditioning, Chillers, Cooling Towers, Boilers, Power Generation and BMS system for Pakistan since

2010/2014 MANAGER MAINTENANCE at KARSAZ (PVT) LTD. • Karachi, Pakistan

 Intelligently sustained engineering standards/recommendations, revised incoming breakdowns, supervised maintenance activities, analysed root cause failure, resolved issues, and in addition to this involved in annual maintenance budgeting.
 Engaged in spars planning, indenting, and quality assurance, classified vendors, upheld technical correspondence, trained staff, administered engineering workforce, also helped in performance appraisals/monitoring and job assignment.
 Brought improvement in facilities to increase equipment life, remade prime movers Cummins, Nissan, Isuzu engines, and Allison automatic transmission in house, and saved thousands of dollars in account of purchasing.
KEY ACCOMPLISHMENTS
 Identified the root causes of equipment breakdowns, Identified the vendors and suppliers in the country and internationally
 Identify the vendors and suppliers in the country and internationally to ensure supply of quality parts, trained the arcticians with new skills for new challenges and rectified the issues within year for smooth operation.
 Refurbished four Terminal Tractors completely from scrape and add in fleet.

2009/2010 FACILITIES MAINTENANCE ENGINEER at BRITISH PETROLEUM PAKISTAN EXPLORATION & PRODUCTION INC. • Karachi, Pakistan

 Executed & adjusted standby generators, electrical systems for online servers, switch gears, fire equipment, and HVAC systems, carried out daily maintenance, arranged the equipment’s for emergencies, produced work permits, and worked with technical team.
 Scrutinized equipment & fault finding, solved problems of on-line equipment, maintained requisitions and minimum stock level, as well as complied with the company policies and safe working processes.

2006/2008 SR. MANAGER MAINTENANCE at DADABHOY CEMENT INDUSTRY LTD • Karachi, Pakistan

 Skilfully developed maintenance philosophy & procedures for plant preventive conservation, supervised repairs operations, interpreted requirement on engineering methods to achieve construction requirements.
 Prudently resolved conflicts for reliable operation, also addressed safety awareness to staff by following best market practices, supervised utilities department which contains steam boilers and screw compressors.

2004/2006 SR. MANAGER MAINTENANCE at AL ABID SILK MILLS (PVT) LTD. • Karachi, Pakistan

 Looked after plant preventive and breakdown maintenance, controlled spears inventories, upcoming demand, and all technical activities, erected textile machines, increased machine reliability, facilitated critical fault analysis and root cause failure analysis.
 Guided technical staff, interpreted specification on engineering methods to achieve construction requirements, analysed all received breakdowns, and gave solutions for reliable and continuous operation in an efficient manner.

1999/2003 Manager Maintenance at A.H INTERNATIONAL (PVT) LTD. • Karachi, Pakistan

 Executed plant preventive maintenance schedule, retained spears inventory, evaluated critical mistakes, overhauled Atlascopco compressors, boilers, Cummins 855, CAT 3512 standby generators, production machines, various pumps and Mitsubishi chillers.
 Monitored electrical load management and optimization of generators, steam, and thermal boilers.

1994/1999 JR. ENGINEER at MUHAMMAD FAROOQ TEXTILE MILLS LTD. • Karachi, Pakistan

 Transformed equipment’s for batter performance, solved concerns of production machines, compressors, pumps & chillers, created detailed engineering proposal computations, and ensured optimum performance of a certain engineering designs.