ADRIAN DE CHAVEZ PANGANIBAN 222 San Isidro, Batangas City,
Batangas, Philippines
Cel #.: 09176669796
Email : [email protected]
Position: Pipe Insulator / Tin smith
CAREER OBJECTIVE
To be able to participate in the company’s operation that will enhance all my knowledge and skills in the field, towards realization of company’s vision and mission to attain excellence in the present and future needs and demands of the society.
EMPLOYMENT EXPERIENCE
Cape Philippines
6th Floor iHub 1, Northgate CyberZone, Filinvest Corporate City, Alabang Zapote Road, Muntinlupa City, Philippines 1781
Muntinlupa Philippines
Port Moresby Power Station Project
Papua New Guinea
Lagger / Tin smith
September 14, 2018 to February 01, 2019
Duties and Responsibilities:
· Participate in pre-start and tool box meeting, Participate in step-back 5×5 per quarter of work.
· Participate in the development of Job Hazard Analysis (JHA)’s and site risk assessment discussions.
· Follow all client safety procedures and objectives.
· Read and understand all relevant permits, method statements and risk assessment discussions
· To curry out all works in a professional manner and to the required specification.
· Conversant with all insulation standards and specifications.
· Competent with insulation, coating and cladding application.
· To insulate steam tracing, copper tubing
· To insulate pipe and elbows, Tee reducer.
· To insulate drums, vessels, heater exchanger, columns and underground pipe.
· Be prepared to assist all other trades within his capability in the performance of operations being carried out be they construction or maintenance.
· Responsible in inspecting and maintaining insulation equipment before use.
· Sheet metal fabricating
· Housekeeping before/during/after of work.
Cape Australia Pty Ltd.
Level 17, London, House, 216 St. Georges Terrace WA 6000
Bayu Undan Maintenance Project
IRATA L1 Lagger
31 March 2018 to June 22, 2018
Duties and Responsibilities:
· Participate in pre-start and tool box meeting, Participate in step-back 5×5 per quarter of work.
· Participate in the development of Job Hazard Analysis (JHA)’s and site risk assessment discussions.
· Follow all client safety procedures and objectives.
· Read and understand all relevant permits, method statements and risk assessment discussions
· To curry out all works in a professional manner and to the required specification.
· Conversant with all insulation standards and specifications.
· Competent with insulation, coating and cladding application.
· To insulate steam tracing, copper tubing
· To insulate pipe and elbows, Tee reducer.
· To insulate drums, vessels, heater exchanger, columns and underground pipe.
· Be prepared to assist all other trades within his capability in the performance of operations being carried out be they construction or maintenance.
· Responsible in maintaining personal log books to confirm experience and promote progression in qualification; log nature of work, customer’s name and team size; duly countersigned by the Rope Access L3 Supervisor.
· Must always wear appropriate PPE before carrying out rope access activities.
· Carry out regular training exercises involving Rescue Techniques as required.
· Responsible in inspecting and maintaining equipment before use.
· Sheet metal fabricating
· Ulva shield fabricating.
Joel Chavez Construction and General Services
JG Summit , Petrochemical Plant Shutdown
#768 Libjo, D’hope, Batangas City, Batangas Philippines 4200
Instrument technician
May 15, 2017 – May 26, 2017
Duties and Responsibilities:
· Attend daily tool box meeting to know work priority and safety acknowledgement.
· Checking of Industrial Instrument
· Calibration of Industrial Instrument (Pressure, temperature and Flow)
· Assist Maintenance in Instrument Fitting and mechanical work.
· Pull-out instrument in way of mechanic work
· Cable lay-out to replace damage instrument cable.
· Remove defective and install new pipe tubing of pressure indicator and relief valve
· Replace o-ring and packing of valve actuator
· Replace defective solenoid
· Install new solenoid ball valve
· Practice good housekeeping before and after work.
Dyundia E/C Jicon
Hyundia / UAE Mirfa IWPP Project
Insulator
November 29, 2016 to February 11, 2017
Duties and Responsibilities:
· Attend morning safety meet
· Prepare insulation material and tool to be use
· Arrange all the tools and equipment to be use
· Secure the work area is safe to work in (barrages and signage)
· Check the condition of the work piece if it is safe to work on to
· Measure and cut insulation to be install
· Install pipe insulation
· Install vapor barrier
· Install metal cladding
· Housekeeping before, during and after work are done
SiteServ Inc
Malampaya OGP (Onshore Gas Plant)
Tabangao, Batangas City, Batangas, Philippines
Person in Charges to the Work Site (PICWS)/Team Leader
Blasting / Painting / Insulator / Chartek Applicator (FP)
July 01, 2015 to October 29, 2016
Duties and Responsibilities:
· Attend morning safety meet
· Secure accurate work permit for the job to be done
· Discuss tool box meeting to work parties and concerned personnel
· Coordinate with the Area Authority for the procedure of the work to be done
· Discuss safety to work party and parties near the work site
· Secure and monitor the safety of the work party and equipment
· Arrange all the tools and equipment to be use
· Secure the work area is safe to work in (barrages and signage)
· Check the condition of the work piece if it is safe to work on to
· Arrange all the tools and equipment to be use
· Install / dismantle temporary habitat for blasting
· Manual De-rusting / Grit Blasting of pipe and vessel
· Spray / manual painting of pipe and vessel
· Prepare insulation material and tool to be use
· Measure and cut insulation to be install
· Install pipe insulation
· Install vapor barrier
· Install metal cladding
· Mix chartek7 according to specification
· Apply chartek7 to pipe
· Install HK-1 mesh
· Work as for Client Specification
· Ask QA / QC personnel to check the job being done and their go signal to proceed to the next job / procedure
· Report with supervisor and Area Authority about the status on the work
· Housekeeping before, during and after work are done
SiteServ Inc
Malampaya Shallow Water Platform (Off-shore Platform)
Palawan, Philippines
Person in Charges to the Work Site (PICWS)/Team Leader
Blasting / Painting / Insulator
August 16, 2014 to June 30, 2015
Duties and Responsibilities:
· Attend morning safety meet
· Secure accurate work permit for the job to be done
· Discuss tool box meeting to work parties and concerned personnel
· Coordinate with the Area Authority for the procedure of the work to be done
· Discuss safety to work party and parties near the work site
· Secure and monitor the safety of the work party and equipment
· Arrange all the tools and equipment to be use
· Secure the work area is safe to work in (barrages and signage)
· Check the condition of the work piece if it is safe to work on to
· Arrange all the tools and equipment to be use
· Install / dismantle temporary habitat for blasting
· Manual De-rusting / Grit Blasting of pipe and vessel
· Spray / manual painting of pipe and vessel
· Prepare insulation material and tool to be use
· Measure and cut insulation to be install
· Install pipe insulation
· Install vapor barrier
· Install metal cladding
· Mix chartek7 according to specification
· Apply chartek7 to pipe
· Install HK-1 mesh
· Work as for Client Specification
· Ask QA / QC personnel to check the job being done and their go signal to proceed to the next job / procedure
· Report with supervisor and Area Authority about the status on the work
· Housekeeping before, during and after work are done
CJI / SiteServ J.V. Inc.
Malampaya OGP (Onshore Gas Plant)
Tabangao, Batangas City, Batangas, Philippines
Insulator / Chartek applicator / Blaster / Painter
December 01, 2013 to August 15, 2014
Duties and Responsibilities:
· Attend morning safety meeting
· Attend tool box meeting
· Secure the work area is safe to work in (barrages and signage)
· Check the condition of the work piece if it is safe to work on to Arrange all the tools and equipment to be use
· Install / dismantle temporary habitat for blasting
· Manual De-rusting / Grit Blasting of pipe and vessel
· Spray / manual painting of pipe and vessel
· Prepare insulation material and tool to be use
· Measure and cut insulation to be installed
· Fabricate insulation for pipe elbow, tee, reducer, and etc
· Install hot / cold insulation prior to client specification
· Install vapor barrier
· Install GRP / metal cladding
· Mix chartek7 according to specification
· Apply chartek7 to pipe
· Install HK-1 mesh
· Work as for Client Specification
· Housekeeping before, during and after work are done
Atlantic, Gulf & Pacific Company of Manila Inc. (AG&P)
Heavy Fabrication Yard
San Roque, Bauan, Batangas
AG&P / Bechtel GLNG Plant Module Project
Insulator
December 08, 2012 to October 07, 2013
Duties and Responsibilities:
· Attend daily tool box meeting to know work priority and safety acknowledgement.
· Practice good housekeeping before and after work.
· Prepare insulation material and tool to be use
· Measures and cut insulation to be installed
· Fabricate insulation for pipe elbow, tee, reducer, and etc
· Install hot / cold insulation prior to client specification
· Install vapor barriers on pipe insulation before cladding
· Install Cladding after insulation are install and check by Quality Assurance
· Cover insulation properly before leave work area
Joel Chavez Construction and General Services
#768 Libjo, D’hope, Batangas City, Batangas Philippines 4200
Instrument technician
June 08, 2008 to December 07, 2012
Duties and Responsibilities:
· Attend daily tool box meeting to know work priority and safety acknowledgement.
· Practice good housekeeping before and after work.
· Checking of Industrial Instrument
· Calibration of Industrial Instrument (Pressure, temperature and Flow)
· Assist Maintenance in Instrument Fitting and mechanical work.
· Disassembling and assembling of instrument in way of mechanic work
· Cable lay-out to replace damage instrument cable.
· Fabricate and install new pipe tubing of pressure indicator and relief valve
· Replace defective solenoid
· Install new solenoid ball valve
· Measures and cut insulation to be installed
· Remove / Re-install cladding and insulation in preparation for maintenance request
Keppel Batangas Shipyard
Brgy. San Miguel, Bauan, Batangas
Shipwright Project Trainee Engineer
January 16, 2008 to May 23, 2008
Duties and Responsibilities:
· Attend meeting with owner representative, department engineer about the work to be done.
· Make schedule and step of work to be done.
· Coordinate with other department prior to the work to be done
· Checking of Industrial Instrument
· Calibration of Industrial Instrument (Pressure, temperature and Flow)
· Assist Electrician and Mechanical department in pipe and wiring installation
· Supervise ship jet wash and grit blasting
· Supervise Carpentry work and insulation installation
· Make schedule of work for contractor
· Attend daily meeting for reporting daily work accomplishment
· Make work report and acceptance report for owner and commercial department
EDUCATIONAL ATTAINMENT
Short Course : I&E Industrial System Services, Inc
Instrumentation Training Division
Libjo, Batangas City
June 2006 to December 2006
Course : Industrial Instrumentation
Tertiary : AMA Computer College
Beredo Building Kumintang Ibaba, Batangas City
2000-2004
Course : Bachelor of Science in Computer Engineering
Vocational : University of Batangas
Hilltop, Batangas City, Batangas, Philippines
1997-1999
Course : Electronics and Computer Technology
Secondary : Western Philippine Colleges
Hilltop, Batangas City
1991-1996
Primary : San Isidro Elementary School
San Isidro, Batangas City
1985-1991
TRAINING
Basic Occupation Safety and Health Training Course (BOSH)
Salus Consultancy Services
Red Cross, Kumintang, Batangas City, Batangas, Philippines
July 29, 2018 to August 19, 2018
Further Offshore Emergency Training
Consolidated Training System Incorporated
4F S&L bldg., 1500 Roxas Blvd., Ermita, Manila, Philippines
August 24, 2018
IRATA 1 Rope Access Technician
KB Associates Group of Company & Training Centres
No. 15 Changi North Street 1, I-Lofts @ Changi, #01-36, Singapore 498765
August 14, 2017 – August 18, 2017
Chartex 07(International Paint LTD)
CJI General Service
San Pascual, Batangas, Philippines
October 08, 2013 to October 27, 2013
Thermal Insulation and Sheet Metal Fabrication
Batangas Association for Guaranteed Metal Craft and Engineering Technology (BAGMET)
Libjo, Tacad, Batangas City
May 30, 2012 to June 20, 2012
Industrial Instrumentation Training Course
I&E Industrial System Service, INC
Tacad, Libjo, Batangas City
June 17, 2006 to October 24, 2006
CHARACTER REFERENCES
Mr. Doug Watts
Supervisor
Cape PNG Project
Mr. Arnel C. Catilo
Operation Manager
Joel Chavez Corporation
Operation Manager Libjo, Batangas City, Batangas
(043) 403-8888
Mr. Anicito Suarez
Insulation Supervisor
SiteServ Inc
Malampaya OGP (Onshore Gas Plant)
Tabangao, Batangas City, Batangas, Philippines
0928 667 1792