Photo

Alvin duran commisioning supervisor pipin at hyundai contractions and enginering

United Arab Emirates

 

 

 

 

DURAN, ALVIN MENDOZA

KABULUSAN PAKIL, LAGUNA

# =971-562830593

[email protected]

 

POSITION APPLIED:     ANY CONSTRUCTION WORKS

 

 

Objective:

 

To apply and enhance my experience in piping works underground and above ground in both fabrication and erection  in various Mechanical process in project engineering by gaining employment in a professional environment and to play an effective and essential worldwide organization taking Positive, pro active rules in the development efforts and further  wide development and implementation locally or overseas.

 

 

Career Summary:

 

10 years extensive experienced within the Oil & Gas, Chemical Plant, Cement Plant, Power plant and Fertilizer industries. Onshore gas processing and refining complex at operational and multi-skill roles in construction.

 

 

Professional Experience:

 

 

Company               : HYUNDAI ENGINEERING AND CONSTRUCTION

ZIRKU   Island, Abu Dhabi   UAE

 

Project                   : SARB PROJECT

Client                     : ADMA/ADNOC

 

Position                                : Piping Supervisor / Commissioning Supervisor (COMMISSIONING DEPT)

Date                       : MAY 27, 2018 up to PRESENT

 

 

Ø  Designated as Piping/Commissioning Supervisor in Sarb  projects.

Ø  Plan, implement and supervise the daily construction and Commissioning activities on site. Manage schedule and delegate tasks of over 40 persons.

Ø  Coordinate with site Superintendent to resolve site issues such drawing discrepancies that require field engineering involvement.

Ø  Supervise the daily commissioning activities on-site, Air blowing, steam blowing, Oil plashing and Dry Lay-up. Manage schedule and delegate tasks.

Ø  Prepare tools and equipment requests

Ø  Responsible to indorse if any comments and punch list made by the inspection team.

Ø  Prepare progress reports and inventories.

Ø  Preside over toolbox meeting with in-house safety officers to highlight commissioning safety in the ranks.

 

 

 

Company               : HYUNDAI ENGINEERING AND CONSTRUCTION

Al Ruwais,   Abu Dhabi   UAE

 

Project                   : BOROUGE 3 AND 4 POLYETHYLENE

Client                     : BOROUGE/ADNOC

 

Position                                : Piping Foreman / Acting Commissioning Supervisor (COMMISSIONING DEPT)

Date                       : OCT 1, 2012 up to MAY 26, 2018

 

 

Ø  Designated as Piping/Commissioning Supervisor in Borouge 3 and 4 projects.

Ø  Plan, implement and supervise the daily construction and Commissioning activities on site. Manage schedule and delegate tasks of over 25 persons.

Ø  Coordinate with site Superintendent to resolve site issues such drawing discrepancies that require field engineering involvement.

Ø  Supervise the daily commissioning activities on-site, Air blowing, steam blowing, Oil plashing and Dry Lay-up. Manage schedule and delegate tasks.

Ø  Prepare tools and equipment requests

Ø  Responsible to indorse if any comments and punch list made by the inspection team.

Ø  Prepare progress reports and inventories.

Ø  Preside over toolbox meeting with in-house safety officers to highlight commissioning safety in the ranks.

 

 

 

Company               : HYUNDAI ENGINEERING AND CONSTRUCTION / ENI-SAIPEM JOINT VENTURE

Mesaieed Industrial city, Qatar (P.O.box 50167)

 

Project                   : QATAR FERTILIZER COMPANY-QAFCO 5&6 PROJECT

Client                     : QAFCO

 

Position                                : Piping Foreman (PRE-COMM)

Date                       : May 18, 2010 up to May 12, 2012

 

 

Ø  Designated as Piping Foreman in Qafco 5 and 6 projects.

Ø  Plan, implement and supervise the daily construction activities on site. Manage schedule and delegate tasks of over 30 persons.

Ø  Coordinate with site Superintendent to resolve site issues such drawing discrepancies that require field engineering involvement.

Ø  Supervise the daily commissioning activities on-site, Air blowing, steam blowing, Oil plashing and Dry Lay up. Manage schedule and delegate tasks.

Ø  Prepare tools and equipment requests

Ø  Responsible to indorse if any comments and punch list made by the inspection team.

Ø  Prepare progress reports and inventories.

Ø  Preside over toolbox meeting with in-house safety officers to highlight commissioning safety in the ranks.

 

 

Company               : DAEWOO ENGINEERING AND CONSTRUCTION COMPANY

Russia, Sakhalin Island

 

Project                   : L.N.G. PROJECT

RUSSIA

 

Position                 : Piping Lead-man

Date                        : Aug 16 2007 to Aug 15 2008

 

Ø   Piping plan arrangement, P&ID, ISO metric drawing, project requirements, standards and specification.

Ø  Coordination with area supervisor/foreman for inspection fit-up and visual.

Ø  Request and offer inspection to QC engineer   for acceptance.

Ø  Monitor and control the quality and workmanship of the crew.

Ø  Report any deficiency to area supervisor and inspection team to have advice and instruction to fix the problem.

Ø  Initiate an idea/solution for any isometric drawing deviation.

Ø  Review drawing, joint mapping, coordinates, elevation, size of pipes, fittings, and its material specification to prevent and minimize the problem in construction.

Ø  Responsible for any as built and revision when the line need to re route as per site condition.

Ø  Follow-up and expedite if any urgent joints prior for acceptance by the inspection team.

 

 

 

 

Company                : HYUNDAI ENGINEERING AND CONSTRUCTION

Assaluyeh, Iran

 

Project                   : GAS PLANT

IRAN

 

Position                 : Pipe Fitter

Date                        : January 21, 2006 to January 10, 2007

 

 

Ø  Piping plan arrangement, P&ID, ISO metric drawing, project requirements, standards and specification.

Ø  Coordination with area supervisor/foreman for inspection fit-up and visual.

Ø  Request and offer inspection to QC engineer   for acceptance.

Ø  Monitor and control the quality and workmanship of the crew.

Ø  Report any deficiency to area supervisor and inspection team to have advice and instruction to fix the problem.

Ø  Initiate an idea/solution for any isometric drawing deviation.

Ø  Review drawing, joint mapping, coordinates, elevation, size of pipes, fittings, and its material specification to prevent and minimize the problem in construction.

Ø  Responsible for any as built and revision when the line need to re route as per site condition.

Ø  Follow-up and expedite if any urgent joints prior for acceptance by the inspection team.

 

 

 

 

Company               : P. P. C.

MALAYA PILILIA RIZAL,   PHILIPPINES

 

Project                   : POWER PLANT

 

Position                 : Pipe Fitter

Date                        : October 21 2004 to October 18, 2005

 

 

 

 

Ø  Coordination with area supervisor/foreman for inspection fit-up and visual.

Ø  Request and offer inspection to QC engineer   for acceptance.

Ø  Monitor and control the quality and workmanship of the crew.

Ø  Report any deficiency to area supervisor and inspection team to have advice and instruction to fix the problem.

Ø  Initiate an idea/solution for any isometric drawing deviation.

Ø  Review drawing, joint mapping, coordinates, elevation, size of pipes, fittings, and its material specification to prevent and minimize the problem in construction.

Ø  Responsible for any as built and revision when the line need to re route as per site condition.

Ø  Follow-up and expedite if any urgent joints prior for acceptance by the inspection team.

 

 

Seminars & Training Attended               : PTW COMMISIONING PERMIT RECIEVER

Qatar Fertilizer Company

: REINSTATEMENT AND BOLT TORQUING

Qatar Fertilizer Company

: AGT (AUTHORIZED GAS TESTER)

Borouge 3 Project

 

 

Computer Literacy                                 : Basic Computer

 

 

Educational Attainment

 

College                                   : LYCEUM OF BATANGAS

Batangas City

2000 to 2003

BATCHELOR OF SCIENCE IN MARINE TRANSFORTATION

 

Secondary                            : LICEO DE PAKIL

PAKIL, LAGUNA

1996 to 2000

 

Primary                                  : KABULUSAN ELEMENTARY SCHOOL

Kabulusan Pakil, Laguna

1990 to 1996

Personal Profile
Date of Birth                                               : September 12, 1983

Sex                                              : Male

Civil Status                                 : Married

Citizenship                                  : Filipino

Religion                                      : Catholic

Passport                                    :

 

I certify that this information is correct and complete, for whatever legal purpose it may serve.

DURAN, ALVIN MENDOZA
Applicant’s Signature

Education

2000-2003 PIpe fitter at Lyceum of Batangas

Experience

2008-up to present piping supervisor at Hyundai construction ang eng