DURAN, ALVIN MENDOZA
KABULUSAN PAKIL, LAGUNA
# =971-562830593
POSITION APPLIED: ANY CONSTRUCTION WORKS
Objective:
To apply and enhance my experience in piping works underground and above ground in both fabrication and erection in various Mechanical process in project engineering by gaining employment in a professional environment and to play an effective and essential worldwide organization taking Positive, pro active rules in the development efforts and further wide development and implementation locally or overseas.
Career Summary:
10 years extensive experienced within the Oil & Gas, Chemical Plant, Cement Plant, Power plant and Fertilizer industries. Onshore gas processing and refining complex at operational and multi-skill roles in construction.
Professional Experience:
Company : HYUNDAI ENGINEERING AND CONSTRUCTION
ZIRKU Island, Abu Dhabi UAE
Project : SARB PROJECT
Client : ADMA/ADNOC
Position : Piping Supervisor / Commissioning Supervisor (COMMISSIONING DEPT)
Date : MAY 27, 2018 up to PRESENT
Ø Designated as Piping/Commissioning Supervisor in Sarb projects.
Ø Plan, implement and supervise the daily construction and Commissioning activities on site. Manage schedule and delegate tasks of over 40 persons.
Ø Coordinate with site Superintendent to resolve site issues such drawing discrepancies that require field engineering involvement.
Ø Supervise the daily commissioning activities on-site, Air blowing, steam blowing, Oil plashing and Dry Lay-up. Manage schedule and delegate tasks.
Ø Prepare tools and equipment requests
Ø Responsible to indorse if any comments and punch list made by the inspection team.
Ø Prepare progress reports and inventories.
Ø Preside over toolbox meeting with in-house safety officers to highlight commissioning safety in the ranks.
Company : HYUNDAI ENGINEERING AND CONSTRUCTION
Al Ruwais, Abu Dhabi UAE
Project : BOROUGE 3 AND 4 POLYETHYLENE
Client : BOROUGE/ADNOC
Position : Piping Foreman / Acting Commissioning Supervisor (COMMISSIONING DEPT)
Date : OCT 1, 2012 up to MAY 26, 2018
Ø Designated as Piping/Commissioning Supervisor in Borouge 3 and 4 projects.
Ø Plan, implement and supervise the daily construction and Commissioning activities on site. Manage schedule and delegate tasks of over 25 persons.
Ø Coordinate with site Superintendent to resolve site issues such drawing discrepancies that require field engineering involvement.
Ø Supervise the daily commissioning activities on-site, Air blowing, steam blowing, Oil plashing and Dry Lay-up. Manage schedule and delegate tasks.
Ø Prepare tools and equipment requests
Ø Responsible to indorse if any comments and punch list made by the inspection team.
Ø Prepare progress reports and inventories.
Ø Preside over toolbox meeting with in-house safety officers to highlight commissioning safety in the ranks.
Company : HYUNDAI ENGINEERING AND CONSTRUCTION / ENI-SAIPEM JOINT VENTURE
Mesaieed Industrial city, Qatar (P.O.box 50167)
Project : QATAR FERTILIZER COMPANY-QAFCO 5&6 PROJECT
Client : QAFCO
Position : Piping Foreman (PRE-COMM)
Date : May 18, 2010 up to May 12, 2012
Ø Designated as Piping Foreman in Qafco 5 and 6 projects.
Ø Plan, implement and supervise the daily construction activities on site. Manage schedule and delegate tasks of over 30 persons.
Ø Coordinate with site Superintendent to resolve site issues such drawing discrepancies that require field engineering involvement.
Ø Supervise the daily commissioning activities on-site, Air blowing, steam blowing, Oil plashing and Dry Lay up. Manage schedule and delegate tasks.
Ø Prepare tools and equipment requests
Ø Responsible to indorse if any comments and punch list made by the inspection team.
Ø Prepare progress reports and inventories.
Ø Preside over toolbox meeting with in-house safety officers to highlight commissioning safety in the ranks.
Company : DAEWOO ENGINEERING AND CONSTRUCTION COMPANY
Russia, Sakhalin Island
Project : L.N.G. PROJECT
RUSSIA
Position : Piping Lead-man
Date : Aug 16 2007 to Aug 15 2008
Ø Piping plan arrangement, P&ID, ISO metric drawing, project requirements, standards and specification.
Ø Coordination with area supervisor/foreman for inspection fit-up and visual.
Ø Request and offer inspection to QC engineer for acceptance.
Ø Monitor and control the quality and workmanship of the crew.
Ø Report any deficiency to area supervisor and inspection team to have advice and instruction to fix the problem.
Ø Initiate an idea/solution for any isometric drawing deviation.
Ø Review drawing, joint mapping, coordinates, elevation, size of pipes, fittings, and its material specification to prevent and minimize the problem in construction.
Ø Responsible for any as built and revision when the line need to re route as per site condition.
Ø Follow-up and expedite if any urgent joints prior for acceptance by the inspection team.
Company : HYUNDAI ENGINEERING AND CONSTRUCTION
Assaluyeh, Iran
Project : GAS PLANT
IRAN
Position : Pipe Fitter
Date : January 21, 2006 to January 10, 2007
Ø Piping plan arrangement, P&ID, ISO metric drawing, project requirements, standards and specification.
Ø Coordination with area supervisor/foreman for inspection fit-up and visual.
Ø Request and offer inspection to QC engineer for acceptance.
Ø Monitor and control the quality and workmanship of the crew.
Ø Report any deficiency to area supervisor and inspection team to have advice and instruction to fix the problem.
Ø Initiate an idea/solution for any isometric drawing deviation.
Ø Review drawing, joint mapping, coordinates, elevation, size of pipes, fittings, and its material specification to prevent and minimize the problem in construction.
Ø Responsible for any as built and revision when the line need to re route as per site condition.
Ø Follow-up and expedite if any urgent joints prior for acceptance by the inspection team.
Company : P. P. C.
MALAYA PILILIA RIZAL, PHILIPPINES
Project : POWER PLANT
Position : Pipe Fitter
Date : October 21 2004 to October 18, 2005
Ø Coordination with area supervisor/foreman for inspection fit-up and visual.
Ø Request and offer inspection to QC engineer for acceptance.
Ø Monitor and control the quality and workmanship of the crew.
Ø Report any deficiency to area supervisor and inspection team to have advice and instruction to fix the problem.
Ø Initiate an idea/solution for any isometric drawing deviation.
Ø Review drawing, joint mapping, coordinates, elevation, size of pipes, fittings, and its material specification to prevent and minimize the problem in construction.
Ø Responsible for any as built and revision when the line need to re route as per site condition.
Ø Follow-up and expedite if any urgent joints prior for acceptance by the inspection team.
Seminars & Training Attended : PTW COMMISIONING PERMIT RECIEVER
Qatar Fertilizer Company
: REINSTATEMENT AND BOLT TORQUING
Qatar Fertilizer Company
: AGT (AUTHORIZED GAS TESTER)
Borouge 3 Project
Computer Literacy : Basic Computer
Educational Attainment
College : LYCEUM OF BATANGAS
Batangas City
2000 to 2003
BATCHELOR OF SCIENCE IN MARINE TRANSFORTATION
Secondary : LICEO DE PAKIL
PAKIL, LAGUNA
1996 to 2000
Primary : KABULUSAN ELEMENTARY SCHOOL
Kabulusan Pakil, Laguna
1990 to 1996
Personal Profile
Date of Birth : September 12, 1983
Sex : Male
Civil Status : Married
Citizenship : Filipino
Religion : Catholic
Passport :
I certify that this information is correct and complete, for whatever legal purpose it may serve.
DURAN, ALVIN MENDOZA
Applicant’s Signature