NAME: ANTONIO A. CURA JR.
POSITION DESIRED : INSTRUMENT SUPERVISOR
ADDRESS : Blk. 36, Lot 12, Taupe Street, Phase 2, Mansfield
Residences, Sto. Domingo, Angeles City, Pampanga
TEL/ C.P NOS. : +639186487226
EMAIL : [email protected]
BIRTHDATE : November 6, 1967
NATIONALITY : Filipino
CIVIL STATUS : Married
HEIGHT : 5’8”
WEIGHT : 150 lbs.
JOB DESCRIPTION:
• Get instruction to my senior supervisor.
• Coordinates my superior regarding the work activities and time table compilation of drawing as per revision.
• Study the method of statement of work.
• Give an instruction to my sub-ordinates for their daily work assignment.
• Study first the drawing before you perform in actual to save time and effort.
• Implement safety rules and regulation to my sub-ordinates and perform a tool box meeting.
• Pulling primary and secondary cables, perform IR test, termination control panel and junction box to field instrument.
• Special work loop check of control cables instruments for DCMS panel to local panel JB and field instrument.
• Special loop check interconnection wiring diagram DCMS panel, switchgear and local panel.
• Modify works, troubleshoot and calibration test of instruments.
• Monitoring of switchgear room and MCC.
• Provide power supply for air-cooled condensing, units and handling units.
• Perform insulation test, continuity test and operation test of electrical equipment.
• Report the daily progress of the project’s production.
• Install a device on field instrument as per hook up drawing.
WORK EXPERIENCE:
A.
Job Title : Instrument Supervisor
Date : April 17, 2018 to April 23, 2019
Company : Daesun Electric and Communication LLC
Project : Liwa Plastic Industrial Complex Project-EPC 3
Job Title : Instrument Supervisor
Date : June 14, 2014 to January 14, 2016
Company : GS Neotek Co. Ltd.
Project : Kemya SEP HALOBUTYL Project
Job Title : Instrument Supervisor
Date : February 6, 2012 to February 5, 2014
Company : CHANG WOON EMIRATES GENERAL CONTRACTING LLC,
SUB CONTRACTOR FOR SK ENGINEERING & CONSTRUCTION
COMPANY
Project : Ruwais Refinery Expansion Project, (EPC #1)
Ruwais, Abu Dhabi, U.A.E
Job Title : Instrument Supervisor
Date : September 22, 2010 to December 20, 2011
Company : SK ENGINEERING & CONSTRUCTION
Project : ADCO-BAB GAS Compression Project
Habshan, Abu Dhabi, U.A.E
Job Title : Instrument Supervisor
Date : November 1, 2009 – March 28, 2010
Company : SK engineering & construction
SK KOC GC-24 Project Office Building No. 256, Street 85, Block No. 4
Sulaibikhat, Kuwait
Project : KOC NEW GC-24 Project
Job Title : Instrument Supervisor
Date : January 1, 2009 – October 31, 2009
Company : SK engineering & construction
P.O. Box: 9175, Ahmadi 61002 – Kuwait
Project : Kuwait, KPPC Aromatic Project
Job Title : Instrument Supervisor
Date : September 12, 2007 – December 31, 2008
Company : SK engineering & construction
SK KOC GC-11 Project Office Building No. 83, Street 13, Block No. 3
Al-Mangaf, Kuwait
Project : KOC GC-11 Project
Job Title : Instrument Foreman
Date : October 2005 – November 2006
Company : Dong Yeong Engineering and Construction Co. Ltd.
(Khalid S. Al-Shahrani)
Project : Saudi Aramco 3rd Party Cogenaration Program Ju’aymah Coggn. Plant
WORK EXPERIENCE:
B.
Job Title : Instrument Foreman
Date : June 19, 2004 – June 17, 2005
Company : Al-Hasoun Sejong Eletromechanical Est.
P.O. Box 34794 Abu Dhabi, U.A.E.
Project : UMM Alnar 1550MW Independent Water Power Plant Project
Job Title : Electrical and Instrument Technician
Date : August 25, 2001 – July 10, 2002
Company : Saudi Shinwha Co. Ltd.
P.O. Box 10379 Madinat AL-Jubail Al-Sinaiyah 31961 K.S.A.
Project : United States Lube Oil Company Ltd.
Job Title : Instrument Fitter
Date : September 19, 2000 – October 2000
Company : Hyundai Engineering and Construction Co. Ltd.
P.O. Box 50167 Mesaieed, State of Qatar
Project : NGL-3 Plant of Qatar General Petroleum Corp. (SHUTDOWN)
Job Title : Instrument Fitter
Date : June 21, 1998 – November 24, 1998
Company : Dong Yeong Engineering and Construction Co. Ltc.
P.O. Box 634, ABQAIQ 31992 K. S. A.
Project : Shaybah Project
Job Title : Instrument Fitter
Date : May 20, 1997 – November 24, 1998
Company : Saudi Shinwha Co. Ltd.
P.O. Box 37892, Al Doha 31942, K. S. A.
Project : Al-Khoabar Power and Desalination Plant