C:UsersUSERDownloadsAOB Resume_10012018 (2).doc
Experience
November 09, 2017 – Present New Flavor House, Inc.
Production Supervisor Malabon City, Manila,
Spray Dryer & Dehydration Process Philippines
Duties and Responsibility:
• Responsible for PRS Purchase request of RM Raw Materials needed for the production of a certain products for our Clients Order.
• Responsible for the Dehydration of a certain products per Clients Order from RM to finished powder products. Make sure all the process for Dehydration is with compliance to Company Food and Safety Guidelines.
• Inspection of Raw Materials and approval once passed all the test required by QA inspectors and Warehouse approval.
• Request all raw materials and ingredients needed in operation of a certain production activities.
• Make sure all employee follow company safety policy and proper hygine procedure during every products production.
• Clean and Sanitized all equipments everytime during start of operation and after the operation.
• Ensure all equipments are in good running condition prior to operational start-up.
• Reports all equipments/machine with unusual noise or problem to Engineering Maintenace and provide JRS Job request for correction or maintenance of the machines.
March 2014 – June 5, 2015 Wyeth Philippines, Inc.
Engineering Shifting Supervisor Cabuyao City, Laguna,
EMD Dispensing and Packaging Philippines
(Production Department)
Duties and Responsibilities
• Oversee all packaging and filling operations and documentation during the shift.
• Supervises troubleshooting of all packaging and filling equipment and ensure that Preventive Maintenance is done according to the schedule.
• Prepare daily activities for Mechanics, Electricians and Instrumentation Technicians.
• Scheduling of Instruments to be calibrated.
• Scheduling of Standard Instruments to be calibrated by third party.
• Giving recommendations and solutions to Reliability Engineer to correct equipment frequent problem.
• Ensure that all troubles/failure encountered with in the shift has breakdown analysis.
• Assisting Technicians for our section, troubleshooting on all PLC in the plant, doing recipe on InBatch (Wonderware) for new formulations and changes to the PLC, HMI and InTouch program.
• Ensure that all HMI panels are user friendly and working properly and operator easy access to operates the machines.
• Conduct bidding, submit project proposal to Factory Manager, conduct training and orientation for all contractors and bidders.
• Provided technical support to production Section. Ensure all equipments are in good working condition every start and end of working shift.
April 2010 – February 2013 Wyeth Philippines, Inc.
Engineering Supervisor Cabuyao, Laguna,
Automation and Controls Philippines
Duties and Responsibilities
• Ensure that all automation PLC, HMI, Workstation follow the correct VLAN.
• Ensure our Electrical and Instrumentation technicians updated with the latest software developments and enroll them for trainings and seminars.
• Team member on the Upgrade of old powder withdrawal system which is controlled by SLC 500 to Controllogix. Replacement of old CRT operator interface terminal to wonderware intouch, operator friendly access.
• Project lead in the installation of Vision Inspection System for Scoop at Packaging Lines.
• Team member on the replacement of 2 pouch fillers from borad base to PLC controlled machine with human machine interface due to End of Life of the spare parts.
• Giving recommendations and solutions to Reliability Engineer to correct equipment frequent problem on automation and controls aspect.
• Automation Lead for the packaging section, troubleshooting on all PLC in the plant, doing recipe on InBatch (Wonderware) for new formulations.
• Team Lead in the Relocation of 2 filler machine from old lines to Packaging Line 5. Responsible for the dismantling/disassemble and re-installation and operation.
• Reprogramming of Controllogix, SLC500, PLC5, CompactLogix, MicroLogix, RsView HMI, WonderWare HMI, PanelView Plus HMI.
• Coaching Electrical and Instrumentation Technicians in Troubleshooting and reprogramming of Controllogix, SLC500, PLC5, CompactLogix, MicroLogix, RsView HMI, WonderWare HMI, PanelView Plus HMI and InBatch Recipes.
October 1995 – April 2010 Wyeth Philippines, Inc.
Instrumentation Technician Cabuyao, Laguna,
Engineering and Maintenance Philippines
Duties and Responsibilities
• Performed installations, repairs, configurations, preventive and corrective maintenance and calibration of different process Instruments e.g. temperature, pressure, level, pH, flow, conductivity, density and weight indicators, recorders, transmitters, controllers and control valves.
• Performed preventive and corrective maintenance jobs on all laboratory equipment such as Steam Sterilizers, Ovens Incubators.
• Performed preventive and corrective maintenance on Clever Brooks Steam Boilers, Atlas-Copco Air Compressors, Culligan Water De-ionizer/Treatment System, Trained Chilled-water Compressors and Waste and water Treatment Plant instruments.
• Installs, configures and maintains various Variable Frequency Drive (VFD), e.g. Vacon, Eaton, IMO-Jaguar, Omron, Fuji , Schneider, Power Flex.
• Performed troubleshooting on all process system, spray dryer system, powder handling transport system, canning system, filler system and packaging system equipments malfunctions.
• Performed preventive and corrective maintenance on Powder Transport System and all Packaging Equipment.
• Performed calibrations of instruments in the production process as per schedule by the Engineering scheduler section.
June 1993 – June 1995 Al Hoty Establishment
Foreman/Instrumentation Al-khobar, Saudi Arabia
And Control System Kingdom of Saudi Arabia
Duties and Responsibilities
• Assigned under service agreement with Saudi Arabian Becthel Company for the Operation and Maintenace of King Fahd International Airport Projects and its power utilities in Dammam, Kingdom of Saudi Arabia.
• Oversee all process operations and documentation. Troubleshooting all HVAC process instrument/equipment and corrective maintenance.
• Performed all the services required to properly maintained the Airport facilities and subsystem equipments and other related equipments.
• Commissioning and valiudation of new airport projects and its sub-building sructures and equipments.
• Performed preventive maintenance works and activities assignements for Technicians. Trouble shooting and repairs. Works which includes calibration and servicing/ installation of instruments.
• Performed modification and improvements on equipment or instruments to meet proper operating requirements.
• Arrange with Bechtel Residence Engineers all defects and defeciencies found and settle down/discuss for proper maitenance.
April 1992 – June 1993 Al Hoty Establishment
Instrumentation Technician Al-khobar, Saudi Arabia
Instrumentation and Control Kingdom of Saudi Arabia
Duties and Responsibilities
• Assigned under service agreement with Saudi Arabian Becthel Company for the Operation and Maintenace (O&M) of King Fahd International Airport (KFIA) Projects and its power utilities in Dammam, Kingdom of Saudi Arabia.
• Duties include Preventive Maintenace on all Instrument and HVAC/FLSS Control system.
• Performed all the services required to properly maintained the Airport facilities and subsystem equipments and other related equipments.
• Attend to field services on calls reported equipments malfunction and evaluates defective equipments or instruments.
• Performed corrective maintenance works and activities. Trouble shooting and repairs. Performed preventive maintenance works which includes calibration and servicing/ installation of instruments.
• Performed modification and improvements on equipment or instruments to meet proper operating requirements.
Sept 1989 – April 1992 Alliance Textile Mills, Inc.
Electrician/Electronics Cabuyao, Laguna, Philippines
Technicians
Duties and Responsibilities
• Assigned in the Installation of new equipments/machines for New Plant 2. (Installation and Pre-operation Test) Inspect all spare parts and electronic devices are in good working condition prior to installation and assembly..
• A team member in the installation of additional equipments at Plant 1 . Performed pre-operational test prior to operation.
• Responsible for the company’s Electrical and Electronics Maintenance. Troubleshooting and diagnose instrument and control malfunctions.
• Performed other related duties as assigned or required. Reports and logs everyday accomplishmnent.
• Performed troubleshooting on various equipment on the production area in the manufacturing of threads for textile.
• Performed Preventive Maintenance on all Instrumentation and Controls including HVAC?FLSS system.
Sept 1989 – April 1992 ABS-CBN Broadcasting Network
Audioman/Studio Operator Quezon City
TV Engineering Department Philippines
Duties and Responsibilities
• Performed Television operation for Audio Sound systemand make sure all equipments and materials are in good working condition.
• Performed repair, maintenance job, on process instruments.
• Maintained good quality audio/sound system during every live shows or taping VTRs.
• Coordinates with TV operation center (TOC) by checking and sending audio and VTR signals after the show began.
• Assigned numbering system from the console all needed microphones and check and test each microphones after its operation. Maintained and cleaned the materials in the studio before and after the shows.
Sept 1989 – April 1992 Philippines Long Distance Telephone
Outside Tecnicians/ Company (PLDT)
Lineman Technician Calamba, Laguna, Philippines
Duties and Responsibilities
• Performed troubleshooting on various job order outside the plant facilities..
• Attend to service calls to provide corrective repairs of line malfunctions.
• Performed preventive maintenance on all outside facilities. Line inspections. Repairs and maintain line from foreign obstacles.
• Performed cable splicing and cable jointing, Installation of additional cable lines. Coordinates with Inside plant technicians/switch board operation to determine/detects cable with troubles.
• Performed routine chart replacement and recorer charts inpections to ensure proper operation.
Jan 1989 – Feb 1989 Pilipino Telephone Corporation
Electronics Technician Olongapo City, Philippines
( OJT)
• Performed servicing of inside plant equipments.
• Coordinates with outside plant technicians/lineman for the right console/switchboard to activates after completion and testing of job request from costumer/clients.
• Performed daily inspections of the facilities equipments. Back up battery and Generators facility.
Education
1981–1987 – University of the East – CM Recto Avenue,
Bachelor of Science in Electronic and Communication Engineering Metro Manila,
Collage Level Philippines
1977 – 1981 – Olongapo City National High School Olongapo City
Secondary Level Philippines
1971 – 1977 – Mabayuan Elementary School – Olongapo City, Zambales
Elementary Level Philippines
Interests
Operation and Maintenance, Repairs and troubleshooting, farming and Dairy milk cattle.
personal Profile
Filipino
62 Kg., 1.72 meters
Male
July 24, 1964
Married
Roman Catholic
54 years old